Претрага
7 items
-
Geotechnical conditions of “Debelo brdo” tunnel construction on the highway E-80: Nis-Merdare-Pristina (“Peace Highway”)
The construction of the highway E-80 has begun in Serbia, which will represent the traffic hub of the Western Balkans and will be part of the main regional transport network of Southeast Europe. Its total length through Serbia is 77 km, and one part of the route is designed through a typical plain terrain, while a larger part of the route passes through hilly terrain. The construction of the tunnel “Debelo brdo” is planned partly in an open cut ...Dragoslav Rakić, Irena Basarić Ikodinović, Radojica Lapčević, Dragan Lukić. "Geotechnical conditions of “Debelo brdo” tunnel construction on the highway E-80: Nis-Merdare-Pristina (“Peace Highway”)" in Proceedings of the XVIII ECSMGE 2024 geotechnical engineering challenges to meet current and emerging needs of society, Lisbon, 26-30 August 2024, CRC Press (2024). https://doi.org/10.1201/9781003431749-356 М33
-
Simulation of Hydrogeological Environmental Discharge in Case of Interruption Constant Observations
Marina Čokorilo Ilić, Dragoljub Bajić, Miroslav Popović. "Simulation of Hydrogeological Environmental Discharge in Case of Interruption Constant Observations" in International Scientific Conference - Sinteza 2024, Belgrade, 16. maj 2024, Singidunum University (2024). https://doi.org/10.15308/Sinteza-2024-288-294 М31
-
Geotehnički uslovi izgradnje tunela „Debelo brdo“ na autoputu E-80 Niš - Pločnik
Tunel „Debelo brdo“ nazvan je po najizraženijem relјefnom obliku na ovoj drugoj deonici autoputa E-80 Niš – Pločnik. Osnovnu geološku građu na lokaciji tunela čini Mio-Plioceni kompleks heterogenog litološkog sastava. Izgradnja tunela je predviđena delom u otvorenom iskopu dužine 240 m, a delom sa podzemnim iskopom dužine 190 m. U zoni tunela, padina je okarakterisana kao uslovno stabilna, pa bi neadekvatna zasecanja mogla da izazovu klizanja terena. Iz tih razloga, u okviru rada posebno su prikazani geotehnički uslovi izgradnje ...Dragoslav Rakić, Radojica Lapčević, Irena Basarić Ikodinović, Dragan Lukić. "Geotehnički uslovi izgradnje tunela „Debelo brdo“ na autoputu E-80 Niš - Pločnik" in Četvrti Srpski kongres o putevima, 2-3. jun 2022., Beograd : Srpsko društvo za puteve Via Vita (2022) М33
-
Development and Application of Methodology for Quantification of Overbreaks in Hard Rock Tunnel Construction
A methodology for determining overbreaks in hard rock tunnel construction using the drill-and-blast technique is presented in this paper. The methodology was developed for and applied to crystalline medium- to thick-bedded limestone, but it can be used in any jointed hard rock mass. Overbreaks are inevitable in hard rock tunnelling in a low-confinement environment (shallow tunnels up to several hundred meters deep) as a result of wedge failures along unfavourably oriented discontinuities caused by blasting. It is widely accepted ...hard rock, drill-and-blast, geological overbreak, technological overbreak, stability criterion, discontinuity orientation, tunnel constructionZoran Berisavljević, Dragoljub Bajić, Vojkan Jovičić. "Development and Application of Methodology for Quantification of Overbreaks in Hard Rock Tunnel Construction" in Applied Sciences, MDPI (2023). https://doi.org/10.3390/app13031379 М22
-
Hydrochemical impact of the hydraulic tunnel on groundwater in the complex aquifer system in Pirot, Serbia
Hidrogeohemijski procesi, hidrohemijske promene, karstna izdan, tunel pod pritiskom, multivarijantne statističke analizeMarina Ćuk, Igor Jemcov, Ana Mladenović, Marina Čokorilo Ilić. "Hydrochemical impact of the hydraulic tunnel on groundwater in the complex aquifer system in Pirot, Serbia" in Carbonates and Evaporites, Springer Science and Business Media LLC (2020). https://doi.org/10.1007/s13146-020-00563-y М23
-
Monitoring the Impact of Artificial Structure on Hydrogeological Environment: A Case Study of Hydraulic Tunnel at Pirot Hydropower Plant
Marina Čokorilo Ilić, Miroslav P. Popović, Dragoljub Bajić, Vesna Matović, Filip Abramović, Filip Alimpić (2024)hidroenergetski tunel, podzemne vode, hidrogeološki monitoring, pijezometri, fizičkohemijsko osmatranje, hidrometrija, unakrsna korelacijaMarina Čokorilo Ilić, Miroslav P. Popović, Dragoljub Bajić, Vesna Matović, Filip Abramović, Filip Alimpić. "Monitoring the Impact of Artificial Structure on Hydrogeological Environment: A Case Study of Hydraulic Tunnel at Pirot Hydropower Plant" in Sensors, MDPI AG (2024). https://doi.org/10.3390/s24206578 М21
-
Hydraulic impact of pressure transients from water conveyance tunnel on the complex hydrogeological system: A case study HPP
Tunel pod pritiskom, Unutrašnji pijezometri, Tranzijenti pritiska, Karstna izdan, Pukotinska izdan, Hidraulički odzivIgor Jemcov, Maja Todorović, Aleksandar Jemcov, Marina Ćuk Đurović. "Hydraulic impact of pressure transients from water conveyance tunnel on the complex hydrogeological system: A case study HPP" in Journal of Hydrology, Pirot, 2024, Elsevier BV (2024). https://doi.org/10.1016/j.jhydrol.2024.132068 М21а