Претрага
471 items
-
Open-pit Filijala northwest slope stabilization in order to reduce damage risk and enviromental protection
Čebašek Vladimir, Gojković Nebojša (2013)Čebašek Vladimir, Gojković Nebojša. "Open-pit Filijala northwest slope stabilization in order to reduce damage risk and enviromental protection" in Podzemni radovi no. 22, Beograd:Univerzitet u Beogradu Rudarsko-geološki fakultet (2013): 49-61
-
Potential traps and risks in slope stability calculations at open pit mines
Vujić Slobodan, Čebašek Vladimir, Gajić Grozdana, Gojković Nebojša, Miljanović Igor, Petrovski Aleksandar (2011)Vujić Slobodan, Čebašek Vladimir, Gajić Grozdana, Gojković Nebojša, Miljanović Igor, Petrovski Aleksandar. "Potential traps and risks in slope stability calculations at open pit mines" in 4th Balkan Mining Congress BALKANMINE 2011, Ljubljana (2011): 527-530
-
Qualification of open pit mines based on external risks assessment
Milutinović Aleksandar, Miljanović Igor, Panić Biljana. "Qualification of open pit mines based on external risks assessment" in Proceedings of the XI Balkan Conference on Operations Research BALCOR, 7-11.09.2013. - no. -, Beograd, Zlatibor, Srbija:University of Belgrade, Faculty of Organizational Sciences, Belgrade (2013): 705-709
-
Multi-variable assessment of risk in selection of location and the way of open pit mines opening
Vujić Slobodan, Hudej Marjan, Miljanović Igor. "Multi-variable assessment of risk in selection of location and the way of open pit mines opening" in Proceedings of the 5th Balkan Mining Congress BALKANMINE 2011, 18-20.10.2013 - no. -, Ohrid, FYR Macedonia:ELEM, University Goce Delcev, Stip (2013): 1-6. https://doi.org/-
-
Factors that influence the selection of an optimal groundwater protection system at open-pit mines
Bajić Dragoljub, Polomčić Dušan, Močević Jelena. "Factors that influence the selection of an optimal groundwater protection system at open-pit mines" in Pavlović Vladimir, Zlatibor:Jugoslovenski komitet za površinsku eksploataciju (2015): 9-16
-
Application of the unmanned aerophotogrammetry in monitoring conditions and changes at the open pit mines
Vujić Slobodan, Radosavljević Nenad, Milutinović Aleksandar, Gigov Mihajlo. "Application of the unmanned aerophotogrammetry in monitoring conditions and changes at the open pit mines" in Journal ”Mining and Metallurgy Engineering” no. in print, Bor:Mining and Metallurgy (2016): 1-6. https://doi.org/DOI 10.5937/MMEB160100IV
-
Hydrogeological research performed for stabilization of internal landfill of “Drmno” open pit
Mirjana Rajaković, Dušan Polomčić, Dragoljub Bajić. "Hydrogeological research performed for stabilization of internal landfill of “Drmno” open pit " in Proceedings of the XVIII Serbian Geological Congress, Divčibare, Serbia, 01-04 June 2022, Serbian Geological Society (2022)
-
Uncertainty in open pit optimisation
Kolonja Božo, Stevanović Dejan, Pešić Georgiadis Milica, Banković Mirjana, Kolonja Ljiljana. "Uncertainty in open pit optimisation" in 5th International symposium Mining and environmental protection, Beograd:Faculty of Mining and geology, Belgrade (2015): 358-392
-
Petrologic and technical properties of the Triassic limestone from the open pit Rupeljevo
Avramović Nikola, Matović Vesna, Gajić Violeta, Srećković Batoćanin Danica, Matović Nenad, Munjas Branko (2012)Avramović Nikola, Matović Vesna, Gajić Violeta, Srećković Batoćanin Danica, Matović Nenad, Munjas Branko. "Petrologic and technical properties of the Triassic limestone from the open pit Rupeljevo" in Proceedings / 2nd International Conference Harmony of Nature and Spirituality in Stone, 15-16 March 2012, Kragujevac, Belgrade:Stone Studio Association (2012): 97-107
-
The impact of sand open pit „Jakovačka Kumša“ on groundwater in a part of Belgrade source
Matić Ivan, Polomčić Dušan, Vujasinović Slobodan, Marić Nenad, Zarić Jelena. "The impact of sand open pit „Jakovačka Kumša“ on groundwater in a part of Belgrade source" in Proceedings / IWA Specialist Groundwater Conference, 08-10 September 2011, Beograd:Institute for the Development of Water Resources Jaroslav Černi (2011): 397-403
-
Proactive monitoring system for basic mining equipment at open pit mines of Electric Power Industry of Serbia
Jovančić Predrag, Ignjatović Dragan, Tanasijević Miloš. "Proactive monitoring system for basic mining equipment at open pit mines of Electric Power Industry of Serbia" in XXI International Congress on Maintenance and Asset Management – EUROMAINTENANCE 1, Beograd :Serbian Maintenance Society (2012): 622-630
-
A Method for defining the boundaries of an open pit according to the surface
Hristov Stojan, Dimitrijević Bojan (2011)Hristov Stojan, Dimitrijević Bojan. "A Method for defining the boundaries of an open pit according to the surface" in Zbornik radova 5. Međunarodna konferencija UGALj 2011 no. V, Златибор, Србија :Jugoslovenski Komitet za površinsku eksploataciju Saveza inženjera rudarstva i geologije Srbije (2011): 79-88
-
Determining indirect dependency of production segments within thermal power plant „Open pit mines Kostolac“ by multisectoral models
Maksimović Svetomir, Miljanović Igor, Živojinović Miljanović Ivana, Josipović Pejović Milena, Petrovski Aleksandar (2013)Maksimović Svetomir, Miljanović Igor, Živojinović Miljanović Ivana, Josipović Pejović Milena, Petrovski Aleksandar. "Determining indirect dependency of production segments within thermal power plant „Open pit mines Kostolac“ by multisectoral models" in Proceedings of the 5th Balkan Mining Congress BALKANMINE 2011, 18-20.10.2013 - no. -, Ohrid, FYR Macedonia:ELEM, University Goce Delcev, Stip (2013): 68-73. https://doi.org/-
-
Optimisation the final countur of the open pit North mining district using the software package Whittle
Kržanović Daniel, Stevanović Dejan, Rajković Radmilo, Jovanović Milenko, Žikić Miodrag, Stojadinović Saša (2016)Kržanović Daniel, Stevanović Dejan, Rajković Radmilo, Jovanović Milenko, Žikić Miodrag, Stojadinović Saša. "Optimisation the final countur of the open pit North mining district using the software package Whittle" in 48th International October Conference on Mining and Metaullurgy, Bor:Technical Faculty in Bor (2016): 435-439
-
Environmental Noise Management in Serbian Open Pit Mines
Cvjetić Aleksandar, Lilić Nikola, Milisavljević Vladimir, Pantelić Uroš. "Environmental Noise Management in Serbian Open Pit Mines" in Mining and Environmental Protection, 6th International Symposium, MEP 17, Vrdnik, 21-24 June 2017, Beograd:University of Belgrade, Faculty of Mining and Geology (2017): 349-354
-
Dependability assesment of open-pit mines equpment – study on the bases of fuzzy algebra rules
Tanasijević Miloš, Ivezić Dejan, Jovančić Predrag, Ignjatović Dragan, Bugarić Uglješa. "Dependability assesment of open-pit mines equpment – study on the bases of fuzzy algebra rules" in Eksploatacja i Niezawodnosc – Maintenance and Reliability 15 no. 1, Warsaw, Poland:Polish Maintenance Society (2013): 66-74
-
Dewatering regime in flooded open pit and its impact on slope stability
Slavko M. Torbica, Veljko D. Lapčević, Lazar B. Stojanović. "Dewatering regime in flooded open pit and its impact on slope stability" in Tehnika (2014). https://doi.org/10.5937/tehnika1404591T
-
A Data Driven Approach for Raw Material Terminology
Olivera Kitanović, Ranka Stanković, Aleksandra Tomašević, Mihailo Škorić, Ivan Babić, Ljiljana Kolonja (2021)The research presented in this paper aims at creating a bilingual (sr-en), easily searchable, hypertext, born-digital, corpus-based terminological database of raw material terminology for dictionary production. The approach is based on linking dictionaries related to the raw material domain, both digitally born and printed, into a lexicon structure, aligning terminology from different dictionaries as much as possible. This paper presents the main features of this approach, data used for compilation of the terminological database, the procedure by which it has ...sirovine, rudarstvo, terminologija, rečnik, terminološka aplikacija, mobilna aplikacija, digitizacija, leksički podaci, korpusi, otvoreni povezani podaci... AXN—an adjective followed by a noun; the adjective and the noun have to agree in all four grammatical categories; examples are ‘površinski kop’ (open pit—5738), ‘ugljeni sloj’ (coal seam—1686), ‘rudarski projekt’ (mining project—1412). • NprepNp (11%), N4X—a noun followed by two words that do not inflect ...
... resource, mostly handcrafted, was also developed to support knowledge management in specific subfields of mining engineering, such as mining equipment, mine safety and geostatistics [22]. A thesaurus of mining terminology is available online, but it is not systematically updated. Moreover the application ...
... component relations (between single words and terminological phrases). For example, lexical entry ‘rudar’ (miner, person engaged in mining, a worker in a mine) contains information related to part of speech: ‘N’ (noun), morphological class ‘N2’, semantic tag ‘+Hum’ (human), domain ‘DOM = mining’. Its inflected ...Olivera Kitanović, Ranka Stanković, Aleksandra Tomašević, Mihailo Škorić, Ivan Babić, Ljiljana Kolonja. "A Data Driven Approach for Raw Material Terminology" in Applied Sciences, MDPI AG (2021). https://doi.org/10.3390/app11072892
-
Stabilization and monitoring of the slope deformation appearance on marl open-pit Filijala in order to minimize the risk of exploitation process interruption
Gojković Nebojša, Čebašek Vladimir, Ganić Aleksandar, Milutinović Aleksandar. "Stabilization and monitoring of the slope deformation appearance on marl open-pit Filijala in order to minimize the risk of exploitation process interruption" in V-th International geomechanics conference 1, Varna, Bulgaria:Scientific and Technical Union of Mining, Geology and Metallurgy (2012): 220-227
-
Influencing the energetic efficiency of clay minerals open pit mines by corrections in technology processes real time
Vujić Slobodan, Kasaš Karolj, Miljanović Igor, Petrovski Aleksandar, Kermeci Žolt, Popov Katica, Milutinović Aleksandar (2011)Vujić Slobodan, Kasaš Karolj, Miljanović Igor, Petrovski Aleksandar, Kermeci Žolt, Popov Katica, Milutinović Aleksandar. "Influencing the energetic efficiency of clay minerals open pit mines by corrections in technology processes real time" in Proceedings, 22nd International Mining Congress 1, Ankara, Turkey:UCTEA, The Chamber of Mining Engineers (2011): 181-188