Претрага
471 items
-
Application of the Fuzzy theory in the evaluation of operating parameters of auxiliary mechanization on open-cast coal mine, case study: pipelayers
Achieved operating parameters are the main indicator of the work quality and selection of mining machines. The effectiveness of a coal mine is correlated with the availability of basic and auxiliary machines. The main task of auxiliary machines in lignite mines is to achieve optimal working conditions. From an economic point of view, auxiliary machines generate up to 20% of the lignite mines' total costs. These are the primary reasons for analyzing their current work and making decisions in ...Stevan Djenadić, Miloš Tanasijević, Filip Miletić, Predrag Jovančić. "Application of the Fuzzy theory in the evaluation of operating parameters of auxiliary mechanization on open-cast coal mine, case study: pipelayers" in 8th Balkan Mining Congress, Belgrade, September 28-30, Rudarski instutut (2022)
-
Comparative analysis of correlation coefficients in mineralogical and geophysical data from the mine tailing site “Rudnik” (Serbia)
Vesna Cvetkov, Filip Arnaut, Dragana Životić. "Comparative analysis of correlation coefficients in mineralogical and geophysical data from the mine tailing site “Rudnik” (Serbia)" in 5th Congress Geologists of the Republic of North Macedonia, Ohrid, 28-29. 10. 2024, Македонско геолошко друштво (2024)
-
Development of Integrated Fuzzy Model for Mine Management Optimization
Miodrag Čelebić, Sanja Bajić, Dragoljub Bajić, Dejan Stevanović, Duško Torbica, Vladimir Malbašić (2023)Technoeconomic, environmental and safety criteria generally affect the management of metallic and non-metallic mining operations. The first basic question that needs to be addressed when planning ore mining is which methods are adequate and what is the optimal mining technology? Due to the complex geologic framework of ore deposits, geological exploration has rendered synonymous the inherent uncertainties, vagueness, and inaccuracies. As a result, subjective evaluation by engineers and expert experience have become increasingly important. Given that the natural language ...Miodrag Čelebić, Sanja Bajić, Dragoljub Bajić, Dejan Stevanović, Duško Torbica, Vladimir Malbašić. "Development of Integrated Fuzzy Model for Mine Management Optimization" in Comptes rendus de l’Académie Bulgare des Sciences, Bulgarian Academy of Sciences (2023). https://doi.org/10.7546/CRABS.2023.09.12
-
Open Educational Resources in Serbia
... provides a review of open educational resources in Serbia. It covers different aspects of open educational resources: policy, resources, licenses, curriculum and teaching methodology, outcome, stakeholders and impact. All mentioned aspects give an overview of the current state of open educational resources ...
... different regulations and various types of information about open education resources. The aim of the portal of the Open Education Initiative is to contribute to the inclusion of Serbia’s educational space in European and global trends in open education. Several university teachers have already made ...
... of machine readability. Adopted institutional policies of open science and institutions that have adopted institutional policies are listed. Guidelines, dictionaries and various types of methodologies related to open science and open data are briefly published. Among repositories that are ...Ivan Obradović, Ranka Stanković, Marija Blagojević, Danijela Milošević. "Open Educational Resources in Serbia" in Current State of Open Educational Resources in the “Belt and Road” Countries, Springer Singapore (2020). https://doi.org/10.1007/978-981-15-3040-1_10
-
Флотабилност халкопирита из полиметаличне руде рудника „Рудник”
Ђурица Н. Никшић (2022)The doctoral dissertation Chalcopyrite flotability from polymetallic "Rudnik" mine ore consists of two parts. The first part is a general part in which the theoretical foundations of the flotation concentration process, the flotation properties of chalcopyrite, the influence of certain flotation reagents and the mechanism of action on the flotation properties of chalcopyrite are presented. This part also describes the process of flotation concentration of polymetallic ore from the "Rudnik" mine. The second part is ...Ђурица Н. Никшић. Флотабилност халкопирита из полиметаличне руде рудника „Рудник”, Београд : [Ђ. Никшић], 2022
-
Risk management of a workplace in the open mine
Kirin Snežana, Miljanović Igor, Sedmak Aleksandar. "Risk management of a workplace in the open mine" in Proceedings of 5th International Scientific and Expert Conference of the International TEAM Society - no. - (2013): 342-345
-
The Mine Non Sulfid Ore From Prlovi-2 Locality Characterization
Lazić Predrag, Tomanec Rudolf, Miković B.. "The Mine Non Sulfid Ore From Prlovi-2 Locality Characterization" in Proceedings of The XIV Balkan Mineral Processing Congress I, Tuzla: (2011): 262-268
-
Selecting the right type of support for conditions in mine Rebelj – Kosjerić
Crnogorac Luka, Mitić Saša (2017)Crnogorac Luka, Mitić Saša. "Selecting the right type of support for conditions in mine Rebelj – Kosjerić" in 8st Simposium with international participation MINING 2017, :Privredna komora Srbije (2017): 320-333
-
Condition of support systems in GVH-1A ventillation drift in „Jasenovac“ mine
Crnogorac Luka, Mladenović Marko, Halilović Dževdet. "Condition of support systems in GVH-1A ventillation drift in „Jasenovac“ mine" in 10th Regional Congress of Students of Geotechnical Sciences „GEOREX“, Tuzla:Rudarsko Geološko Građevinski Fakultet (2017): 64-70
-
Mineral composition of sulphide-oxide Pb - Zn ore from Rudnik mine
Tomanec Rudolf, Lazić Predrag (2012)Tomanec Rudolf, Lazić Predrag. "Mineral composition of sulphide-oxide Pb - Zn ore from Rudnik mine" in Underground Mining Engineering no. 21, Beograd:Faculty of Mining and Geology, University of Belgrade, Belgrade (2012): 151-159
-
Primena modela transporta idealne čestice na primeru razvoja Površinskog kopa Jakovačka Kumša
Hidrodinamičkim proračunima transporta „idealne“ čestice prikazan je uticaj eksploatacije peskova sa površinskog kopa „Jakovačka Kumša“ na beogradsko izvorište podzemnih voda. Potencijalnu opasnost od zagađenja podzemnih voda izvorišta za vodosnabdevanje čini skup različitih procesa koji se odvijaju na površinskom kopu. U radu je prikazano poređenje dva modela transporta idealne čestice. Prvi model se odnosi na analizu putanje i vremena putovanja idealne čestice od površinskog kopa do izvorišta za stanje pre otvaranja kopa, dok se drugi model odnosi na stanje kada ...upravljnje podzemnim vodama, zaštita podzemnih voda, hidrodinamički model, metoda praćenja „idealne“ čestice, modflow, modpathDušan Polomčić, Dragoljub Bajić, Vesna Ristić Vakanjac, Marina Čokorilo Ilić. "Primena modela transporta idealne čestice na primeru razvoja Površinskog kopa Jakovačka Kumša" in 9. Međunarodni simpozijum o upravljanju prirodnim resursima, Faculty of Management, Zajecar, Megatrend University, Belgrade (2019)
-
Phytoecological analysis of primary and secondary colonization on copper mine wastes (Bor, Serbia)
Ranđelović Dragana, Jovanović Slobodan (2013)Ranđelović Dragana, Jovanović Slobodan. "Phytoecological analysis of primary and secondary colonization on copper mine wastes (Bor, Serbia)" in Abstracts of 11th Symposium on Flora of Southeastern Serbia and Neighbouring Regions, Niš:University of Niš, Biological society Dr Sava Petrović (2013): 36
-
Hydrodynamic calculation of the screen section 1 at the opencast coal mine Drmno
Šubaranović Tomislav, Pavlović Vladimir, Polomčić Dušan. "Hydrodynamic calculation of the screen section 1 at the opencast coal mine Drmno" in V International Conference COAL, Zlatibor: (2011): 355-361
-
Underground gravity survey in a coal mine
Vasiljević Ivana, Vučković Dejan, Sretenović Branislav. "Underground gravity survey in a coal mine" in Underground Mining Engineering (Podzemni radovi) XXIII no. 24, Beograd:Univerzitet u Beogradu – Rudarsko-geološki fakultet (2014): 21-33
-
An Overview of Two Years of Continuous Energy Optimization at the Velenje Coal Mine
Medved Milan, Ristović Ivica, Roser Janez, Vulić Milivoj . "An Overview of Two Years of Continuous Energy Optimization at the Velenje Coal Mine" in Energies 5 no. 6, Basel, Switzerland:MDPI AG (2012): 2029-2029. https://doi.org/10.3390/en5062017
-
Technological Model of Coal Deposit - base for Mine Production Planning
Gligorić Zoran, Gligorić Miloš, Štrbac-Savić Svetlana. "Technological Model of Coal Deposit - base for Mine Production Planning" in 2nd Virtual International Conference on Science, Niš:Research and Development Center ALFATEC (2016)
-
Assumptions for Definition of Mine Assesments Procedure with Hybrid Model
Zlatanović Dragan, Milisavljević Vladimir, Tanasijević Miloš. "Assumptions for Definition of Mine Assesments Procedure with Hybrid Model" in Mining and Metallurgy Engineering Bor no. 4, Bor:Mining and Metallurgy Institute (2013): 49-58. https://doi.org/10.5937/MMEB1304049Z
-
Assumptions for Defining the Mine Assessment Procedure with Hybrid Model
Dragan Zlatanović, Milisavljević Vladimir, Tanasijević Miloš. "Assumptions for Defining the Mine Assessment Procedure with Hybrid Model" in Mining and Metalurgy Engineering Bor no. 4, Bor:Mining and Metallurgy Institute, Bor (2013): 49-68
-
Ecological potential of Epilobium dodonaei Vill. for restoration of metalliferous mine wastes
Ranđelović Dragana, Gajić Gordana, Mutić Jelena,Pavlović Pavle, Mihailović Nevena, Jovanović Slobodan (2016)Ranđelović Dragana, Gajić Gordana, Mutić Jelena,Pavlović Pavle, Mihailović Nevena, Jovanović Slobodan. "Ecological potential of Epilobium dodonaei Vill. for restoration of metalliferous mine wastes" in Environmental Engineering 95, Amsterdam, Netherlands :Elsevier (2016): 800-810. https://doi.org/http://dx.doi.org/10.1016/j.ec
-
Optimization of ring blasting in sublevel stoping gold mine
Duranović Miodrag, Đokić Nemanja, Lapčević Veljko, Torbica Slavko, Petrović Milenko, Savić Ljiljana (2018)Duranović Miodrag, Đokić Nemanja, Lapčević Veljko, Torbica Slavko, Petrović Milenko, Savić Ljiljana. "Optimization of ring blasting in sublevel stoping gold mine" in Podzemni radovi no. 33, :Unierzitet u Beogradu - Rudarsko-geološki fakultet (2018): 61-68