Претрага
1229 items
-
Prediction of surface subsidence for the purpose of mining project of underground exploitation of bauxite ore in the deposit Podbraćan
Milutinović Aleksandar, Ganić Aleksandar, Ganić Meri, Tokalić Rade. "Prediction of surface subsidence for the purpose of mining project of underground exploitation of bauxite ore in the deposit Podbraćan" in VI International Geomechanics Conference 1, Varna, Bulgaria:Scientific and Tehnical Union of Mining, Geology and Metallurgy; Federation of the Scientific Engineering Unions in Bulgaria (2014): 414-421
-
Underground loading-haulage equipment selection with application of topsis method with different weighting methods of criteria
The choice of adequate mining machines is one of the most complex problems in the underground exploitation of mineral raw materials. The weight of such a decision is reflected in the high prices of these machines and the occurrence of even greater costs during their use if their choice was wrongly conceived. There are numerous examples from practice in which such decisions were made solely on the basis of comparing the prices of machines, without considering any of the ...utovarno-transportna mehanizacija, izbor, TOPSIS, entropija, standardna devijacija, težina kriterijumaVladimir Krivošić, Luka Crnogorac, Rade Tokalić. "Underground loading-haulage equipment selection with application of topsis method with different weighting methods of criteria" in Underground mining engineering, University of Belgrade - Faculty of Mining and Geology (2024)
-
Analysis of the exhaust emissions inventory from auxiliary mining machines
Stevan Đenadić, Aleksandar Mirković, Jovana Mitrović, Filip Miletić, Predrag Jovančić, Dragan Ignjatović (2023)Open-pit coal mines are equipped with a large number of mining machines and vehicles with diesel engines. Due to common daily operation of these machines and vehicles large amounts of exhaust gases which contain numerous pollutants are emitted into the atmosphere. The demand to reduce air pollution induced the activities in developed countries to map and calculate all gases emitted by industries to formulate and select adequate preventive activities. In collaboration with machine manufacturers, emission standards for off-road machines ...Stevan Đenadić, Aleksandar Mirković, Jovana Mitrović, Filip Miletić, Predrag Jovančić, Dragan Ignjatović. "Analysis of the exhaust emissions inventory from auxiliary mining machines" in 9th International Conference Mining and Environmental Protection, University of Belgrade, Faculty of Mining and Geology (2023)
-
Stability analysis on slope PK dacite Ceramide
Safe surface mining exploitation of minerals is possibile only if stable bench and overall slopes in the open pit are construct. In order to to construct stable open pit slopes, it is necessary to carry out certain physical and mechanical laboratry testing of mineral raw materials in order to determine the geomechnical calculating parameters. These calculating parameters represent the base ground for performing slopes analyses and the open pit design. In this paper, an stability analysis of benches and ...Vladimir Čebašek, Veljko Rupar, Vladimir Ivoš, Vladimir Petković. "Stability analysis on slope PK dacite Ceramide" in VIII International geomechanics conference, Scientific And Technical Union of Mining, Geology and Metallurgy (2018)
-
Soil oscillation law parameter determination with the application of Lagrange’s theorem at “Kovilovača“ open pit
... (18) for n, the value obtained in the previous way is taken. No. 3, 2015 Mining & Metallurgy Engineering Bor 57 In so doing, data for pairs (Rm, vm), m = 1, 2, ..., N, are used from the table of experimental data, so that: n 111 RvK n 222 RvK ... n NNN RvK , whereby, for parameter ...
... are obtained: No. 3, 2015 Mining & Metallurgy Engineering Bor 58 - angle of internal friction φ = 31º 35' - cohesion C = 138.33 [kN/m2] - volume weight γ = 26.26 [kN/m3] - compressive strength σp = 808.08 [daN/cm2] - tensile strength σz = 75.90 [daN/cm2] - velocity of longitudinal elastic ...
... dnosti: Broj 3, 2015. Mining & Metallurgy Engineering Bor 68 - ugao unutrašnjeg trenja φ = 31º 35' - kohezija C = 138,33 [kN/m2] - zapreminska težina = 26,26 [kN/m3] - čvrstoća na pritisak σp = 808,08 [daN/cm2] - čvrstoća na zatezanje σz = 75,90 [daN/cm2] - brzina longitudinalnih ...Suzana Lutovac, Nebojša Vidanović, Čedomir Beljić, Zoran Gligorić. "Soil oscillation law parameter determination with the application of Lagrange’s theorem at “Kovilovača“ open pit" in Mining and Metallurgy Engineering Bor, Bor : Mining and Metallurgy Institute Bor (2015). https://doi.org/10.5937/MMEB1503053L
-
Towards Better Valorisation of Industrial Minerals andRocks in Serbia—Case Study of Industrial Clays
... Ministry of Environmental Protection decides whether it is necessary to perform it or not. All data on exploration and exploitation licences are available online [57,58]. 4.1.2. Spatial Planning Related to Mining Industry Spatial planning is an effective regulatory tool which can bridge the usual difficulties ...
... Permitting in Serbia 4.1.1. Mining Sector The general procedure for exploration and exploitation of the new mine/quarry is divided in four steps: geological exploration, approval of exploitation, approval of execu- tion of mining operations, and approval for the use of mining facilities (Figure 2). ...
... 2007; p. 37. (In Russian) 56. Law on Mining and Geological Explorations. In Official Gazette of the Republic of Serbia; Republic of Serbia: Belgrade, Serbia, 2011. (In Serbian) 57. Ministry of Mining and Energy of the Republic of Serbia, Geology and Mining. Available online: http://gis.mre.gov.rs/vi- ...Vladimir Simić, Dragana Životić, Zoran Miladinović. "Towards Better Valorisation of Industrial Minerals andRocks in Serbia—Case Study of Industrial Clays" in Resources, MDPI AG (2021). https://doi.org/10.3390/resources10060063
-
Model upravljanja investicionim projektima otvaranja površinskih kopova uglja
Cvjetko P. Stojanović (2015-04-27)Brze promene u okruženju pred rukovodioce postavljaju mnogobrojne zahteve,pre svega, one koji se tiču ostvarenja ciljeva u zadatom vremenu i raspoloživimsredstvima što zahteva fleksibilan pristup u organizovanju aktivnosti i efikasnost unjihovom sprovođenju.Upravljanje projektima, bilo koje vrste, suštinski, predstavlja veoma složenproces odlučivanja uslovljen velikim brojem ulaznih faktora. Ti faktori treba daomoguće fokusiranje na prioritete i ciljeve, praćenje realizacije, fleksibilnost uprevazilaženju teškoća, prilagođavanje promenama, te kontrolu nad ostvarenimrezultatima. Ovakav način upravljanja zahteva korišćenje proverenih tehnika i alata tetimski rad angažovanih na ...Cvjetko P. Stojanović. "Model upravljanja investicionim projektima otvaranja površinskih kopova uglja" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-04-27)
-
The Effect of Gravel and Sand Mining on Groundwater and Surface Water Regimes — A Case Study of the Velika Morava River, Serbia
Milan Kresojević, Vesna Ristić Vakanjac, Dragan Trifković, Jugoslav Nikolić, Boris Vakanjac, Dušan Polomčić, Dragoljub Bajić (2023)Овај рад описује како неконтролисано и нелегално откопавање песка и шљунка може утицати на режим површинских и подземних вода на местима где постоји активна хидрауличка веза између њих, са студијом случаја реке Велике Мораве у Србији. Такође, промена геометрије попречног профила, као последица антропогених и природних фактора, отежава уливање ове реке за укључивање у водне токове Србије. Плодност Велике Мораве омогућила би развој речног саобраћаја како за трговачке бродове, тако и за пловила Речне флотиле Војске Србије. Корелације између ...Milan Kresojević, Vesna Ristić Vakanjac, Dragan Trifković, Jugoslav Nikolić, Boris Vakanjac, Dušan Polomčić, Dragoljub Bajić. "The Effect of Gravel and Sand Mining on Groundwater and Surface Water Regimes — A Case Study of the Velika Morava River, Serbia" in Water, MDPI AG (2023). https://doi.org/10.3390/w15142654
-
Split-Desktop software for the analysis of fragment size distribution of blasted rock mass
Milanka Negovanović, Lazar Kričak, Stefan Milanović, Jovan Marković, Nikola Simić, Snežana Ignjatović (2023)Drobljenje stena je najvažniji pokazatelj u proceni efekata miniranja pri proizvodnom miniranju u površinskoj eksploataciji. Stepen drobljenja stena ima veliki uticaj na efikasnost daljih operacija utovara, transporta, drobljenja i mlevenja. Optimalno drobljenje stena pri proizvodnom miniranju utiče na smanjenje ukupnih troškova proizvodnje. Stoga je pouzdana procena veličine drobljenja odminirane stenske mase veoma važno pitanje, ne samo u operacijama miniranja, već i u rudarskoj proizvodnji. Za predviđanje distribucije veličine komada odminirane stenske mase postoje različiti empirijski modeli. KUZ-RAM model omogućava ...Milanka Negovanović, Lazar Kričak, Stefan Milanović, Jovan Marković, Nikola Simić, Snežana Ignjatović. "Split-Desktop software for the analysis of fragment size distribution of blasted rock mass" in 9th International Conference Mining and environmental protection, Sokobanja, Serbia, 24 – 27. May 2023, Belgrade : University of Belgrade, Faculty of Mining and Geology (2023)
-
Energy Mining And Sustainable Development
Ristović Ivica (2010)Ristović Ivica. "Energy Mining And Sustainable Development" in Proceedings of 3rd International Symposium ENERGY MINING ER 2010, Belgrade Serbia:FMG, Belgrade (2010): 1-6
-
Application of thermal imaging methods in mining
Damnjanović Vesna (2017)Damnjanović Vesna. "Application of thermal imaging methods in mining" in MINING 2017, 8st Simposium with international participation, Palć, Srbija:Privredna komora Srbije (2017): 66-71
-
Replica of the “Great Triangle Gold Nugget” Belonging to Belgrade University Collection, Gilded or Not?
... MILOŠEVIĆ, M.1 & JELIĆ, I.2 1 Faculty of Mining and Geology, University of Belgrade, Belgrade, Serbia 2 Natural History Museum, Belgrade, Serbia E-mail: alena.zdravkovic@rgf.bg.ac.rs Introduction The Collection of Rocks and Minerals, Faculty of Mining and Geology, the University of Belgrade ...
... University) in 1899 (UROŠEVIĆ, 1899). The original accompanying catalogue, written in French and signed by the honoured mining engineer M. Melnikoff, conservator of the Mining Institute Museum in St. Petersburg, contains details of its location of finding, the weight of the natural nugget (Archive ...
... information of the number of the replica made, and the type and manner of material that was used for covering. Result and conclusion The data obtained by EDS analysis show that the gypsum model is covered with gold leaf, which was expected according to the macroscopic characteristic of ...Alena Zdravković, Maja Milošević, Ivana Jelić. "Replica of the “Great Triangle Gold Nugget” Belonging to Belgrade University Collection, Gilded or Not?" in 8th Mineral Sciences in the Carpathians Conference, Acta Mineralogica-Petrographica, Miskolc, Hungary, Department of Mineralogy, Geochemistry and Petrology, University of Szeged, Szeged, Hungary (2021)
-
Arrival of Mining Technologies in Serbian Mines Through History
Grujić Miloš, Ristović Ivica (2010)Grujić Miloš, Ristović Ivica. "Arrival of Mining Technologies in Serbian Mines Through History" in Mining in Central Europe Through History, Belgrade, Košice:FMG Belgrade - TU Košice BERG Faculty (2010): 1-10
-
Defining of model for determining the service life of hoisting ropes in mining
Trifunović Prvoslav, Miličić Nada (2013)Trifunović Prvoslav, Miličić Nada. "Defining of model for determining the service life of hoisting ropes in mining" in Mining and Metallurgy Engineering no. 3, Bor:Institut za rudarstvo i metalurgiju Bor (2013): 131-134
-
A WebGIS Decision Support System for Management of Abandoned Mines
Ranka Stanković, Nikola Vulović, Nikola Lilić, Ivan Obradović, Radule Tošović, Milica Pešić-Georgiadis (2016)... categorization of mining waste landfills within the mining waste field, as well as other data related to the management of mining waste. In the cadastre of abandoned mines and mining facilities data on the position and status of these mines and mine facilities are entered, as well as data on implemented ...
... GIS spatial data needed for different aspects of the study of the terrain of abandoned mines and/or their remediation. These data include: basic data, hydrogeology, biology, geology and mining as well as specific information related to the terrain of abandoned mines [23]. Spatial data in the afor ...
... and reclamation”. In the mining waste fields cadastre the following data are entered: the limits of the mining waste field, the carrier of exploration and/or exploitation or economic entity that produces mining waste, the economic entity which is the operator of mining waste, the characterization ...Ranka Stanković, Nikola Vulović, Nikola Lilić, Ivan Obradović, Radule Tošović, Milica Pešić-Georgiadis. "A WebGIS Decision Support System for Management of Abandoned Mines" in Energies 7 no. 9 (2016): 567. https://doi.org/10.3390/en9070567
-
Possibility of application of phytoremediation in mining
Lekić Milena, Crnogorac Luka, Pantelić Uroš, Zoran Nikić. "Possibility of application of phytoremediation in mining" in 6TH International Symposium „MINING AND ENVIORMENTAL PROTECTION“, Beograd:Rudarsko-geološki fakultet (2017): 355-360
-
A review of Veliki Majdan tailings dam rehabilitation,
Kostović Milena, Vitorović Zdravko (2011)Kostović Milena, Vitorović Zdravko. "A review of Veliki Majdan tailings dam rehabilitation," in Proceedings of the XIV Balkan Mineral Processing Congress II, Tuzla, Bosnia and Herzegovina:Faculty of Mining, geology and civil engineering in Tuzla and Faculty of Mining in Prijedor, University of Tuzla (2011): 799-801
-
Application of polymer composites for stabilization of degraded rock mass in mining
Trifunović Prvoslav, Tokalić Rade, Ganić Aleksandar. "Application of polymer composites for stabilization of degraded rock mass in mining" in Časopis Underground Mining Engineering/Podzemni radovi no. 22, Beograd:Rudarsko-geološki fakultet, Beograd (2013): 23-31
-
Forecasting financial distress of mining companies: Tool for examination of key performance indicators
Zlatanović Dragan, Bugarin Mile, Milisavljević Vladimir. "Forecasting financial distress of mining companies: Tool for examination of key performance indicators" in Mining and Metalurgy Engineering Bor no. 1, Bor:Mining and Metallurgy Institute, Bor (2016): 73-80. https://doi.org/10.5937/MMEB1601073Z
-
Updating the database of the spatial information system for capital underground mining rooms
Milutinović Aleksandar, Ganić Aleksandar, Miljanović Igor, Gajić Grozdana. "Updating the database of the spatial information system for capital underground mining rooms" in 4th Balkan Mining Congress BALKANMINE 1, Ljubljana, Slovenija:Faculty of Natural Sciences and Engineering (2011): 629-633