Quantitative landslide risk assessment in the city of Tuzla
In the climate-changing conditions, geological environment interacts more dramatically with the urban fabric than before. The urbanization is expansive and more aggressive than before, but so are the weather extremes and long-term climate trends. In effect, many processes which can be triggered by either side, nature or engineering, are becoming more pervasive than before, and such is the case with landslides. Dealing and managing landslides requires few crucial steps, starting from collecting data on landslide location and typology – ...... both visually and numerically (high accurancy >75% and AUC of >0.85) and justifies landslide assessment in the future for many aspects of urban planning and related decision-making. mailto:milos.marjanovic@rgf.bg.ac.rs SCG-XIII INTERNATIONAL SYMPOSIUM ON LANDSLIDES. CARTAGENA, COLOMBIA- JUNE ...
... with disasters (Haque et al. 2016). Planners and decision-makers should become aware of such scenarios and anticipate for specific risks when planning infrastructural and other urban development. It is even more pronounced in the developing countries, which are entirely focused on infrastructural ...
... to be practiced and more involved in the legislation. It allows a better insight into critical parts, allows prioritization, and hence, better planning and preparedness in the case of emergency. This paper precisely addresses such issues in a case study of the City of Tuzla in Bosnia and Herzegovina ...Miloš Marjanović, Biljana Abolmasov, Cvjetko Sandić, Miralem Mulać, Petar Begović. "Quantitative landslide risk assessment in the city of Tuzla" in SCG-Xiii International Symposium on Landslides. Cartagena, Colombia- February 22-26, 2021, International Society for Soil Mechanics and Geotechnical Engineering (2021)
-
Geotechnical aspects of three dimensional stability analysis of landslides
Ćorić Slobodan, Čaki Laslo, Rakić Dragoslav, Ubiparip Boško, Berisavljević Zoran. "Geotechnical aspects of three dimensional stability analysis of landslides" in Planning, design, construction and renewal in the civil engineering : proceedings / 12 International Scientific Conference INDIS 2012, Novi Sad, 28-30 November 2012, Novi Sad:Faculty of Technical Sciences, Department of Civil Engineering and Geodesy (2012): 361-368
-
Energy Resources in the Republic of Serbia: Development Policy
Jovančić Predrag, Kolonja Božo, Ignjatović Dragan, Tanasijević Miloš, Madžarević Aleksandar, Krstić Vojislav (2014)Jovančić Predrag, Kolonja Božo, Ignjatović Dragan, Tanasijević Miloš, Madžarević Aleksandar, Krstić Vojislav. "Energy Resources in the Republic of Serbia: Development Policy" in Journal of Energy Sources, Part B: Economics, Planning and Policy, :Taylor & Francis (2014). https://doi.org/DOI: 10.1080/15567249.2014.896
-
Identification of the Best Available Renewable Energy Source for Electricity Production in Serbia
Around 2/3 of electricity production in Serbia originates from coal-fired thermal power plants. The most significant domestic coal deposits are lignite deposits, a type of low -quality coal that causes negative health, climate and environmental impacts during the combustion. To reduce those negative impacts on domestic electricity production and to promote environmental awareness, the Serbian Energy Sector Development Strategy and the National Action Plan for Use of Renewable Energy Sources indicate the plan for increasing the share of ...Strategija obnovljive energije, Održiva energija, Proizvodnja električne energije, Solarna energija, Biomasa, Hidroenergije, Energija vetra... respectively, and solar is in the last place. Taking into consideration the results, it can be con cluded that biom ass h as a certain priority in planning n ew pr oduction capacities to m eet dom est ic electr icity n eeds. ...Boban Pavlović, Dejan Ivezić, Marija Živković. "Identification of the Best Available Renewable Energy Source for Electricity Production in Serbia" in Conference on Sustainable Development of Energy, Water and Environment Systems, Sarajevo, 28.6.-2.7.2020., Faculty of Mechanical Engineering and Naval Architecture, Zagreb (2020)
-
Multicriteria Analysis and Optimization of Groundwater Control Systems with Variable Values of Criterion over Predefined Time Points
Milica Stepanović, Dragoljub Bajić, Dušan Polomčić. "Multicriteria Analysis and Optimization of Groundwater Control Systems with Variable Values of Criterion over Predefined Time Points" in Comptes rendus de l'Académie Bulgare des Sciences, "Prof. Marin Drinov" Publishing House of Bulgarian Academy of Sciences (2021). https://doi.org/10.7546/CRABS.2021.08.09
-
Multi-Criteria Fuzzy-Stochastic Diffusion Model of Groundwater Control System Selection
When considering data and parameters in hydrogeology, there are often questions of uncertainty, vagueness, and imprecision in terms of the quantity of spatial distribution. To overcome such problems, certain data may be subjectively expressed in the form of expert judgment, whereby a heuristic approach and the use of fuzzy logic are required. In this way, decision-making criteria relating to an optimal groundwater control system do not always have a numerical value. Groundwater control scenarios (alternatives) are identified through hydrodynamic ...expert judgment, linguistic variables, fuzzy dynamic TOPSIS, hydrogeology, groundwater control system, open-cast mine, geometric Brownian motionDušan Polomčić, Zoran Gligorić, Dragoljub Bajić, Miloš Gligorić, Milanka Negovanović. "Multi-Criteria Fuzzy-Stochastic Diffusion Model of Groundwater Control System Selection" in Symmetry, MDPI AG (2019). https://doi.org/10.3390/sym11050705
-
Uticaj geološke neizvesnosti u razvoju rudarskih projekata
Rudarstvo je industrija koja se nosi sa različitim vrstama neizvesnosti i rizika zbog svoje prirode i specifičnosti. Neizvesnost u rudarstvu može poticati iz različitih izvora i uticati na različite aspekte rudarskih projekata. Kao jedan od dominantnih faktora, ističe se geološka neizvesnost. Geološka neizvesnost igra ključnu ulogu u rudarstvu i može značajno uticati na procenu resursa i rezervi, planiranje eksploatacije, ekonomsku isplativost i upravljanje rizicima. Ova neizvesnost se ne može eliminisati, ali se uz primenu adekvatnih standarda i zakona može ...... and Mineral Reserves. Canadian Institute of Mining, Metallurgy and Petroleum. [5] Dimitrakopoulos R. (2018). Advances in Applied Strategic Mine Planning. Springer International Publishing. [6] Dimitrakopoulos, R., Farrelly, C. T., and Cheuiche Godoy, M. (2002). Moving forward from traditional ...
... the dominant factors. Geological uncertainty plays a key role in mining and can significantly affect resource and reserve estimation, exploitation planning, economic profitability and risk management. This uncertainty cannot be eliminated, but with the application of adequate standards and laws, it ...
... (grade of iron in the ore). The results were generated in the Whittle software package. Keywords: geological uncertainty, risk, pit optimization, planning 1. Uvod Savremeno rudarstvo izloženo je stalnom trendu pogoršanja uslova poslovanja. Mogućnost ostvarenja ekonomskih i drugih ciljeva rudarskog ...Petar Marković, Dejan Stevanović, Mirjana Banković. "Uticaj geološke neizvesnosti u razvoju rudarskih projekata" in XI Međunarodna konferencija "Ugalj i kritični minerali 2023", CCM 2023, Zlatibor, 11-14. oktobar 2023., Beograd : Jugoslovenski komitet za površinsku eksploataciju (2023)
-
Present Situation and Alternative Water Supply Solutions for Northern Vojvodina (Serbia)
The northern part of the Autonomous Province of Vojvodina is situated in the central and southeastern sectors of the Pannonian Basin. Drinking water supply is provided by groundwater abstraction from depths of 60 to 200 m. The quality of that water is poor, especially due to high concentrations of arsenic which most water supply systems do not remove. Current planning documents call for the construction of large regional water supply schemes on the banks of the Danube and Tisa ...Bojan Hajdin, Vesna Ristić-Vakanjac, Dušan Polomčić. "Present Situation and Alternative Water Supply Solutions for Northern Vojvodina (Serbia)" in Proceedings of Bulgarian Academy of Sciences, "Prof. Marin Drinov" Publishing House of Bulgarian Academy of Sciences (2020). https://doi.org/10.7546/CRABS.2020.04.09
-
Development of Integrated Fuzzy Model for Mine Management Optimization
Miodrag Čelebić, Sanja Bajić, Dragoljub Bajić, Dejan Stevanović, Duško Torbica, Vladimir Malbašić (2023)Technoeconomic, environmental and safety criteria generally affect the management of metallic and non-metallic mining operations. The first basic question that needs to be addressed when planning ore mining is which methods are adequate and what is the optimal mining technology? Due to the complex geologic framework of ore deposits, geological exploration has rendered synonymous the inherent uncertainties, vagueness, and inaccuracies. As a result, subjective evaluation by engineers and expert experience have become increasingly important. Given that the natural language ...Miodrag Čelebić, Sanja Bajić, Dragoljub Bajić, Dejan Stevanović, Duško Torbica, Vladimir Malbašić. "Development of Integrated Fuzzy Model for Mine Management Optimization" in Comptes rendus de l’Académie Bulgare des Sciences, Bulgarian Academy of Sciences (2023). https://doi.org/10.7546/CRABS.2023.09.12
-
Optimizacija faznog razvoja Površinskog kopa Ciganuša – Škorac u cilju definisanja dugoročne dinamike eksploatcije
Definisanje dugoročne dinamike razvoja rudarskih radova koja je u potpunosti usaglašena sa strateškim ciljevima Investitora, veoma je zahtevan zadatak, koji vrlo često podrazumeva veliki broj ograničenja. Adekvatno definisana dinamika razvoja rudarskih radova treba da obezbedi dugoročne zahteve u pogledu kapaciteta, kvaliteta i raspodele resursa neophodnih za ispunjavanje strateških ciljeva, koji se po pravilu svode na ostvarenje maksimalnog profita. Uspešno definisanje dinamike eksploatacije (posebno kod metaličnih ležišta) u najvećoj meri zavisi od optimizacije faznog razvoja površinskog kopa, odnosno od pravilnog ...Dejan Stevanović, Petar Marković, Mirjana Banković, Milan Živković. "Optimizacija faznog razvoja Površinskog kopa Ciganuša – Škorac u cilju definisanja dugoročne dinamike eksploatcije" in XV Međunarodna konferencija OMC 2022, Zlatibor, 12-15. oktobar 2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Obuka za rukovaoce rudarskih mašina - primer uputstva za kreiranje treninga
U ovom radu je predstavljen primer uputstva za kreiranje obuke za pregled rudarskog kamiona. Iako je rudarska industrija zahtevna, kompleksna i delimično opasna, ona je važan segment privrede. Bezbednost i zdravlje na radu i obuka zaposlenih su sastavni deo procesa rada. Zbog toga, obuka zaposlenih je alat koji je suštinski važan za održavanje radnog procesa na odgovarajućem nivou, istovremeno čuvajući bezbednost i zdravlje zaposlenih, imovinu, i životnu sredinu. Postoje različite karakteristike zaposlenih kao i isplativost ulaganja koje takođe treba ...Lazar Žujović, Filip Miletić, Marko Lazić, Milan Miljković. "Obuka za rukovaoce rudarskih mašina - primer uputstva za kreiranje treninga" in XV Međunarodna konferencija ugalj 2022, Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Application of Project Management Process on Environmental Management System Improvement in Mining-Energy Complexes
... gases during spontaneous combustion of coal 2 3 1 + 1 + 0 + 0 + 1 + 1 24 Energies 2016, 9, 1071 10 of 20 Network Planning Technique—Critical Path Method (CPM) A network planning technique is a good starting point for project management, definition of activities, and representation of the logical ...
... during the operation of mining machines Discharge of waste mining and process waters Unfavorable location of the mine in relation to the catchment area A2 Irregular treatment of mine waters Discharge of untreated waste process water Occupation of large tracts of land Increasing the surface ...
... during the operation of mining machines Discharge of waste mining and process waters Unfavorable location of the mine in relation to the catchment area A2Irregular treatment of mine waters Discharge of untreated waste process water Occupation of large tracts of land Increasing the surface area ...Jelena Malenović Nikolić, Dejan Vasović , Ivana Filipović , Stevan Mušicki, Ivica Ristović . "Application of Project Management Process on Environmental Management System Improvement in Mining-Energy Complexes" in Energies (2016). https://doi.org/https://doi.org/10.3390/en9121071
-
Development and evaluation of fracture gradient curve model: a case study of south-central Kazakhstan
An accurate fracture gradient value is one of the most important issues in oil and gas well design and drilling. The value of a fracture gradient is a critical parameter for determining the drilling mud weight and selecting the proper depths for setting the casing in the planning process of drilling operations. This paper proposed the new curve model of fracture gradient for the south-central Kazakhstan (central Asia) region based on the analysis of leak-off test and format integrity ...Branimir Stanisavljevic, Vesna Karovic Maricic, Irena Isakov. "Development and evaluation of fracture gradient curve model: a case study of south-central Kazakhstan" in International Journal of Oil, Gas and Coal Technology, Inderscience Publishers (2022). https://doi.org/10.1504/IJOGCT.2023.128042
-
Towards a Mining Equipment Ontology
... Stanković, R., Vuković, F., Obradović, I.: An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System. In: Proceedings of the Fifteenth International Symposium on Mine Planning and Equipment Selection, Torino, Italy, Vol. 1, pp. 436-441, 2006. [6] Liadey D. M.: Spatial ...
... intended uses of the RudOnto is for production of appropriate terminological resources in sub-fields of mining engineering, such as, planning and management of exploitation, mine safety or mining equipment management. Such terminological resource have successfully been generated for the FMG e-learning platform ...
... inherited through specialization by several classes, which provide for more specific terminological resources, for example, for planning and management of exploitation, mine safety or mining equipment management. Within this paper we will go into further detail only for the part of the model pertaining ...Ranka Stanković, Ivan Obradović, Olivera Kitanović, Ljiljana Kolonja. "Towards a Mining Equipment Ontology" in Proceedings of the 12th International Conference Research and Development in Mechanical Industry, RaDMI 2012, September 2012, Vrnjačka Banja, Serbia no. 1, Vrnjačka Banja, Serbia : SaTCIP (Scientific and Technical Center for Intellectual Property) Ltd. (2012)
-
WebGIS Cadastre of Abandoned Mines in Autonomous Province of Vojvodina
Ranka Stanković, Nikola Vulović, Nikola Lilić, Ivan Obradović, Radule Tošović, Milica Pešić-Georgiadis (2015)... data. The application aspects are multiple, and relate not only to the relevant sectors of mining and geology, but also to economic, urban planning, spatial planning, agriculture, hydrology, ecology, safety and other sectors. Such a broad application base points to the main directions of further development ...
... all known abandoned mines on the territory of the AP Vojvodina their current state was registered, as a starting point for data storage, and for planning of resources for further remediation and recultivation. The geodatabase model of abandoned mines includes the name, geolocation, administrative ...
... When creating the database, special attention was devoted to functions for reporting that enable the management of sustainable development, spatial planning and environmental security. 5th International Symposium MINING AND ENVIRONMENTAL PROTECTION 10 - 13. June 2015., Vrdnik, Serbia ...Ranka Stanković, Nikola Vulović, Nikola Lilić, Ivan Obradović, Radule Tošović, Milica Pešić-Georgiadis. "WebGIS Cadastre of Abandoned Mines in Autonomous Province of Vojvodina" in Proceedings of the 5th International Symposium Mining And Environmental Protection,June 10-13,2015, Vrdnik, Serbia, Belgrade : Faculty of Mining and Geology (2015)
-
Application of Thermal Imaging in Surface Mining
Milanka Negovanović (2022)Termalno snimanje se sve više koristi u rudarskoj industriji kao jedan od dijagnostičkih alata za praćenje određenih proizvodnih procesa, kao i stanja opreme i mašina. Predstavlja nedestruktivnu i beskontaktnu metodu ispitivanja koja omogućava rano otkrivanje problema, planiranje održavanja sa minimalnim kvarovima, sprečavanje neplaniranih poremećaja, posmatranje materijala u nepristupačnim ili opasnim područjima i poboljšanje bezbednosti i produktivnosti. Termalno snimanje koristi specijalizovane termalne kamere sa unutrašnjim detektorima koji identifikuju veoma male temperaturne varijacije i proizvode sliku tog nevidljivog infracrvenog ili toplotnog ...Termalno snimanje, nedestruktivne metode testiranja, površinska eksploatacija, termalne kamere, rudarske operacijeMilanka Negovanović. "Application of Thermal Imaging in Surface Mining" in 15th International Conference OMC 2022, Zlatibor, 12-15th October 2022, Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Coal homogenization stockyard sizing “Tamnava – Zapad” case study
... Kazakhstan Mining Company Case Study. In Mine Planning and Equipment Selection (pp. 1017-1027). Springer International Publishing. 8. Stevanović D., Kolonja B., Stanković R., Knežević D., Jovanović M., “Application of stochastic models for mine planning and coal quality control”, ISSN 0354-9836 ...
... blending coals of various qualities produces the quality the customer demands. However, when the stockyard is connected with a mine (pit), it is used for homogenization of run-of-mine coal or other ore or material. In order to restrict the time necessary for homogenization activities, stockyards are divided ...
... moves this rule, because filling a shorter pile will take a shorter amount of time, and conversely, a longer pile takes longer to fill. Of course, planning pit operations as a function of block quality at the deposit can resolve this practical problem. Thus from the aspect of stockpiling, the size ...Božo Kolonja, Dinko Knežević, Ranka Stanković, Dejan Stevanović, Detlef Trummer. "Coal homogenization stockyard sizing “Tamnava – Zapad” case study" in Proceedings of 13th International Symposium Continuous Surface Mining, ISCSM 2016, / (2016)
-
Flood protection and water utilization of karst poljes: example of Gatačko Polje, Eastern Herzegovina
Tina Dašić, Ljiljana Vasić (2020)Earth-Surface Processes,Geology, Pollution, Soil Science, Water Science and Technology, Environmental Chemistry,Global and Planetary ChangeTina Dašić, Ljiljana Vasić. "Flood protection and water utilization of karst poljes: example of Gatačko Polje, Eastern Herzegovina" in Environmental Earth Sciences, Springer Science and Business Media LLC (2020). https://doi.org/10.1007/s12665-020-08987-4
-
Primary crusher site selection in open pit mines - case study in Sungun copper mine
Facility site selection, (such as Primary or in pit Crusher location) is one of the most important steps in mine de-sign process that has a significant impact on economy of the mining operation. This study covers an attempt to find the optimal location forprimary crusher in order to support the expansion of Sungun copper mine, which is the second largest open pit mine in Iran. Recent exploration drilling has led to a considerable increase in the ore reserve. Therefore, ...Ali Nasirinezhad, Dejan Stevanović, Dragan Ignjatović, Mehdi Rahmanpou. "Primary crusher site selection in open pit mines - case study in Sungun copper mine" in Underground mining engineering, Универзитет у Београду, Рударско-геолошки факултет (2021)
-
Analiza primene višekriterijumskih metoda u optimizaciji izbora hidruličnih bagera na površinskim kopovima uglja
Hidraulični bageri primenjuju se u različitim oblastima privrede a najzastupljeniji su u građevinarstvu i rudarstvu. Na površinskim kopovima sa kontinualnim sistemima, klasifikuju kao pomoćna mehanizacija a na površinskim kopovima sa diskontinualnim sistemima, kao osnovna mehanizacija. Kako je u oba slučaja njihova primena neizostavna, važno je izvršiti adekvatnu analizu postojećih podataka, u cilju optimizacije izbora tipa hidrauličnog bagera u odnosu na uslove rada datog površinskog kopa. U radu su opisane različite višekriterijumske metode koje su korišćene za analizu hidrauličnih bagera. ...... 2010. [8] Bescetin A, A decision support system using analy- tical hierarchy process (AHP) for the optimal envoi- rmental reclamation of an open-pit mine. Eviron- mental Geology, 52, pp. 663-672. 2007. [9] Mohamadibadi H S, Tichkowsky G, Kumar, A. De- velopment of a Multi-Criteria Assessment Model ...
... existing data in order to optimize the choice of the type of hydraulic excavator in relation to the working conditions of a particular open- cast mine. This paper aims to demonstrate the potential of multi-criteria optimization methods that are used in the analysis of hydraulic excavators. Different ...
... quality of output information which can affect the future purchasing decisions of this machinery. Key words: multi-criteria methods, open-cast coal mine, auxiliary machines, hydraulic excavators. https://doi.org/10.1016/j.procs.2015.07.081 https://doi.org/10.1016/j.procs.2015.07.081 ...Stevan Đenadić, Predrag Jovančić, Dragan Ignjatović, Filip Miletić, Ivan Janković. "Analiza primene višekriterijumskih metoda u optimizaciji izbora hidruličnih bagera na površinskim kopovima uglja" in Tehnika, Centre for Evaluation in Education and Science (CEON/CEES) (2019). https://doi.org/10.5937/tehnika1903369D