Претрага
342 items
-
Thermal properties of soil
Djurić Tina, Rakić Dragoslav, Čaki Laslo, Ćorić Slobodan. "Thermal properties of soil" in 14 International Scientific Conference: Planning, Design, Construction and renewal in the Civil Engineering, Novi Sad: (2018): 121-121
-
Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining
Ivan Janković, Stevan Đenadić , Dragan Ignjatović , Predrag Jovančić , Tomislav Šubaranović, Ivica Ristović (2019)... pp. 153–158, ISBN 80-7099-510-6. 12. Ignjatovic, D.; Ristovic, I.; Stojakovic, M. The Methodology of the Selection of Auxiliary Mechanisation for the Open Pit Mines of Llignite. In Proceedings of the Mine Planning and Equipment Selection, Athens, Greece, 6–9 November 2000; pp. 577–581. 13. Nichols, ...
... Solution (VIKOR) [8]. In this paper, in order to define optimal evaluating methodology, the AHP method was chosen as the most suitable due to the possibility of a total and partial analysis of every parameter. The defined methodology, in relation to which the evaluation of the machine is conducted, consists ...
... Solution (VIKOR) [8]. In this paper, in order to define optimal evaluating methodology, the AHP method was chosen as the most suitable due to the possibility of a total and partial analysis of every parameter. The defined methodology, in relation to which the evaluation of the machine is conducted, consists ...Ivan Janković, Stevan Đenadić , Dragan Ignjatović , Predrag Jovančić , Tomislav Šubaranović, Ivica Ristović . "Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining" in Energies, MDPI (2019). https://doi.org/https://doi.org/10.3390/en12122245
-
The Potential of and Barriers to Renewable Energy Sources in Serbia
Ivezić Dejan, Đajić Nenad, Živković Marija. "The Potential of and Barriers to Renewable Energy Sources in Serbia" in Energy Sources, Part: B Economics Planning and Policy 8 no. 2, USA:Taylor and Francis (2013): 162-170
-
Project REASONING: Characterization and technological procedures for recycling and reusing of the rudnik mine flotation tailings
Vesna Cvetkov, Vladimir Simić, Stefan Petrović, Filip Arnaut, Milena Kostović, Dragan Radulović, Jovica Stojanović, Vladimir Jovanović, Dejan Todorović, Nina Nikolić, Jelena Senćanski, Grozdanka Bogdanović, Dragana Marilović (2024)Vesna Cvetkov, Vladimir Simić, Stefan Petrović, Filip Arnaut, Milena Kostović, Dragan Radulović, Jovica Stojanović, Vladimir Jovanović, Dejan Todorović, Nina Nikolić, Jelena Senćanski, Grozdanka Bogdanović, Dragana Marilović. "Project REASONING: Characterization and technological procedures for recycling and reusing of the rudnik mine flotation tailings" in 5th Congress Geologists of the Republic of North Macedonia, Ohrid, 28-29. 10. 2024, Македонско геолошко друштво (2024)
-
Landslide types and processes in Serbia
Abolmasov Biljana, Hadži-Niković Gordana. "Landslide types and processes in Serbia" in Croatia-Japan Project “Risk identification and land-use planning for disaster mitigation of landslides and floods in Croatia”, 1st Project Workshop: International experience. Dubrovnik, Croatia, 22-24 November 2010 1, Zagreb, Hrvtaska:Japan International Cooperation Agency (JICA) (2010): 39-39
-
On perspetives of semi-automated landslide assessment
Marjanović Miloš, Zečević Snežana, Basarić Irena. "On perspetives of semi-automated landslide assessment" in Landslide and flood hazard assessment : аbstract proceedings / 1st Regional Symposium on Landslides in the Adriatic-Balkan Region [and] 3rd Workshop of the Croatian-Japanese Project Risk Identification and Land-Use Planning for Disaster Mitigation o, Zagreb, Croatia:City of Zagreb, Emergency Management Office (2013): 64-64
-
Statistical approach in land-use suitability analysis of the Belgrade city suburbs
Petrović Rastko, Marjanović Miloš, Đurić Uroš, Šušić Vladimir, Abolmasov Biljana, Zečević Snežana (2013)Petrović Rastko, Marjanović Miloš, Đurić Uroš, Šušić Vladimir, Abolmasov Biljana, Zečević Snežana. "Statistical approach in land-use suitability analysis of the Belgrade city suburbs" in Conference Proceeding of 2nd International Scientific Conference Regional Development, Spatial Planning and Strategic Governance -RESPAG 2013 1 no. 1, Belgrade, Serbia:IAUS (2013): 517-528
-
Geotechnical aspects of three dimensional stability analysis of landslides
Ćorić Slobodan, Čaki Laslo, Rakić Dragoslav, Ubiparip Boško, Berisavljević Zoran. "Geotechnical aspects of three dimensional stability analysis of landslides" in Planning, design, construction and renewal in the civil engineering : proceedings / 12 International Scientific Conference INDIS 2012, Novi Sad, 28-30 November 2012, Novi Sad:Faculty of Technical Sciences, Department of Civil Engineering and Geodesy (2012): 361-368
-
Energy Resources in the Republic of Serbia: Development Policy
Jovančić Predrag, Kolonja Božo, Ignjatović Dragan, Tanasijević Miloš, Madžarević Aleksandar, Krstić Vojislav (2014)Jovančić Predrag, Kolonja Božo, Ignjatović Dragan, Tanasijević Miloš, Madžarević Aleksandar, Krstić Vojislav. "Energy Resources in the Republic of Serbia: Development Policy" in Journal of Energy Sources, Part B: Economics, Planning and Policy, :Taylor & Francis (2014). https://doi.org/DOI: 10.1080/15567249.2014.896
-
Damage quantification of built stone on Dark Gate (Belgrade, Serbia): sample of damage index application for decay rate evaluation
The Dark Gate is the monument of culture, part of the cultural and historical complex of the Belgrade Fortress. It is constructed of limestone blocks that after 270 years of exposure to environmental conditions and different anthropogenic influences show wide ranges of decay forms. During 2007, detail registration of all built limestone microfacies and weathering forms was done using tools of monument mapping. A correlation scheme ‘‘intensity– damage category’’ was made according to the type, intensity, and distribution of ...... serve structural integrity of a monument. Methodology of Fitzner et al. (1995) has been adopted for mapping of several gates at the Belgrade fortress during extensive restoration works undertaken from 2006 to 2008. It contributed to efficient planning of conservation and restoration interventions ...
... indices can be a very suitable strategy for controlling conservation measures and for regular re-evaluation of monuments in the framework of long-term survey and maintenance of monuments (Fitzner and Heinrichs 2002). • By aassessing level of damage of each stone block on the monument, quantity ...
... well as for assessing past treatments (Massa et al. 1991; Vergčs-Belmin 1992: Martin et al. 2002). However, glossaries alone do not provide methodology for damage quantification. In order to assess state of conservation of stone monuments, many authors combine stone mapping with other non-destructive ...Maja Franković, Nevenka Novaković, Vesna Matović. "Damage quantification of built stone on Dark Gate (Belgrade, Serbia): sample of damage index application for decay rate evaluation" in Environmental Earth Sciences, Springer Science and Business Media LLC (2015). https://doi.org/10.1007/s12665-014-3843-z
-
Uticaj geološke neizvesnosti u razvoju rudarskih projekata
Rudarstvo je industrija koja se nosi sa različitim vrstama neizvesnosti i rizika zbog svoje prirode i specifičnosti. Neizvesnost u rudarstvu može poticati iz različitih izvora i uticati na različite aspekte rudarskih projekata. Kao jedan od dominantnih faktora, ističe se geološka neizvesnost. Geološka neizvesnost igra ključnu ulogu u rudarstvu i može značajno uticati na procenu resursa i rezervi, planiranje eksploatacije, ekonomsku isplativost i upravljanje rizicima. Ova neizvesnost se ne može eliminisati, ali se uz primenu adekvatnih standarda i zakona može ...... Adaptive open-pit mining planning under geological uncertainty. Resources Policy , 72. [2] (2012). Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code). [3] Benndorf, J., Dimitrakopoulos, R. (2013). Stochastic long-term production scheduling ...
... the dominant factors. Geological uncertainty plays a key role in mining and can significantly affect resource and reserve estimation, exploitation planning, economic profitability and risk management. This uncertainty cannot be eliminated, but with the application of adequate standards and laws, it ...
... (grade of iron in the ore). The results were generated in the Whittle software package. Keywords: geological uncertainty, risk, pit optimization, planning 1. Uvod Savremeno rudarstvo izloženo je stalnom trendu pogoršanja uslova poslovanja. Mogućnost ostvarenja ekonomskih i drugih ciljeva rudarskog ...Petar Marković, Dejan Stevanović, Mirjana Banković. "Uticaj geološke neizvesnosti u razvoju rudarskih projekata" in XI Međunarodna konferencija "Ugalj i kritični minerali 2023", CCM 2023, Zlatibor, 11-14. oktobar 2023., Beograd : Jugoslovenski komitet za površinsku eksploataciju (2023)
-
Determination of Mechanical Properties of Altered Dacite by Laboratory Methods
This paper presents a methodology for determining the uniaxial and triaxial compressive strength of heterogeneous material composed of dacite (D) and altered dacite (AD). A zone of gradual transition from altered dacite to dacite was observed in the rock mass. The mechanical properties of the rock material in that zone were determined by laboratory tests of composite samples that consisted of rock material discs. However, the functional dependence on the strength parameter alteration of the rock material (UCS, intact ...... Belgrade, Serbia; nikola.zivanovic@sfb.bg.ac.rs * Correspondence: veljko.rupar@rgf.bg.ac.rs; Tel.: +381-645494491 Abstract: This paper presents a methodology for determining the uniaxial and triaxial compressive strength of heterogeneous material composed of dacite (D) and altered dacite (AD). A zone of ...
... at a percentage of 30% AD. Comparison of the obtained exponential equation with practical suggestions shows a good correspondence. The suggested methodology for determining heterogeneous rock mass strength parameters allows us to determine the influence of rock material heterogeneity on the values σci ...
... Belgrade, Serbia; nikola.zivanovic@sfb.bg.ac.rs * Correspondence: veljko.rupar@ref.bg.ac.rs; Tel.: +381-645494491 Abstract: This paper presents a methodology for determining the uniaxial and triaxial compressive strength of heterogeneous material composed of dacite (D) and altered dacite (AD). A zone of ...Veljko Rupar, Vladimir Čebašek, Vladimir Milisavljević, Dejan Stevanović, Nikola Živanović. "Determination of Mechanical Properties of Altered Dacite by Laboratory Methods" in Minerals, MDPI AG (2021). https://doi.org/10.3390/min11080813
-
Towards a Mining Equipment Ontology
... present in the relevant terminological resource. The SUKU information system itself is a result of several phases of software development during the long-term research of the problem of coal quality management. The first versions of the software related to the problem of coal homogenization was developed ...
... panel, which shows the basic term used, its synonyms (none in this case), and its definition. For each term, available translational equivalents in other languages can be displayed, as illustrated by the smaller panel in Figure 3,which shows the translations of the term Rudnik (Coal Mine) in French ...
... relations between equivalent terms in different languages, or translational equivalents, can also be established. In RudOnto, one term is always selected as the basic term, and hence there is always one basic translational equivalent, whereas all other equivalents, if they exist, are represented as ...Ranka Stanković, Ivan Obradović, Olivera Kitanović, Ljiljana Kolonja. "Towards a Mining Equipment Ontology" in Proceedings of the 12th International Conference Research and Development in Mechanical Industry, RaDMI 2012, September 2012, Vrnjačka Banja, Serbia no. 1, Vrnjačka Banja, Serbia : SaTCIP (Scientific and Technical Center for Intellectual Property) Ltd. (2012)
-
Optimizacija utovarno-transportnih sistema u funkciji planiranja površinskog kopa
Mirjana V. Banković (2018-07-13)Profitabilna eksploatacija sve složenijih ležišta je težak zadatak koji zavisi odtemeljnog procesa analize, planiranja i projektovanja rudnika. Izvodljiv strateškiplan mora da zadovoljava društvena, regulatorna, tehnološka, geometrijska iekonomska ograničenja. Kako bi se postigao osnovni cilj, odnosno profitabilnost iodrživost rudarskog projekta na duži period, neophodno je unapređenjematematičkih modela i informatičke podrške procesima planiranja i optimizacijekoji će omogućiti efikasnu realizaciju ovih ciljeva...tehnološki model, integralni model, planiranje, optimizacija,utovarno-transportni sistem, neto sadašnja vrednost projekta... Gholamnejad, J., Karimi, B., 2008, Long-term open pit mine production planning: a review of models and algorithms. International Journal of Mining, Reclamation and Environment, 22 (1), 3-35. Pana, M., Carlson, T., 1966, Description of a computer technique used in mine planning of the Utah Mine of Kennnecott ...
... 202 Ramazan, S., Dimitrakopoulos, R., 2007, Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation. Orebody Modelling and Strategic Mine Planning, Spectrum Series, 14, 359-365. Rasper, L., 1975, The bucket wheel excavator: d ...
... full-scale experimental check. International Journal of Mineral Processing, 8 (3), 201-238. Hall, B., 2006, Short-term gain for long-term pain - How focussing on tactical issues can destroy long-term value. 2nd International Seminar Strategic versus Tactical Approaches in Mining, 1-19. Hartman, H. L., 1998 ...Mirjana V. Banković. "Optimizacija utovarno-transportnih sistema u funkciji planiranja površinskog kopa" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2018-07-13)
-
Development of terminological resources for expert knowledge: a case study in mining
Ljiljana Kolonja, Ranka Stanković, Ivan Obradović, Olivera Kitanović, Aleksandar Cvjetić. "Development of terminological resources for expert knowledge: a case study in mining" in Knowledge Management Research & Practice, Palgrave Macmillan (2015). https://doi.org/10.1057/kmrp.2015.10
-
Present Situation and Alternative Water Supply Solutions for Northern Vojvodina (Serbia)
The northern part of the Autonomous Province of Vojvodina is situated in the central and southeastern sectors of the Pannonian Basin. Drinking water supply is provided by groundwater abstraction from depths of 60 to 200 m. The quality of that water is poor, especially due to high concentrations of arsenic which most water supply systems do not remove. Current planning documents call for the construction of large regional water supply schemes on the banks of the Danube and Tisa ...Bojan Hajdin, Vesna Ristić-Vakanjac, Dušan Polomčić. "Present Situation and Alternative Water Supply Solutions for Northern Vojvodina (Serbia)" in Proceedings of Bulgarian Academy of Sciences, "Prof. Marin Drinov" Publishing House of Bulgarian Academy of Sciences (2020). https://doi.org/10.7546/CRABS.2020.04.09
-
Development and evaluation of fracture gradient curve model: a case study of south-central Kazakhstan
An accurate fracture gradient value is one of the most important issues in oil and gas well design and drilling. The value of a fracture gradient is a critical parameter for determining the drilling mud weight and selecting the proper depths for setting the casing in the planning process of drilling operations. This paper proposed the new curve model of fracture gradient for the south-central Kazakhstan (central Asia) region based on the analysis of leak-off test and format integrity ...Branimir Stanisavljevic, Vesna Karovic Maricic, Irena Isakov. "Development and evaluation of fracture gradient curve model: a case study of south-central Kazakhstan" in International Journal of Oil, Gas and Coal Technology, Inderscience Publishers (2022). https://doi.org/10.1504/IJOGCT.2023.128042
-
Hidrodinamički proračun zaštite površinskog kopa Drmno od podzemnih voda u periodu 2018-2022. godina
Površinski kop lignita Drmno nalazi se u blizini velikih reka (Dunav i Mlava), zbog čega eksploatacija otkrivke i lignita u velikoj meri zavisi od sistema zaštite od podzemnih voda. Ukoliko je sistem zaštite od podzemnih voda dobro isplaniran, a njegov kapacitet dobro proračunat, onda će se eksploatacija obavljati u suvoj sredini, što podrazumeva sigurnu proizvodnju otkrivke i lignita. U današnje vreme uz primenu adekvatnih softvera olakšano je kvalitetno planiranje i proračunavanje sistema za zaštitu površinskih kopova od podzemnih voda. ...Dušan Polomčić, Tomislav Šubaranović, Zoran Stojićević. "Hidrodinamički proračun zaštite površinskog kopa Drmno od podzemnih voda u periodu 2018-2022. godina" in Zbornik apstrakata sa 9. Međunarodne konferencije Ugalj, Zlatibor, 2019., Jugoslovenski komitet za površinsku eksploataciju (2019)
-
Flood protection and water utilization of karst poljes: example of Gatačko Polje, Eastern Herzegovina
Tina Dašić, Ljiljana Vasić (2020)Earth-Surface Processes,Geology, Pollution, Soil Science, Water Science and Technology, Environmental Chemistry,Global and Planetary ChangeTina Dašić, Ljiljana Vasić. "Flood protection and water utilization of karst poljes: example of Gatačko Polje, Eastern Herzegovina" in Environmental Earth Sciences, Springer Science and Business Media LLC (2020). https://doi.org/10.1007/s12665-020-08987-4
-
Coal homogenization stockyard sizing “Tamnava – Zapad” case study
... value of 1 to 2 days, while emptying takes twice as long. The variability of pile size moves this rule, because filling a shorter pile will take a shorter amount of time, and conversely, a longer pile takes longer to fill. Of course, planning pit operations as a function of block quality at the ...
... Kazakhstan Mining Company Case Study. In Mine Planning and Equipment Selection (pp. 1017-1027). Springer International Publishing. 8. Stevanović D., Kolonja B., Stanković R., Knežević D., Jovanović M., “Application of stochastic models for mine planning and coal quality control”, ISSN 0354-9836, Thermal ...
... homogenization is planned according to lower heating value, and the process takes place in several steps. The homogenization entails realistic planning of surface mining based on a precise and accurate coal quality database and proper use of available equipment. However, anticipated large oscillations ...Božo Kolonja, Dinko Knežević, Ranka Stanković, Dejan Stevanović, Detlef Trummer. "Coal homogenization stockyard sizing “Tamnava – Zapad” case study" in Proceedings of 13th International Symposium Continuous Surface Mining, ISCSM 2016, / (2016)