Quantifying the impact of Tamnava - West field drainage system of the surface pit on groundwater regime of Kalenić regional landfill
Dušan Polomčić, Dragoljub Bajić, Vesna Ristić Vakanjac, Tomislav Šubaranović. "Quantifying the impact of Tamnava - West field drainage system of the surface pit on groundwater regime of Kalenić regional landfill " in Proceedings of the VIII Balkan Mining Congress, Belgrade, Serbia, 28. - 30. September 2022, Belgrade : Mining Institute Belgrade (2022)
-
A transient three-dimensional numerical model of water impermeable screen effects on the groundwater inflow reduction into the mine (Case Study: Open pit mine Drmno, Serbia)
Šubaranović Tomislav, Polomčić Dušan, Pavlović Vladimir, Pakić N. "A transient three-dimensional numerical model of water impermeable screen effects on the groundwater inflow reduction into the mine (Case Study: Open pit mine Drmno, Serbia)" in Proceedings on CD-ROM [Elektronski izvor]. Vol. 1-2 / 11th International Conference Research and Development in Mechanical Industry - RaDMI 2011, 15-18. September 2011, Sokobanja, Serbia, Vrnjačka Banja:Scientific and Technical Center for Intellectual Property (2011): 1257-1265
-
Effect of blasting on the adjacent building and mining structures at the open pit Kijevo
Lutovac Suzana, Tokalić Rade, Gluščević Branko, Vidanović Nebojša, Beljić Čedomir,. "Effect of blasting on the adjacent building and mining structures at the open pit Kijevo" in XXIV International Conference „ECOLOGICAL TRUTH“ ECO-IST16, Vrnjačka Banja, Serbia, :University of Belgrade – Technical Faculty in Bor (2016): 148-156
-
New data concerning the Miocene on the southern slopes of Fruška Gora (northern Serbia): A case study from the Mutalj open pit
Rundić Ljupko, Knežević Slobodan, Vasić Nebojša, Cvetkov Vesna, Rakijaš Milovan. "New data concerning the Miocene on the southern slopes of Fruška Gora (northern Serbia): A case study from the Mutalj open pit" in Geološki anali Balkanskog poluostrva no. 72, Beograd:Rudarsko-geološki fakultet (2011): 71-85. https://doi.org/10.2298/GABP1172071R
-
The correlation of the cutting resistance (kl) and selected geomechanical parameters of work environment in the example of an open pit mine ‘’Gracanica’’ Gacko
Majstorović Jelena, Dimitrijević Bojan, Savić Dragana, Nikolić D.. "The correlation of the cutting resistance (kl) and selected geomechanical parameters of work environment in the example of an open pit mine ‘’Gracanica’’ Gacko" in Proceedings of the XII-th National conference with international participation of the open and underwater mining of minerals no. XII, Varna, Bulgaria:Scientific and Technical Union of Mining, Geology and Metallurgy (2013): 255-262
-
Development of a fuzzy model for predicting the penetration rate of tricone rotary blasthole drilling in open pit mines
Kričak Lazar, Negovanović Milanka, Mitrović Stojan, Miljanović Igor, Nurić Samir, Nurić Adila (2015)Kričak Lazar, Negovanović Milanka, Mitrović Stojan, Miljanović Igor, Nurić Samir, Nurić Adila. "Development of a fuzzy model for predicting the penetration rate of tricone rotary blasthole drilling in open pit mines" in The Journal of the Southern African Institute of Mining and Metallurgy 115 no. 11, Johannesburg, The South African Republic:The Southern African Institute of Mining and Metallurgy (2015): 1065-1071. https://doi.org/10.17159/2411-9717/2015/v115n1
-
Komparativna analiza završnih kontura površinskog kopa Drmno
Definisanje optimalne završne konture površinskog kopa od suštinskog je značaja za ostvarivanje strateških ciljeva u razvoju rudarskih projekata. Savremeni programski paketi i metode za optimizaciju granica kopa, zasnivaju se na pronalasku završne konture koja obezbeđuje maksimalan profit. U slučaju površinskih kopova uglja, kod kojih osim profita postoji i čitav niz dodatnih kriterijuma i strateških ciljeva, princip optimizacije granica prema profitu, najčešće nije u potpunosti primenjiv. Iz rog razloga za uspešno definisanje granica površinskih kopova, neophodno je sagledati čitavu lepezu ...Dejan Stevanović, Dragan Ignjatović, Tomislav Šubaranović, Mirjana Banković, Petar Marković. "Komparativna analiza završnih kontura površinskog kopa Drmno" in XV Međunarodna konferencija OMC 2022, Zlatibor, 12-15. oktobar 2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Избор рекултивационог решења површинског копа Кленовник вишеатрибутном анализом: моделски приступ код избора; А selection of the land reclamation resolution of the open pit mine Klenovnik by a multi-attribute analysis: modeling approach in selection,
Вујић Слободан, Димитријевић Бојан, Николић Јовица, Милошевић Драган, Макар Ненад, Марјанац Симеон (2013)Вујић Слободан, Димитријевић Бојан, Николић Јовица, Милошевић Драган, Макар Ненад, Марјанац Симеон. "Избор рекултивационог решења површинског копа Кленовник вишеатрибутном анализом: моделски приступ код избора; А selection of the land reclamation resolution of the open pit mine Klenovnik by a multi-attribute analysis: modeling approach in selection," in Зборник радова XL Симпозијум о операционим истраживањима СYМОПИС 2013 no. XL, Златибор, Србија :Универзитет у Београду, Факултет организационих наука, Београд. (2013): 745-747
-
Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine
Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić (2021)The production of lignite in large open-pit mines is mainly performed with continuously operating equipment, where bucket-wheel excavators, bucket-chain excavators, belt conveyors, and spreaders are the basic machines. Smaller machines, usually of discontinuous operating nature, are commonly categorized as auxiliary machines. This paper presents the research related to the analysis of auxiliary machine parameters with the case study for a hydraulic excavator. The purpose of the analysis was to develop a model of rating quality of service of the ...Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić. "Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine" in SSRN Electronic Journal, Elsevier BV (2021). https://doi.org/10.2139/ssrn.3945617
-
Parameter determination of soil oscillation law using quotient of the relative growth increments of oscillation velocity and reduced distances at “Nepričava“ open pit mine
... the functional correlation is accepted as a good one. 4. REVIEW OF MASSIVE BLASTING AT "NEPRIČAVA" OPEN PIT MINE NEAR LAJKOVAC 4.1. General characteristics of "Nepričava" Open Pit Mine The limestone deposit "Nepričava" is situated at a distance of about 7.0 km west of town of Lajkovac ...
... determination of soil oscillation law using quotient of the relative growth increments of oscillation velocity and reduced distances at “Nepričava“ open pit mine;Određivanje parametara zakona oscilovanja tla preko količnika relativnih priraštaja brzina oscilovanja i redukovanih rastojanja na P.K. 'Nepričava' ...
... determination of soil oscillation law using quotient of the relative growth increments of oscillation velocity and reduced distances at “Nepričava“ open pit mine;Određivanje parametara zakona oscilovanja tla preko količnika relativnih priraštaja brzina oscilovanja i redukovanih rastojanja na P.K. 'Nepričava' ...Suzana Lutovac, Sanja Bajić, Marina Ravilić, Radmila Gaćina. "Parameter determination of soil oscillation law using quotient of the relative growth increments of oscillation velocity and reduced distances at “Nepričava“ open pit mine" in Underground Mining Engineering, Belgrade : University of Belgrade, Faculty of Mining and Geology (2015). https://doi.org/10.5937/podrad1526009L
-
Conversion of land areas after coal mine closure and reclamation
Otkopavanje uglja površinski i podzemno praćeno je degradacijom zemljišta, promenom formiranja predela i izmenom flore i faune. Od velikog značaja je razvoj novih naučno utemeljenih pristupa obnovljanje antropogeno poremećenih predela zasnovanih na formiranju rekultivacionih i rudarskih tehnologija. Apsolutno je neophodno obezbediti sveobuhvatno kvalitetno očuvanje zemljišnih i vodnih resursa i odrediti rekultivisano zemljište za novu namenu. U ovom članku je dat pregled najpopularnijih metoda rekultivacije zemljišta i mogućnosti rekultivacije zemljišta nakon završetka rekultivacije i zatvaranja rudnika uglja.... RECULTIVA TION This paper is part of research applied to the coal open pit Drmno, which has as general objectives as impact of mining in the area, as well as ecological conversion solutions for coal open pit Drmno (one of the open pits of Kostolac Basin Mining Basin), favoring significant opportunities ...
... procedures. It is important to point out that the defined model can be used in all planning and exploitation phases of an open pit mine, regardless of whether it is a new mine or an open mine where exploitation is carried out. The iterative nature of the model enables corrective measures during the imp ...
... 2 km and height 50 m. The landfill slopes have been reclaimed. The thickness of bulk overburden material is 40-50 m. The area belongs to “Drmno” open pit is in the eastern part of the Kostolac coal basin, 1.e., east of the Mlava River. (Figure 1) igure 1. Location of study area - Drmno The Kostolac ...Radmila Gaćina, Bojan Dimitrijević, Sanja Bajić. "Conversion of land areas after coal mine closure and reclamation" in 9th International conference mining and environmental protection MEP 23 Proceedings, Sokobanja, 24-27.05.2023., Belgrade : University of Belgrade - Faculty of mining and geology (2023)
-
Fragmentation Size Prediction of Blasted Material Using a Specialized Software for Drilling and Blasting
Stefan Milanović, Nikola Simić, Lazar Kričak, Milanka Negovanović, Nikola Đokić, Miljan Gomilanović (2024)Design and optimizing the drilling and blasting parameters, should fill the requirements for the capacity, fragmentation size, and technical characteristics of loading and transport equipment, and enable a safe work at the open pit. Besides mentioned, it also achieves the minimal impact on the environment of the open pit and decreases the negative effects on the environment, especially in the blast vibration and flyrock. To obtain the best possible blasting effects and consider all the factors, a specialized software is ...Stefan Milanović, Nikola Simić, Lazar Kričak, Milanka Negovanović, Nikola Đokić, Miljan Gomilanović. "Fragmentation Size Prediction of Blasted Material Using a Specialized Software for Drilling and Blasting" in The 55th International October Conference on Mining and Metallurgy, Mining and Metallurgy Institute Bor (2024). https://doi.org/10.5937/IOC24077M
-
Optimizacija faznog razvoja Površinskog kopa Ciganuša – Škorac u cilju definisanja dugoročne dinamike eksploatcije
Definisanje dugoročne dinamike razvoja rudarskih radova koja je u potpunosti usaglašena sa strateškim ciljevima Investitora, veoma je zahtevan zadatak, koji vrlo često podrazumeva veliki broj ograničenja. Adekvatno definisana dinamika razvoja rudarskih radova treba da obezbedi dugoročne zahteve u pogledu kapaciteta, kvaliteta i raspodele resursa neophodnih za ispunjavanje strateških ciljeva, koji se po pravilu svode na ostvarenje maksimalnog profita. Uspešno definisanje dinamike eksploatacije (posebno kod metaličnih ležišta) u najvećoj meri zavisi od optimizacije faznog razvoja površinskog kopa, odnosno od pravilnog ...Dejan Stevanović, Petar Marković, Mirjana Banković, Milan Živković. "Optimizacija faznog razvoja Površinskog kopa Ciganuša – Škorac u cilju definisanja dugoročne dinamike eksploatcije" in XV Međunarodna konferencija OMC 2022, Zlatibor, 12-15. oktobar 2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
BEYOND 2020 - Geology explorations and open pit activities affectation in reclamation designing in Kolubara Coal Mines (KCM) Serbia, new considerations
Geology explorations in KCM runs from 1936. year up to these days and still ongoing. Results in >7,200 drill holes with ≈600,000 m of core drilling and gave lignite ore resources of > 4,1Bt, which 1,15Bt are excavated since 1986. of XIX up to early years of XXI century. For further mining operations in open pits stay 1,5Bt of lignite. Under waste heaps are ≈80 km2, additional 85 km2 should be filled. All of that masses/areas were, are ...Bojan Dimitrijević, Bogoljub Vučković, Radmila Gaćina. "BEYOND 2020 - Geology explorations and open pit activities affectation in reclamation designing in Kolubara Coal Mines (KCM) Serbia, new considerations" in 17th International Conference of the open and underwater mining of minerals, Sts. Constantine and Helena Resort, Varna, 18-22 September, Bulgaria, Sofia, Bulgaria : Scientific and Technical Union of Mining, Geology and Metallurgy, (2023)
-
Analysis of the exhaust emissions inventory from auxiliary mining machines
Stevan Đenadić, Aleksandar Mirković, Jovana Mitrović, Filip Miletić, Predrag Jovančić, Dragan Ignjatović (2023)Open-pit coal mines are equipped with a large number of mining machines and vehicles with diesel engines. Due to common daily operation of these machines and vehicles large amounts of exhaust gases which contain numerous pollutants are emitted into the atmosphere. The demand to reduce air pollution induced the activities in developed countries to map and calculate all gases emitted by industries to formulate and select adequate preventive activities. In collaboration with machine manufacturers, emission standards for off-road machines ...Stevan Đenadić, Aleksandar Mirković, Jovana Mitrović, Filip Miletić, Predrag Jovančić, Dragan Ignjatović. "Analysis of the exhaust emissions inventory from auxiliary mining machines" in 9th International Conference Mining and Environmental Protection, University of Belgrade, Faculty of Mining and Geology (2023)
-
Ograničenja primene optimizacionih algoritama u slučaju kopova
Proces optimizacije površinskih kopova, kao sastavni deo strateškog planiranja, veoma je važan sa stanovišta ostvarivanja maksimalnih efekata proizvodnje. To je složen zadatak koji vrlo često podleže vrlo strogim geometrijskim i drugim praktičnim rudarskim ograničenjima. Ova ograničenja u posebno su izražena na površinskim kopovima uglja, te u značajnoj meri mogu povećati stepen neizvesnosti rudarskog projekta, odnosno izazvati neželjena dejstva u pogledu profitabilnosti poslovanja. Iz tog razloga, veoma je važna primena savremenih optimizacionih alata, koji u značajnoj meri mogu olakšati celokupan ...... presents issues related to the process of optimization of open pit coal mines using modern optimization algorithms, as well as the possibility of finding optimal solutions within a set of constraints. Ključne reči: Optimization, open pit coal mine, constraints, profitability 1. Uvod Nesumnjivo ...
... 2023-10-17 11:47:14 Ograničenja primene optimizacionih algoritama u slučaju kopova ;Application constraines of optimization algorithms in the case of open pit coal mines Dejan Stevanović, Mirjana Banković, Milica Pešić Georgiadis, Petar Marković, Dejan Ranković Дигитални репозиторијум Рударско-геолошког ...
... Београду [ДР РГФ] Ograničenja primene optimizacionih algoritama u slučaju kopova ;Application constraines of optimization algorithms in the case of open pit coal mines | Dejan Stevanović, Mirjana Banković, Milica Pešić Georgiadis, Petar Marković, Dejan Ranković | XIV Međunarodna konferencija OMC 2020, ...Dejan Stevanović, Mirjana Banković, Milica Pešić Georgiadis, Petar Marković, Dejan Ranković. "Ograničenja primene optimizacionih algoritama u slučaju kopova" in XIV Međunarodna konferencija OMC 2020, Zlatibor, Srbija, 14-17. oktobar 2020., Beograd : Jugoslovenski komitet za površinsku eksploataciju (2020)
-
A Model for Determining Fuzzy Evaluations of Partial Indicators of Availability for High-Capacity Continuous Systems at Coal Open Pits Using a Neuro-Fuzzy Inference System
This paper presents a model for determining fuzzy evaluations of partial indicators of the availability of continuous systems at coal open pits using a neuro-fuzzy inference system. The system itself is a combination of fuzzy logic and artificial neural networks. The system availability is divided into partial indicators. By combining the fuzzy logic and artificial neural networks, a model is obtained that has the ability to learn and uses expert judgment for that learning. This paper deals with the ...системи, континуални системи експлоатације (роторни багер-транспортер-дробилично постројење), рударство, расположивост, меко рачунарство, фази логика, ANN, ANFISMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović, Filip Miletić. "A Model for Determining Fuzzy Evaluations of Partial Indicators of Availability for High-Capacity Continuous Systems at Coal Open Pits Using a Neuro-Fuzzy Inference System" in Energies, MDPI AG (2023). https://doi.org/10.3390/en16072958
-
Evaluation And Perspectives Of Underground Coal Mines In Serbia
... operation (Soko, Strmosten pit in REMBAS mine, Lubnica and Štavalj) and for closure of those mines without potential (Tadenje and Jarando pits of Ibarski mines, Senjski rudnik pit of REMBAS, Bogovina and Vrška Čuka). This approach leaves Jasenovac mine and Block IV pit of REMBAS mine in between ...
... ranking, while the Jarando pit of Ibarski mines has the worst ranking. This result is mainly because Soko has significant coal reserves, stable market and potential for improvement (mechanization and investment), while these criteria are completely opposite in case of Jarando pit in Ibarski mines. However ...
... other mines. AHP analysis, based on technical criteria, identified two groups of mines, one with potential for further development (Soko, Strmosten pit- REMBAS, Lubnica and Štavalj) and the other group of mines which should be closed in near future (Tadenje and Jarando pits-Ibarski mines, Senjski ...Vladimir Milisavljević, Milena Lekić, Ivica Ristović, Vojin Čokorilo, Aleksandar Cvjetić. "Evaluation And Perspectives Of Underground Coal Mines In Serbia" in 7th Balkan Mining Congress Preceedings - BalkanMine2017, Prijedor, 11-13. oktobar 2017., Banjaluka : University of Banjalika, Faculty of Mining, RS, BiH (2017)
-
A hydrogeological model of the open-cast mine Tamnava - West Field (Kolubara Coal Basin, Serbia)
... managing dewatering in an open pit mine. In: MCCULLOUGH, C.D., LUND, M.A., and WYSE, L. (eds.) Proceedings of the International Mine Water Association Symposium. Bunbury, Australia, 2012. Bunbury: IMWA, pp. 557-567. BUHAČ, D. et al. (2012) Designe solution of open pit „South Field” dewatering from ...
... geology. Herceg Novi, Montenegro, 2002. Herceg Novi: pp 389-396. A hydrogeological model of the open-cast mine… 53 POLOMČIĆ, D. and BAJIĆ, D. (2011). 3D Hydrodinamic model of open pit mine “Polje E” (Kolubara coal basin). In: PAVLOVIĆ, V. (ed.) Proceedings of the V International Conference ...
... funding projects OI176022, TR33039, TR37005 and III43004. REFERENCES BAJIĆ, D. and POLOMČIĆ, D. (2012) A conceptual hydrogeological model for open pit mine „Polje E“ (Kolubara coal basin, Serbia). In: RŮŽIČKA, J. and RŮŽIČKOVÁ, K. (eds.) Proceedings of the GIS Ostrava 2012 - Surface models for ...Jelena Ratković, Dušan Polomčić, Dragoljub Bajić, Bojan Hajdin. "A hydrogeological model of the open-cast mine Tamnava - West Field (Kolubara Coal Basin, Serbia)" in Underground Mining Engineering no. 29, Belgrade : University of Belgrade - Faculty of mining and geology (2016): 43-54
-
Аnaliza mogućnosti povećanja nagiba završne kosine površinskog kopa “Podbraćan”
Vladimir Čebašek, Veljko Rupar (2018)Eksploatacijom boksita iz ležišta "Podbraćan" formiran je površinski kop sa maksimalnom visinom zavšne kosine od 280 m. Redovnom kontrolom stabilnosti trenutnog stanja kosina površinskog kopa utvrđeno je da faktor sigurnosti iznosi Fs = 1.71 – 1.85, a što je ukazalo da postoji mogućnost povećanja nagiba kosine. U radu je prikazan postupak analize mogućnosti povećanja nagiba završne kosine površinskog kopa "Podbraćan".Vladimir Čebašek, Veljko Rupar. "Аnaliza mogućnosti povećanja nagiba završne kosine površinskog kopa “Podbraćan”" in Mining and Geology Today, II international symposium, Belgrade, 04 - 05.12.2018., Rudarski institut, Balkanska akademija nauka, Akademija inženjerskih nauka Srbije (2018). https://doi.org/10.25075/SI.2018.17