Analiza sistema odvodnjavanja površinskog kopa Drmno od podzemnih voda sa severnim savršenim ekranom
Објеката
- Тип
- Рад у зборнику
- Верзија рада
- објављена
- Језик
- српски
- Креатор
- Tomislav Šubaranović, Dušan Polomčić, Vladimir Pavlović
- Извор
- Zbornik apstrakata sa 9. Međunarodne konferencije Ugalj, Zlatibor, 2019.
- Уредник
- Vladimir Pavlović
- Издавач
- Jugoslovenski komitet za površinsku eksploataciju
- Датум издавања
- 2019
- Сажетак
- Izrada nesavršenog ekrana do drugog sloja uglja na površinskom kopu Drmno, pored zadržavanja postojećih standardnih metoda odvodnjavanja od podzemnih voda linijama bunara, predviđena je poslednje decenije u celokupnoj rudarskoj projektnoj dokumentaciji. Iz objektivnih i subjektivnih razloga njegova realizacija nije ostvarena do danas. U međuvremenu je, uz dodatna geološka istraživanja i promenu dinamike i parametara sistema površinske eksploatacije, došlo do određenih značajnih prostornih promena geoloških i rudarskih uslova u eksploatacionom polju. Ovo je omogućilo preliminarno inoviranje pristupa procesu i konceptu odvodnjavanja površinskog kopa Drmno od podzemnih voda u prvoj fazi, koje je obrađeno kroz tri tehno-ekonomske varijante sa učešćem dinamike ulaganja kao finansijskog faktora [4]. Analiza je pokazala da nije moguće pouzdano braniti površinski kop od podzemnih voda postojećim i varijantnim sistemima odvodnjavanja posle 2047. godine. U drugoj fazi analize je obrađena je četvrta tehno-ekonomska varijanta sistema odvodnjavanja sa izradom savršenog ekrana ispred severne završne konture površinskog kopa Drmno prema reci Dunav. Realizacijom ove varijante sistema odvodnjavanja obezbeđuje se siguran rad površinskog kopa Drmno do kraja eksploatacionog veka.
- The construction of an imperfect screen to the second coal seam on the Drmno opencast mine has been planned in recent decades in the entire mining project documentation, in addition to retaining existing standard methods of drainage from groundwater by well lines. Due to objective and subjective reasons, its realization has not been achieved to date. In the meantime, with additional geological explorations and changes in the dynamics and parameters of the mining system, there have been some significant spatial changes in the geological and mining conditions in the mining field. This enabled a preliminary innovation of the approach to the process and concept of Drmno mine drainage in the first phase, which was examined through three techno-economic variants with the participation of the dynamics of investment as a financial factor [4]. The analysis showed that it is not possible to reliably protect a surface mine from groundwater by existing drainage systems beyond 2047. In the second phase of the analysis, the fourth techno-economic variant of the drainage system was elaborated with a creation of a perfect screen in front of the northern final contour of the Drmno mine, towards the Danube River. The implementation of this drainage system variant ensures the safe operation of the Drmno mine until the end of its mining cycle.
- почетак странице
- 297
- крај странице
- 305
- isbn
- 978-86-83497-26-3
- Subject
- podzemne vode, odvodnjavanje, bunari, ekran, dinamika, troškovi
- underground water, drainage, wells, screen, dynamics, costs
- Шира категорија рада
- М30
- Ужа категорија рада
- М34
- Права
- Отворени приступ
- Лиценца
- All rights reserved
- Формат
- Медија
- 9-2.pdf
Tomislav Šubaranović, Dušan Polomčić, Vladimir Pavlović. "Analiza sistema odvodnjavanja površinskog kopa Drmno od podzemnih voda sa severnim savršenim ekranom" in Zbornik apstrakata sa 9. Međunarodne konferencije Ugalj, Zlatibor, 2019., Jugoslovenski komitet za površinsku eksploataciju (2019)
This item was submitted on 18. јануар 2023. by [anonymous user] using the form “Рад у зборнику радова” on the site “Радови”: http://dr.rgf.bg.ac.rs/s/repo
Click here to view the collected data.