Application of the autoregressive model, grey model and biplot method to groundwater sources
Jelena Ratković, Dušan Polomčić, Zoran Gligorić, Dragoljub Bajić. "Application of the autoregressive model, grey model and biplot method to groundwater sources" in Proceedings of the XVIII Serbian Geological Congress, Divčibare, Serbia, 01-04 June 2022, Serbian Geological Society (2022)
-
Operational Efficiency Forecasting Model of an Existing Underground Mine Using Grey System Theory and Stochastic Diffusion Processes
Svetlana Štrbac Savić, Jasmina Nedeljković Ostojić, Zoran Gligorić, Čedomir Cvijović, Snežana Aleksandrović (2015)Svetlana Štrbac Savić, Jasmina Nedeljković Ostojić, Zoran Gligorić, Čedomir Cvijović, Snežana Aleksandrović. "Operational Efficiency Forecasting Model of an Existing Underground Mine Using Grey System Theory and Stochastic Diffusion Processes" in Mathematical Problems in Engineering (2015). https://doi.org/10.1155/2015/610307
-
Геолошке карте као подлоге за одрживо планирање снабдевања агрегатима (на примеру Републике Хрватске)
Симић Владимир, Мико Слободан, Крук Борис, Дедић Жељко, Животић Драгана, Андрић Невена, Mиладиновић Зоран (2014)Симић Владимир, Мико Слободан, Крук Борис, Дедић Жељко, Животић Драгана, Андрић Невена, Mиладиновић Зоран. "Геолошке карте као подлоге за одрживо планирање снабдевања агрегатима (на примеру Републике Хрватске)" in Зборник радова XVI Конгреса геолога Србије, Доњи Милановац, 22-25 мај 2014, Beograd:Српско геолошко друштво (2014): 743-744
-
Listvenite from Serbia as Gemstone Resource
Simić Vladimir, Šarić Kristina, Miladinović Zoran, Andrić Nevena, Vuković Nikola. "Listvenite from Serbia as Gemstone Resource" in Abstracts & Field Guides / 11th Workshop on Alpine Geological Studies & 7thEuropean Symposium on Fossil Algae, Schladming, September 2013 Published in Berichte der Geologischen Bundesanstalt no. 99, Wien:Geologische Bundesanstalt (2013): 86-86
-
Parameter determination of soil oscillation law using quotient of the relative growth increments of oscillation velocity and redused distances at “Kovilovača“ surface mine
Lutovac Suzana, Beljić Čedomir, Gligorić Zoran, Gluščević Branko. "Parameter determination of soil oscillation law using quotient of the relative growth increments of oscillation velocity and redused distances at “Kovilovača“ surface mine" in 5th International Symposium MINING AND ENVIRONMENTAL PROTECTION, Vrdnik, Serbia, Belgrade:University of Belgrade, Faculty of Mining and Geology (2015): 376-384
-
Listvenite as gemstone: the Antina Čuka occurrence (Eastern Serbia)
Vladimir Simić, Zoran Miladinović, Kristina Šarić, Nevena Andrić-Tomašević, Nikola Vuković, Rajko Kondžulović (2022)Vladimir Simić, Zoran Miladinović, Kristina Šarić, Nevena Andrić-Tomašević, Nikola Vuković, Rajko Kondžulović. "Listvenite as gemstone: the Antina Čuka occurrence (Eastern Serbia)" in Acta Montanistica Slovaca (2022). https://doi.org/ 10.46544/AMS.v27i4.14
-
Hybrid Stochastic-Grey Model to Forecast the Behavior of Metal Price in the Mining Industry
Zoran Gligorić, Miloš Gligorić, Dževdet Halilović, Čedomir Beljić, Katarina Urošević. "Hybrid Stochastic-Grey Model to Forecast the Behavior of Metal Price in the Mining Industry" in Sustainability (2020). https://doi.org/10.3390/su12166533
-
Need to Improve the Natural Aggregate Resources Supply in the City of Belgrade (Serbia)
Simić Vladimir, Abramović Filip, Andrić Nevena, Delić Ivana, Miladinović Zoran, Životić Dragana (2016)Simić Vladimir, Abramović Filip, Andrić Nevena, Delić Ivana, Miladinović Zoran, Životić Dragana. "Need to Improve the Natural Aggregate Resources Supply in the City of Belgrade (Serbia)" in Acta Montanistica Slovaca 3 no. 21, :Union of Metallurgy, Mining Industry and Geology of Slovak Republic, the Slovak Mining Society, the Faculty of Mining, Ecology, Process Control and Geotechnologies (FBERG) of the Technical University (2016): 191-199
-
An Underground Mine Ore Pass System Optimization via Fuzzy 0–1 Linear Programming with Novel Torricelli–Simpson Ranking Function
rudna sipka, optimizacija, fazi linearno programiranje, trouglasti graf, Toričelijeva tačka, funkcija rangiranjaDževdet Halilović, Miloš Gligorić, Zoran Gligorić, Dragan Pamučar. "An Underground Mine Ore Pass System Optimization via Fuzzy 0–1 Linear Programming with Novel Torricelli–Simpson Ranking Function" in Mathematics (2023). https://doi.org/10.3390/math11132914
-
Novel Hybrid MPSI–MARA Decision-Making Model for Support System Selection in an Underground Mine
objektivne težine kriterijuma, MPSI metoda, višekriterijumsko odlučivanje, MARA metoda, izbor sistema podgrade, podzemna eksploatacijaMiloš Gligorić, Zoran Gligorić, Suzana Lutovac, Milanka Negovanović, Zlatko Langović. "Novel Hybrid MPSI–MARA Decision-Making Model for Support System Selection in an Underground Mine" in Systems, MDPI AG (2022). https://doi.org/10.3390/systems10060248
-
Анализа утицаја искоришћења у преради на резултате оптимизације површинских копова
Стефан Митић (2024)Одређивање оптималних граница површинског копа је сложен и итеративни процес који захтева мултидисциплинарну експертизу, софистициране технике анализе и пажљиво разматрање геолошких, рударских, економских,техничких, еколошких и друштвених фактора. Оптимизација подразумева генерисање серије шкољки, површинског копа на основу различитих фактора прихода (Revenue factor) са итеративним кораком промене цене метала у односу на базну цену. Свака генерисана шкољка представља инкрементално повећање запремине резерви према инкременталном повећању продајне цене метала. Велики број техно -економских фактора утиче на овај процес, и промена сваког од њих ...оптимизација површинског копа, анализа границе копа, оптимална контура копа, лежиште Бувач, профит, искоришћење у преради, трошкови прераде руде... преради на резултате оптимизације површинских копова Стефан Митић Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Анализа утицаја искоришћења у преради на резултате оптимизације површинских копова | Стефан Митић | | 2024 | | http://dr.rgf.bg.ac.rs/s/repo/i ...
... yHeTux nojaTaka yro3opaBa Jla ce H3BprniH KopeKnuja. IIpaKa3 maHejJma 3a yHoc yrJIoBa KocHHa u Whittle cobTBepy naT je Ha caa/u 5.7. ___Siopo Sct: STEFAN MITIC DagcipDOn — slopo proMios 'lopa Type ig |oWe 2(20.,10,0) [ Messages | AgaProfe, Dclet Profi Impori Bearng Slope. 8 | Benehes forslgpe ...Стефан Митић. Анализа утицаја искоришћења у преради на резултате оптимизације површинских копова, 2024
-
Probabilistic analysis of anisotropic rock slope with reinforcement measures
During the construction of E75 highway through Grdelica gorge in Serbia, a major failure occurred in the zone of reinforced rock slope. Excavation was performed in highly anisotropic Paleozoic schist rock formation. The reinforcement consisted of the two rows of micropile wall with pre-stressed anchors. Forces in anchors were monitored with load cells while benchmarks were installed for superficial displacement measurements. The aim of the study is to investigate possible causes of instability considering different probability distributions of the ...Zoran Berisavljević, Dušan Berisavljević, Miloš Marjanović, Svetlana Melentijević. "Probabilistic analysis of anisotropic rock slope with reinforcement measures" in Geomechanics and Engineering (2023). https://doi.org/10.12989/gae.2023.34.3.285
-
Novel Methods in Multiple Criteria Decision-Making Process (MCRAT and RAPS)—Application in the Mining Industry
Multiple criteria decision making (MCDM) is a supporting tool which is widely spread in different areas of science and industry. Many researchers have confirmed that MCDM methods can be useful for selecting the best solution in many different problems. In this paper, two novel methods are presented and applied on existing decision-making processes in the mining industry. The first method is multiple criteria ranking by alternative trace (MCRAT) and the second is ranking alternatives by perimeter similarity (RAPS). These ...Katarina Urošević, Zoran Gligorić, Igor MIljanović, Čedomir Beljić, Miloš Gligorić. "Novel Methods in Multiple Criteria Decision-Making Process (MCRAT and RAPS)—Application in the Mining Industry" in Mathematics, MDPI (Basel, Switzerland) (2021). https://doi.org/10.3390/math9161980
-
The shear strength evaluation of rough and infilled joints and its indications for stability of rock cutting in schist rock mass
Construction of E75 highway section through Grdelica gorge was one of the most demanding projects realized in recent Serbian history. The alignment approximately 25 km long consists of several tens of bridges, two tunnels, three galleries and cuts with total length of 6 km. The alignment passes through highly anisotropic Palaeozoic schist rock formation of different weathering grades. This study focuses on shear strength properties of discontinuities, which are found to be the critical feature contributing to the occurrence ...Dušan Berisavljević, Zoran Berisavljević, Svetlana Melentijević. "The shear strength evaluation of rough and infilled joints and its indications for stability of rock cutting in schist rock mass" in Bulletin of engineering geology and the environment, Springer (2022). https://doi.org/10.1007/s10064-022-02580-8
-
A tool for identifying the criticality in the disordered systems with metastable dynamics
Svetislav Mijatović, Dragutin Jovković, Sanja Janićević, Stefan Graovac, Đorđe Spasojević. "A tool for identifying the criticality in the disordered systems with metastable dynamics" in Physica A: Statistical Mechanics and its Applications, Elsevier BV (2021). https://doi.org/10.1016/j.physa.2021.125883
-
A Model for Determining Fuzzy Evaluations of Partial Indicators of Availability for High-Capacity Continuous Systems at Coal Open Pits Using a Neuro-Fuzzy Inference System
This paper presents a model for determining fuzzy evaluations of partial indicators of the availability of continuous systems at coal open pits using a neuro-fuzzy inference system. The system itself is a combination of fuzzy logic and artificial neural networks. The system availability is divided into partial indicators. By combining the fuzzy logic and artificial neural networks, a model is obtained that has the ability to learn and uses expert judgment for that learning. This paper deals with the ...системи, континуални системи експлоатације (роторни багер-транспортер-дробилично постројење), рударство, расположивост, меко рачунарство, фази логика, ANN, ANFISMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović, Filip Miletić. "A Model for Determining Fuzzy Evaluations of Partial Indicators of Availability for High-Capacity Continuous Systems at Coal Open Pits Using a Neuro-Fuzzy Inference System" in Energies, MDPI AG (2023). https://doi.org/10.3390/en16072958
-
Steel Arch Support Deformations Forecast Model Based on Grey–Stochastic Simulation and Autoregressive Process
Relatively large deformations of the steel arch support in underground coal mines in the Republic of Serbia present one of the main problems for achieving the planned production of coal. Monitoring of the critical sections of the steel arch support in the underground roadways is necessary to gather quality data for the development of a forecasting model. With a new generation of 3D laser scanners that can be used in potentially explosive environments (ATEX), deformation monitoring is facilitated, while ...čelična podgrada, prognoza deformacija, vremenske serije, grey-stohastička simulacija, autoregresija, podzemni rudnik ugljaLuka Crnogorac, Suzana Lutovac, Rade Tokalić, Miloš Gligorić, Zoran Gligorić. "Steel Arch Support Deformations Forecast Model Based on Grey–Stochastic Simulation and Autoregressive Process" in Applied Sciences, MDPI AG (2023). https://doi.org/10.3390/app13074559
-
Multi-Criteria Fuzzy-Stochastic Diffusion Model of Groundwater Control System Selection
When considering data and parameters in hydrogeology, there are often questions of uncertainty, vagueness, and imprecision in terms of the quantity of spatial distribution. To overcome such problems, certain data may be subjectively expressed in the form of expert judgment, whereby a heuristic approach and the use of fuzzy logic are required. In this way, decision-making criteria relating to an optimal groundwater control system do not always have a numerical value. Groundwater control scenarios (alternatives) are identified through hydrodynamic ...expert judgment, linguistic variables, fuzzy dynamic TOPSIS, hydrogeology, groundwater control system, open-cast mine, geometric Brownian motionDušan Polomčić, Zoran Gligorić, Dragoljub Bajić, Miloš Gligorić, Milanka Negovanović. "Multi-Criteria Fuzzy-Stochastic Diffusion Model of Groundwater Control System Selection" in Symmetry, MDPI AG (2019). https://doi.org/10.3390/sym11050705
-
Imputing missing data using grey system theory and the biplot method to forecast groundwater levels and yields
Groundwater management is one of today’s important tasks. It has become necessary to seek out increasingly reliable methods to conserve groundwater resources. Dependable forecasting of the amounts of groundwater that can be abstracted in a sustainable manner requires longterm monitoring of the groundwater regime (rate of abstraction and groundwater levels). Monitoring of the groundwater source for the town of Bečej, Serbia had been disrupted for multiple years. The objective of the paper is to assess the possibility of reinterpreting ...Jelena Ratković, Dušan Polomčić, Zoran Gligorić, Dragoljub Bajić. "Imputing missing data using grey system theory and the biplot method to forecast groundwater levels and yields" in Geologia Croatica, Hrvatski geološki institut (2022). https://doi.org/10.4154/gc.2022.14
-
Development and Application of Methodology for Quantification of Overbreaks in Hard Rock Tunnel Construction
A methodology for determining overbreaks in hard rock tunnel construction using the drill-and-blast technique is presented in this paper. The methodology was developed for and applied to crystalline medium- to thick-bedded limestone, but it can be used in any jointed hard rock mass. Overbreaks are inevitable in hard rock tunnelling in a low-confinement environment (shallow tunnels up to several hundred meters deep) as a result of wedge failures along unfavourably oriented discontinuities caused by blasting. It is widely accepted ...hard rock, drill-and-blast, geological overbreak, technological overbreak, stability criterion, discontinuity orientation, tunnel constructionZoran Berisavljević, Dragoljub Bajić, Vojkan Jovičić. "Development and Application of Methodology for Quantification of Overbreaks in Hard Rock Tunnel Construction" in Applied Sciences, MDPI (2023). https://doi.org/10.3390/app13031379