Претрага
239 items
-
Asset management and condition monitoring on maintenance of mining equipment lignite mines
Predrag Jovančić (2016)Maintenance strategy, once set, is not permanent. This strategy should be adapted and altered according to the findings, achieved results, variation of mine product prices, changes in the region etc. On the other hand, maintenance strategy should be: safe operation, higher productivity, reduced costs and functionality of complete system. Asset management represents activities through which mine achieves the optimal and sustainable management of its property, in order to meet the plan - realization of production with optimized costs. Therefore, ...Predrag Jovančić. "Asset management and condition monitoring on maintenance of mining equipment lignite mines" in 13th International symposium Continuous Surface Mining ISCSM 2016, 12-14 September 2016, Belgrade – Serbia, Belgrade : Yugoslav Opencast Mining Committee (2016) М31
-
Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine
Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić (2021)The production of lignite in large open-pit mines is mainly performed with continuously operating equipment, where bucket-wheel excavators, bucket-chain excavators, belt conveyors, and spreaders are the basic machines. Smaller machines, usually of discontinuous operating nature, are commonly categorized as auxiliary machines. This paper presents the research related to the analysis of auxiliary machine parameters with the case study for a hydraulic excavator. The purpose of the analysis was to develop a model of rating quality of service of the ...Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić. "Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine" in SSRN Electronic Journal, Elsevier BV (2021). https://doi.org/10.2139/ssrn.3945617 М33
-
Optimizacija dužine strele rotornih bagera u funkciji stabilnosti kosina i efektivnosti rada na površinskim kopovima lignita Srbije
Branko M. Petrović (2016-07-12)Rotorni bageri su mašine koje se u današnje vreme najviše primenjuju uprocesu masovne eksploatacije uglja zahvaljujući, pre svega, nizu tehničkoeksploatacionihprednosti u odnosu na druge vrste bagera. Raznovrsnirudarsko-tehnički zahtevi otkopavanja doprineli su razvoju nekoliko tipova ovihmašina, tako da svaki od njih ima svoje prednosti i nedostatke u odnosu nadrugi tip.Predmet istraživanja u disertaciji odnosi se na izbor optimalnekonstrukcije strele bagera i njene usaglašenosti sa uslovima radne sredine kojiće vladati na površinskim kopovima lignita Srbije, imajući u vidu složene usloveeksploatacije (velika ...površinski kop, parametri bloka, kapacitet, rotorni bager, strelabagera, geomehanika, stabilnost kosina, ekonomijaBranko M. Petrović. "Optimizacija dužine strele rotornih bagera u funkciji stabilnosti kosina i efektivnosti rada na površinskim kopovima lignita Srbije" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2016-07-12)
-
Развој модела употребног квалитета помоћне механизације на површинским коповима лигнита
Драгица Јагодић Крунић (2021)Тренутно стање помоћне механизације на површинским коповима лигнита је незадовољавајуће узроковано пре свега старошћу и неблаговременом заменом машима услед чега је расположивост недовољна а трошкови експлоатације и одржавања високи. Тренутно стање и захтеви који се постављају пред ове машине указују на неопходност оптимизације процеса управљања помоћном механизацијом. Одређивање оптималног времена замене и преосталих могућности је најодговорнији управљачки задатак који треба да буде заснован на свеобухватном сагледавању економских, техничких и других узрочно последичних веза. Са економског аспекта гледано треба одржавати ...помоћна механизација, употребни квалитет, ефективност, расположивост, сигурност функционисања, ризик, трошкови животног циклуса, фази логика, Монте Карло методаДрагица Јагодић Крунић. Развој модела употребног квалитета помоћне механизације на површинским коповима лигнита, Београд : [Д. Јагодић Крунић], 2021 M70
-
BEYOND 2020 - Geology explorations and open pit activities affectation in reclamation designing in Kolubara Coal Mines (KCM) Serbia, new considerations
Geology explorations in KCM runs from 1936. year up to these days and still ongoing. Results in >7,200 drill holes with ≈600,000 m of core drilling and gave lignite ore resources of > 4,1Bt, which 1,15Bt are excavated since 1986. of XIX up to early years of XXI century. For further mining operations in open pits stay 1,5Bt of lignite. Under waste heaps are ≈80 km2, additional 85 km2 should be filled. All of that masses/areas were, are ...Bojan Dimitrijević, Bogoljub Vučković, Radmila Gaćina. "BEYOND 2020 - Geology explorations and open pit activities affectation in reclamation designing in Kolubara Coal Mines (KCM) Serbia, new considerations" in 17th International Conference of the open and underwater mining of minerals, Sts. Constantine and Helena Resort, Varna, 18-22 September, Bulgaria, Sofia, Bulgaria : Scientific and Technical Union of Mining, Geology and Metallurgy, (2023) М31
-
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović (2019)Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the ...Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović. "Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine" in Energies, MDPI AG (2019). https://doi.org/10.3390/en12214044 М22
-
Mine ventilation system planning using genetic algorithms
The most common problem in contemporary mining practice related to the planning and analysis of ventilation systems is the optimization of partially regulated air distribution in mine ventilation networks. This paper presents a two step optimization procedure for partly regulated air distribution in mine ventilation networks. The first step is the determination of air distribution in all branches using the well known Hardy-Cross method. In the second step the distribution and parameters of air flow regulators with minimum engaged ...coal, lignite, and peat; ventilation systems; coal mining; underground mining; ventilation; mathematical models; design; air flow; optimization; calculation methodsNikola Lilić, Ranka Stanković, Ivan Obradović. "Mine ventilation system planning using genetic algorithms" in 6. international symposium on mine planning and equipment selection, Ostrava (Czech Republic), 3-6 Sep 1997, A.A. Balkema, Rotterdam (Netherlands) (1997) М33
-
Strateško odlučivanje pri izboru novih rotornih bagera za površinske kopove lignita: primer rudarskog basena Kolubara
U ovom radu je dat primer izbora najpovoljnijih postojećih rotornih bagera u uslovima površinskih kopova RB Kolubara, zbog budućeg odlučivanja o optimalnom izboru bagera za rad na otkrivci, uglju i međuslojnoj jalovini. Korišćeni su parametri performansi specifičnog iskorišćenja mase i snage bagera, vremensko i kapacitetno iskorišćenje bagera, ali i specifični operativni troškovi rada rotornog bagera. Znajući da je ovo neka vrsta višekriterijumskog problema, iskorišćena je metoda TOPSIS za optimalno i tačno rangiranje rotornih bagera. Za analizu je korišćen period ...Predrag Jovančić, Stevan Đenadić, Goran Todorović, Dragan Novaković, Filip Miletić. "Strateško odlučivanje pri izboru novih rotornih bagera za površinske kopove lignita: primer rudarskog basena Kolubara" in XI simpozijum sa međunarodnim učešćem "Rudarstvo 2020", Vrnjačka Banja, Srbija, 8-11. septembar, Institut za tehnologiju nuklearnih i drugih mineralnih sirovina (Beograd), Privredna komora Srbije (Beograd) (2020) М31
-
Application of the Fuzzy theory in the evaluation of operating parameters of auxiliary mechanization on open-cast coal mine, case study: pipelayers
Achieved operating parameters are the main indicator of the work quality and selection of mining machines. The effectiveness of a coal mine is correlated with the availability of basic and auxiliary machines. The main task of auxiliary machines in lignite mines is to achieve optimal working conditions. From an economic point of view, auxiliary machines generate up to 20% of the lignite mines' total costs. These are the primary reasons for analyzing their current work and making decisions in ...Stevan Djenadić, Miloš Tanasijević, Filip Miletić, Predrag Jovančić. "Application of the Fuzzy theory in the evaluation of operating parameters of auxiliary mechanization on open-cast coal mine, case study: pipelayers" in 8th Balkan Mining Congress, Belgrade, September 28-30, Rudarski instutut (2022) М33
-
Autonomnost lokalnih sistema automatske regulacije provetravanja rudnika sa podzemnom eksploatacijom
Dragomir Kocić (1975)Dragomir Kocić. Autonomnost lokalnih sistema automatske regulacije provetravanja rudnika sa podzemnom eksploatacijom, Beograd:Rudarsko Geološki Fakultet, 1975
-
Metoda doboru optymalnego zestawu wielonaczyniowychkoparek do eksploatacji zluž
Radomir Simić (1974)Radomir Simić. Metoda doboru optymalnego zestawu wielonaczyniowychkoparek do eksploatacji zluž, Wroclaw:Institut Gornictwa, 1974
-
Geometrizacija ležišta i grafička dokumentacija pri projektovanju i eksploataciji rudnika
Zorka Obradović-Pejatović (1973)Zorka Obradović-Pejatović. Geometrizacija ležišta i grafička dokumentacija pri projektovanju i eksploataciji rudnika, Beograd:Rudarsko-geološki fakultet, 1973
-
Hidrogeologija terena rudnika soli Tušanj" s posebnim osvrtom na poslijedice eksploatacije"
Mira Šurlan-Stojković (1980)Mira Šurlan-Stojković. Hidrogeologija terena rudnika soli Tušanj" s posebnim osvrtom na poslijedice eksploatacije", Beograd:Rudarsko-geološki fakultet, 1980
-
Termičke metode povećanja iskorišćenja naftnih ležišta
Vesna Karović Maričić (2019)Vesna Karović Maričić. Termičke metode povećanja iskorišćenja naftnih ležišta, Beograd : Univerzitet u Beogradu, Rudarsko-geološki fakultet, 2019 Без категорије
-
Predlog metodologije za merenje performansi procesa
Kukrika Milan, Dimitrijević Bojan (2012)Kukrika Milan, Dimitrijević Bojan. "Predlog metodologije za merenje performansi procesa" in Zbornik radova 10. Međunarodna naučna konferencija o površinskoj eksploataciji Opencast Mining Conference - ОMC 2012 no. X, Zlatibor, Srbija:Jugoslovenski Komitet za površinsku eksploataciju Saveza inženjera rudarstva i geologije Srbije (2012): 167-175 M33
-
P-T analiza RMU Bitola – krupne klase
Nemanja Dobrosavljević (2024)Cilj ovog diplomskog rada je bio ispitivanje mogućnosti i tehnologije čišćenjauglja, kao i predstaviti rezultate pliva – tone analize koja ima za cilj ocenu mogućnosti čišćenja uglja - krupnih klasa posmatranog uzorka. Da bi se ispitivanje i analiza mogućnosti čišćenja rovnog uglja u REK Bitola uspešno priveli kraju, moralo se uraditi uzorkovanje reprezentativnog uzorka iz koga se potom izdvaja prvi deo koji služi za određivanje sadržaja vlage. Pored tog dela iz uzorka se izdvaja i drugi njegov deo koji će ...ugalj, lignit, Bitola, PT analiza, pliva-tone analiza, čišćenje uglja, suvi ugalj, vlažan ugalj, pepeo, donja toplotna moć, čist ugalj, jalovina, bilansNemanja Dobrosavljević. P-T analiza RMU Bitola – krupne klase, 2024
-
Rešenje sistema za navodnjavanje spoljašnjeg odlagališta površinskog kopa Drmno
Milanović Radomir, Vuković Zoran, Dimitrijević Bojan, Pavlović Milan. "Rešenje sistema za navodnjavanje spoljašnjeg odlagališta površinskog kopa Drmno" in Zbornik radova 5. Međunarodna konferencija UGALj 2011 no. V, Zlatibor, Srbija:Jugoslovenski Komitet za površinsku eksploataciju Saveza inženjera rudarstva i geologije Srbije (2011): 191-198 M63
-
Definisanje uticaja dimaničkih tehničko-ekonomskih parametara na optimizaciju podzemne eksploatacije severnog revira rudnika bakra Majdanpek
Sreten Spasić (1977)Sreten Spasić. Definisanje uticaja dimaničkih tehničko-ekonomskih parametara na optimizaciju podzemne eksploatacije severnog revira rudnika bakra Majdanpek, Beograd:Rudarsko Geološki Fakultet, 1977
-
Doprinos masovnijem osvajanju proizvodnje iz stokverknih ležišta magnezita sa utvrđivanjem osnovnih parametara na ekonomičnost eksploatacije i njenu zavisnost od načina koncentracije
Stevan Miloradović. Doprinos masovnijem osvajanju proizvodnje iz stokverknih ležišta magnezita sa utvrđivanjem osnovnih parametara na ekonomičnost eksploatacije i njenu zavisnost od načina koncentracije, :, 0
-
Upravljanje procesom razrade i eksploatacije ležišta ugljovodoničnih fluida
Vesna Karović Maričić (2006)Vesna Karović Maričić. Upravljanje procesom razrade i eksploatacije ležišta ugljovodoničnih fluida, Beograd:Rudarsko Geološki Fakultet, 2006