The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers
Објеката
- Тип
- Рад у зборнику
- Верзија рада
- објављена
- Језик
- енглески
- Креатор
- Dragan Ignjatović, Predrag Jovančić, Stevan Đenadić, Ivan Janković, Ivica Ristović
- Извор
- 7th International Symposium Mining and Environmental Protection
- Уредник
- Ivica Ristović
- Издавач
- University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia
- Датум издавања
- 2019
- Сажетак
- One of the most important prerequisites for the successful operation of the open-cast lignite mine is to carry out all the auxiliary works timely with the necessary quality. The most important and most commonly used auxiliary machines are bulldozers. Engaging time of bulldozers use is in direct relation with the coefficients of the time and capacity utilization of the continuous system for the excavation of coal and tailings, which indicates their importance. More than 100 bulldozers have been hired on the open-cast lignite mines of Electric Power Industry of Serbia. |The life cycle of these machines is 5-10 years, so it is necessary to replace the complete equipment several times in the lifetime of the mine. The purchasing and the operational costs of auxiliary machines are high, and in the total cost of coal excavating mentioned cost are from about 1.5-2 €. All this points to the importance of choosing adequate type of bulldozer. Also, this paper defines the optimal bulldozer replacement period within the life cycle of that machine.
- почетак странице
- 286
- крај странице
- 292
- isbn
- 978-86-7352-354-5
- Subject
- open-cast coal mine, auxiliary works, bulldozers, optimization, availability
- Шира категорија рада
- М30
- Ужа категорија рада
- М33
- Права
- Отворени приступ
- Лиценца
- Creative Commons – Attribution-NonComercial 4.0 International
- Формат
Dragan Ignjatović, Predrag Jovančić, Stevan Đenadić, Ivan Janković, Ivica Ristović. "The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers" in 7th International Symposium Mining and Environmental Protection, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2019)
This item was submitted on 7. децембар 2021. by [anonymous user] using the form “Рад у зборнику радова” on the site “Радови”: http://dr.rgf.bg.ac.rs/s/repo
Click here to view the collected data.