Претрага
436 items
-
Geometrijska kontrola projekta i određivanje elemenata za obeležavanje transportnog niskopa STN-2a u rudniku boksita Kosturi
Milutinović Aleksandar, Ganić Aleksandar, Tokalić Rade, Gligorić Zoran. "Geometrijska kontrola projekta i određivanje elemenata za obeležavanje transportnog niskopa STN-2a u rudniku boksita Kosturi" in Podzemni radovi no. 17, Beograd:Rudarsko-geološki fakultet, Beograd (2010): 21-28
-
Preliminary Examination of the System Fly Ash–Bottom Ash–Flue Gas Desulphurization Gypsum–Portland Cement–Water for Road Construction
Tokalić Rade, Marinković Slobodanka, Trifunović Prvoslav, Dević Gordana, Zildzović Snežana. "Preliminary Examination of the System Fly Ash–Bottom Ash–Flue Gas Desulphurization Gypsum–Portland Cement–Water for Road Construction" in Journal of Chemistry, :Hindawi Publishing Corporation (2013). https://doi.org/doi:10.1155/2013/421480
-
Examination of the possibilities of the application of waste materials (gypsum, fly ash and bottom ash) in construction
Trifunović Prvoslav, Marinković Slobodanka, Kostić-Pulek Aleksandra, Tokalić Rade, Popov Svetlana (2014)Trifunović Prvoslav, Marinković Slobodanka, Kostić-Pulek Aleksandra, Tokalić Rade, Popov Svetlana. "Examination of the possibilities of the application of waste materials (gypsum, fly ash and bottom ash) in construction" in Podzemni radovi no. 24, Beograd:Rudarsko-geološki fakultet (2014): 49-60
-
The effect of the content of unburned carbon in bottom ash on its applicability for road construction
Trifunović Prvoslav, Marinković Slobodanka, Tokalić Rade, Matijašević Srdjan. "The effect of the content of unburned carbon in bottom ash on its applicability for road construction" in Тhermochimica Acta, 20 January 2010 498 no. 1–2, Amsterdam, Netherlands:Elsevier BV (2010): 1-6. https://doi.org/10.1016/j.tca.2009.10.022
-
Defining of optimal geometry of drilling chisels blade for Led and Zinc ore
Savić Ljubinko, Tokalić Rade, Vidanović Nebojša, Trajković Slobodan, Ganić Aleksandar. "Defining of optimal geometry of drilling chisels blade for Led and Zinc ore" in Technics Technologies Education Management / TTEM 7 no. 4, Sarajevo, Bosnia & Herzegovina:DRUNPP, Sarajevo (2011): 866-875
-
Rock Stability Analysis On The Model Of Designed And Constructed Roadways In The Jama Bor
Zlatanović Dragan, Milisavlјević Vladimir, Tokalić Rade, Čebašek Vladimir. "Rock Stability Analysis On The Model Of Designed And Constructed Roadways In The Jama Bor" in Underground Mining Engineering - Podzemni radovi no. 26, :Univerzitet u Beograd - Rudarsko-geološki fakultet (2015): 35-47
-
Optimal Coal Supplier Selection for Thermal Power Plant Based on Mcrat Method
Miloš Gligorić, Katarina Urošević, Suzana Lutovac, Dževdet Halilović. "Optimal Coal Supplier Selection for Thermal Power Plant Based on Mcrat Method" in eNergetics 2021, Mathematical Institute of the Serbian Academy of Sciences and Arts, Belgrade, Serbia (2021)
-
Optimizacija utovarno-transportnih sistema u funkciji planiranja površinskog kopa
Mirjana V. Banković (2018-07-13)Profitabilna eksploatacija sve složenijih ležišta je težak zadatak koji zavisi odtemeljnog procesa analize, planiranja i projektovanja rudnika. Izvodljiv strateškiplan mora da zadovoljava društvena, regulatorna, tehnološka, geometrijska iekonomska ograničenja. Kako bi se postigao osnovni cilj, odnosno profitabilnost iodrživost rudarskog projekta na duži period, neophodno je unapređenjematematičkih modela i informatičke podrške procesima planiranja i optimizacijekoji će omogućiti efikasnu realizaciju ovih ciljeva...tehnološki model, integralni model, planiranje, optimizacija,utovarno-transportni sistem, neto sadašnja vrednost projekta... a uglja pa do isporuke uglja termoelektranama. Upravljanje istražnim geološkim podacima i izrada modela ležišta predstavljaju nerazdvojivi deo integralnog koncepta planiranja i skup poslova koji prethode izradi operativnih planova za potrebe optimizacije sistema eksploatacije. U tu svrhu je dat detaljniji ...
... baze Minex modeliranje uključuje: izradu gridova (mreža) krovine i podine ugljenih slojeva, i parametara kvaliteta uglja (DTE, sumpor, pepeo, vlaga, itd), izvoz podataka iz modela u formatu prilagođenom za dalje korišćenje, kao i kontrolu geološkog modela i izradu propratne grafičke dokumentacije. Ovome ...
... ...... 94 Slika 4.9 Dijagram aktivnosti definisanja dinamike i sekvenci eksploatacije ............. 95 Slika 4.10 Dijagram aktivnosti definisanja koncepta rekultivacije ................................. 96 Slika 4.11 Dijagram aktivnosti u okviru srednjeročnog planiranja ............................. ...Mirjana V. Banković. "Optimizacija utovarno-transportnih sistema u funkciji planiranja površinskog kopa" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2018-07-13)
-
Opening and development of the subhorizont at a level of 20m in mine Veliki Majdan - Ljubovija, Republic of Serbia
Mitić Saša, Milojević Dragan, Makar Nenad, Tokalić Rade. "Opening and development of the subhorizont at a level of 20m in mine Veliki Majdan - Ljubovija, Republic of Serbia" in Zbornik na trudovi PODEKS ’11 - V stručno sovetuvanje na tema: Tehnologija na podzemna eksploatacija na mineralni surovini – Makedonska Kamenica, 11-12.11.2011. 1, Makedonska Kamenica:Sojuz na rudarskite i geološkite inženeri na Makedonija (2011): 60-65
-
Analysis of the impact of blasting on construction facilites and environment in the preparation of the tunnel portal Sarlah near Pirot (south Serbia)
Ravilić Marina, Bogdanović Bojana, Lutovac Suzana, Bajić Sanja, Gaćina Radmila. "Analysis of the impact of blasting on construction facilites and environment in the preparation of the tunnel portal Sarlah near Pirot (south Serbia)" in XXIII International Conference „ECOLOGICAL TRUTH“ ECO-IST15, Kopaonik, Serbia, :University of Belgrade – Technical Faculty in Bor (2015): 212-217
-
Evaluation of Underground Zinc Mine Investment Based on Fuzzy-Interval Grey System Theory and Geometric Brownian Motion
Gligorić Zoran, Kričak Lazar, Beljić Čedomir, Lutovac Suzana, Milojević J.. "Evaluation of Underground Zinc Mine Investment Based on Fuzzy-Interval Grey System Theory and Geometric Brownian Motion" in Journal of Applied Mathematics, :Hindawi Publishing Corporation (2014)
-
3D modeling of terrain and spatial visualization of underground facilities in the Crveni breg mine
Crnogorac Luka, Gojković Zoran, Milutinović Aleksandar, Ganić Aleksandar, Tokalić Rade. "3D modeling of terrain and spatial visualization of underground facilities in the Crveni breg mine" in Časopis Podzemni radovi 1 no. 33, Beograd:Univerzitet u Beogradu, Rudarsko-geološki fakultet (2018): 17-30
-
Multi - Attribute Technological Modeling of Coal Deposits Based on the Fuzzy TOPSIS and C - mean Clustering Algorithms
Gligorić Miloš, Gligorić Zoran, Beljić Čedomir, Torbica Slavko, Štrbac-Savić Svetlana, Nedeljković Jasmina (2016)Gligorić Miloš, Gligorić Zoran, Beljić Čedomir, Torbica Slavko, Štrbac-Savić Svetlana, Nedeljković Jasmina. "Multi - Attribute Technological Modeling of Coal Deposits Based on the Fuzzy TOPSIS and C - mean Clustering Algorithms" in Energies 9 no. 12, Basel:MDPI AG, Basel, Switzerland (2016). https://doi.org/10.3390/en9121059
-
Hidrotermalne alteracije kao kontrolni faktor mineralizacije u ležištu bakra Borska reka
Jovana Mirčeta (2024)Rudno polje Bor kome pripada rudno telo Borska reka se nalazi u severnom delu Borsko- Srednjegorske zone Karpato-balkanske metalogenetske provincije. Ležište Borska Reka se nalazi u krajnjim severozapadnim delovima rudnog polja Bor. Smešteno je u intenzivno izmenjenim andezitima i njihovim piroklastitima. Relativno je jednostavne građe. Ležište Borska reka genetski pripada grupi hidrotermalnih ležišta, klasi porfirskih ležišta bakra i zlata. Sastavni je deo velikog hidrotermalnog rudonosnog sistema Bor, koji je po uslovima stvaranja i tipovima rudne mineralizacije sličan hidrotermalnom rudonosnom ...... sastav ı na samim uzorcima obeležen pravac sečenja u cilju izrade preparata. Svi uzorci su fotografisani u cilju dokumentovanja nakon čega Je izvršena izrada preparata. 2. _ U drugoj fazi izvršena Je izrada petroloških preparata. Izrada preparata obuhvata sledeće korake (Pačevski, 2018.): Sečenje ...
... interpretaciju dobijenih rezultata. Tom prilikom korišćena Je stručna literatura, naučni radovi, kao i internet podaci koji su bili značajni pri samoj izradi master rada. 25 4. REZULTATI Prikaz rezultata obuhvata sumiranje, poređenje ıi interpretaciju analiza makroskopskih uzoraka, petroloških uzoraka ...
... fiju, petrologiju i geohemiju, kao i katedri za Ekonomsku geologiju koja mi je dozvolila korišćenje instrumenata, koji si mi bili neophodni za izradu master rada. Zahvaljujem se kompaniji Srbija Zijin Copper koja mi je omogućila korišćenje podataka i dozvolila uzimanje uzoraka iz bušotine. ...Jovana Mirčeta. Hidrotermalne alteracije kao kontrolni faktor mineralizacije u ležištu bakra Borska reka, 2024
-
Accuracy assessment of geometrical elements for setting-out in horizontal plane of conveying chambers at the bauxite mine „Kosturi“ Srebrenica
Milutinović Aleksandar, Ganić Aleksandar, Tokalić Rade. "Accuracy assessment of geometrical elements for setting-out in horizontal plane of conveying chambers at the bauxite mine „Kosturi“ Srebrenica" in Archives of Mining Sciences 59 no. 1, Berlin, Germany: The Journal of Committee of Mining of Polish Academy of Sciences De Gruyter (2014): 93-106. https://doi.org/DOI 10.2478/amsc-2014-0007
-
Parameter determination of soil oscillation law using quotient of the relative growth increments of oscillation velocity and redused distances at “Kovilovača“ surface mine
Lutovac Suzana, Beljić Čedomir, Gligorić Zoran, Gluščević Branko. "Parameter determination of soil oscillation law using quotient of the relative growth increments of oscillation velocity and redused distances at “Kovilovača“ surface mine" in 5th International Symposium MINING AND ENVIRONMENTAL PROTECTION, Vrdnik, Serbia, Belgrade:University of Belgrade, Faculty of Mining and Geology (2015): 376-384
-
Analysis of Method for Determination of the Rock Mass Oscillation Equation Parameters in the Nepričava open pit
Lutovac Suzana, Gluščević Branko, Tokalić Rade, Majstorović Jelena, Beljić Čedomir. "Analysis of Method for Determination of the Rock Mass Oscillation Equation Parameters in the Nepričava open pit" in 6th International Symposium MINING AND ENVIRONMENTAL PROTECTION, Vrdnik, Serbia, 21-24.06.2017, Belgrade:Faculty of Mining and Geology, CENTER FOR ENVIRONMENTAL INGENEERING (2017): 317-323
-
Analysis of Blasting Impacts at the Open Pit Manastiriste near Topola on the Monastery Complex
Lutovac Suzana, Bajić Sanja, Gaćina Radmila, Urošević Katarina. "Analysis of Blasting Impacts at the Open Pit Manastiriste near Topola on the Monastery Complex" in Mining and Metallurgy Engineering Bor no. 2, Bor:Mining and Metallurgy Institute Bor (2016): 9-19. https://doi.org/10.5937/MMEB1602009B
-
Foliation impact on the dynamic properties of selected samples of the barrier dam site Prvonek: Right side
Majstorović Jelena, Tokalić Rade, Lutovac Suzana, Savković Snežana. "Foliation impact on the dynamic properties of selected samples of the barrier dam site Prvonek: Right side" in Underground Mining Engineering no. 29, Beograd:University of Belgrade – Faculty of Mining and Geology (2016): 1-9
-
Simplified model for determining rock mass oscillation velocity at limestone deposit
Suzana Lutovac, Branko Gluščević, Miloš Gligorić, Jelena Majstorović, Rade Tokalić. "Simplified model for determining rock mass oscillation velocity at limestone deposit" in Prospects for developing resource-saving technologies in mineral mining and processing, UNIVERSITAS Publishing - Petrosani, Romania (2022)