Geotehnički uslovi izgradnje metro stanice „Savski trg“ – beogradski metro linija 1
Ukrštanje linija 1 i 2 beogradskog metroa, planirano je na lokaciji “Savski trg” gde će se izgraditi zajednička metro stanica. Zbog složene konstrukcije objekta i različite dubine dijafragmi, koja na delu metro linije 2 iznosi preko 40 m, planirana je fazna izgradnja. U vezi sa tim u radu je prikazan način definisanja geotehničkog modela, kao i geotehnički proračuni u kojima su analizirani: fazni načini iskopa, filtraciona analiza, uticaj pornih i efektivnih napona na stabilnost dijafragme, horizontalna i vertikalna ...beogradski metro, metro stanica, geotehnički model, stabilnost dijafragme, horizontalna pomeranja, vertikalna pomeranjaDragoslav Rakić, Nemanja Stanić, Josip Išek, Slavoljub Stojković. "Geotehnički uslovi izgradnje metro stanice „Savski trg“ – beogradski metro linija 1" in Geotehnički aspekti građevinarstva i zemljotresno inženjerstvo – Vrnjačka Banja, 01-03. novembar 2023., Beograd : Savez građevinskih inženjere Srbije (2023)
-
Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One
In order to solve serious traffic congestion in Belgrade, a number of studies regarding the Belgrade Metro construction have been carried out since 1973. However, only in 2019, the routes of the future metro lines 1 and 2 were de-fined as a part of the General Metro Construction Project. The lines are de-signed to intersect at the location of Sava Square, where an interchange met-ro station will be built. It represents a complex geotechnical structure consist-ing of three different ...Nemanja Stanic, Dragoslav Rakic, Josip Isek, Slavoljub Simic. "Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One" in Lecture Notes in Civil Engineering, Springer Nature Singapore (2024). https://doi.org/10.1007/978-981-97-8221-5_11
-
The Importance of Geotechnical Investigations for the Construction of Transfer Station „Prelići“ on Landfill in Cacak – Serbia
For the purpose of the facilities construction within the transfer station „Prelici“ in Cacak, specific geotechnical investigations were carried out based on which the technological project with the facilities schedule was developed. Significant deviations in relation to the presented results were determined during earthworks, so the additional geotechnical investigation works were carried out. Since the new investigation works have determined a different cross section of the terrain, it was proposed to move the planned facilities which led to the ...... of establishing a recycling yard, i.e. transfer station, • increasing investment and exploitation costs for equipment and labor. 3. PRESENTATION OF TRANSFER STATION „PRELICI“ WITH SELECTION AND RECYCLING CENTER As a part of the transfer station “Prelici”, the following technological units are ...
... Transfer Station „Prelići“ on Landfill in Cacak – Serbia Dragoslav Rakić, Irena Basarić, Jovana Janković, Tina Đurić Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] The Importance of Geotechnical Investigations for the Construction of Transfer Station „Prelići“ ...
... was closed in a longer period of 1994. Transfer station and Recycling Waste Center have been put into operation in 2016, and together represent the first project of this kind in Serbia. The facilities within the complex of transfer station were built on an area of around 2.2 ha. Waste that is ...Dragoslav Rakić, Irena Basarić, Jovana Janković, Tina Đurić. "The Importance of Geotechnical Investigations for the Construction of Transfer Station „Prelići“ on Landfill in Cacak – Serbia" in 17th International waste management and landfill symposium, Proceedings SARDINIA 2019, CISA Publisher (2019)
-
Geotehnički uslovi izgradnje metro stanice "Francuska" u Beogradu
Lazar Pavlović (2024)Cilj ovog rada je analiza stabilnosti dijafragme, predviđene kao mere za obezbeđenje dubokog iskopa od zarušavanja okolnog tla koji se izvodi na mestu buduće metro stanice “Francuska” koja je planirana u okviru prve faze, prve linije metroa u Beogradu – sekcije „Centar“. U okviru numeričke analize je izvršena analiza stabilnosti konzolne dijafragme kao i dijafragme sa ankerom – slobodno oslonjene dijafragme, kako bi se moglo napraviti poređenje dobijenih vrednosti koje se odnose na dubinu fundiranja koja je potrebna da ...... se odnosi na definisanje geotehničkih uslova izgradnje metro stanice koja Jje planirana u okviru prve faze, prve linije metroa u Beogradu — sekcije „Centar“. U master radu su, na osnovu rezultata istraživanja izvedenih na lokaciji buduće metro stanice, definisana: «• Geološka građa terena; «• ...
... Измењено: 2024-09-19 12:01:55 Geotehnički uslovi izgradnje metro stanice "Francuska" u Beogradu Lazar Pavlović Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Geotehnički uslovi izgradnje metro stanice "Francuska" u Beogradu | Lazar Pavlović | | 2024 | | ...
... predviđene kao mere za obezbeđenje dubokog iskopa od zarušavanja okolnog tla koji se izvodi na mestu buduće metro stanice “Francuska” koja je planirana u okviru prve faze, prve linije metroa u Beogradu — sekcije „Centar“. U okviru numeričke analize je izvršena analiza stabilnosti konzolne dijafragme ...Lazar Pavlović. Geotehnički uslovi izgradnje metro stanice "Francuska" u Beogradu, 2024
-
Karst aquifer impact on the formation of surface runoff: case study of the Resava River catchment, Serbia
Marina Mitrašinović, Vesna Ristić Vakanjac, Veljko Marinović, Saša Milanović, Ljiljana Vasić, Dušan Polomčić (2022)The paper compares the flow regimes of the Resava River at the gauging stations of the Manasija Monastery (upper course) and the town of Svilajnac (lower course). The hydrological analysis encompasses a multiyear period of monitoring (1982–2020). The water budget and baseflow index are assessed for the catchment areas monitored by the Svilajnac station (683 km2) and the Manasija Monastery station (358k m2), considering the overall monitoring period and characteristic years. The results indicate that the specific runoff in ...... Vrh weather station that covers the upper catchment and the Smederevska Palanka weather station that monitors the lower catchment. In 2001, the Crni Vrh weather station recorded 726.1 mm, which was 40.2 mm lower than the multiyear average, while the Smederevska Palanka weather station registered ...
... monitoring (1982—2020). The water budget and baseflow index are assessed for the catchment areas monitored by the Svilajnac station (683 km?) and the Manasija Monastery station (358k m?), considering the overall monitoring period and characteristic ycars. The results indicate that the specific runoff ...
... reference values for the catchment area monitored by the gauging station at the Manasija Monastery, for the multiyear period as well as the dry and wet ycars. The resulting values for the part ofthe catchment monitored by the gauging station at the Manasija Monastery show that the upper catchment ofthe ...Marina Mitrašinović, Vesna Ristić Vakanjac, Veljko Marinović, Saša Milanović, Ljiljana Vasić, Dušan Polomčić. "Karst aquifer impact on the formation of surface runoff: case study of the Resava River catchment, Serbia" in National Conference with International Participation “GEOSCIENCES 2022”, Sofia : Bulgarian geological society (2022)
-
Fuzzy optimization in hydrodynamic analysis of groundwater control systems: Case study of the pumping station “Bezdan 1”, Serbia
Dragoljub Bajić, Dušan Polomčić (2014)A groundwater control system was designed to lower the water table and allow the pumping sta-tion “Bezdan 1” to be built. Based on a hydrodynamic analysis that suggested three alternative solutions, mul-ticriteria optimization was applied to select the best alternative. The fuzzy analytic hierarchy process methodwas used, based on triangular fuzzy numbers. An assessment of the various factors that influenced the selec-tion of the best alternative, as well as fuzzy optimization calculations, yielded the “weights” of the alternativesand the ...groundwater lowering, groundwater management scenario, fuzzy analytic hierarchy process,expert knowledge, triangular fuzzy numbers, linguistic variables... study of the pumping station “Bezdan 1”, Serbia Dragoljub Bajić, Dušan Polomčić Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Fuzzy optimization in hydrodynamic analysis of groundwater control systems: Case study of the pumping station “Bezdan 1”, Serbia | ...
... approach described Fuzzy optimization in hydrodynamic analysis of groundwater control systems: Case study of the pumping station 105 Fig. 1. Study area and “Bezdan 1” pumping station. Fig. 2. Lowering of the water table, alternatives 1, 2 and 3, as a result of control system operation. above, the ...
... statement. The linguistic or fuzzy variable is Fuzzy optimization in hydrodynamic analysis of groundwater control systems: Case study of the pumping station “Bezdan 1”, Serbia DRAGOLJUB BAJIĆ1 & DUŠAN POLOMČIĆ2 Abstract. A groundwater control system was designed to lower the water table and allow the ...Dragoljub Bajić, Dušan Polomčić. "Fuzzy optimization in hydrodynamic analysis of groundwater control systems: Case study of the pumping station “Bezdan 1”, Serbia" in Geološki anali Balkanskoga poluostrva, Belgrade : University of Belgrade - Faculty of mining and geology (2014). https://doi.org/10.2298/GABP1475103B
-
Application of the VIKOR and FAHP multi-criteria optimisation methods for choosing the optimal groundwater control system: case of pumping station Bezdan 1 (Serbia)
Bajić Dragoljub, Polomčić Dušan, Ristić Vakanjac Vesna, Ratković Jelena, Čokorilo Ilić Marina (2017)Bajić Dragoljub, Polomčić Dušan, Ristić Vakanjac Vesna, Ratković Jelena, Čokorilo Ilić Marina. "Application of the VIKOR and FAHP multi-criteria optimisation methods for choosing the optimal groundwater control system: case of pumping station Bezdan 1 (Serbia)" in Proceedings of the national conference with international participation „Geosciences 2017“, Sofia:Bulgarian Geological Society (2017): 131-132
-
GNSS Time Series as a Tool for Seismic Activity Analysis Related to Infrastructure Utilities
Sanja Tucikešić, Ankica Milinković, Branko Božić, Ivana Vasiljević, Mladen Slijepčević . "GNSS Time Series as a Tool for Seismic Activity Analysis Related to Infrastructure Utilities" in Contributions to International Conferences on Engineering Surveying. Springer Proceedings in Earth and Environmental Sciences, Dubrovnik, Croatia, October 22-23, 2020, Springer, Cham (2021). https://doi.org/10.1007/978-3-030-51953-7_21
-
Model of the Geomagnetic reference field of the Republic of Serbia
Spomenko J. Mihajlović, Vesna Cvetkov (2024)Spomenko J. Mihajlović, Vesna Cvetkov. "Model of the Geomagnetic reference field of the Republic of Serbia" in 5th Congress Geologists of the Republic of North Macedonia, Ohrid, 28-29. 10. 2024, Македонско геолошко друштво (2024)
-
Hydrographic and hydrological characterization of the Vodenička and Rosomačka rivers
Vesna Ristić Vakanjac, Marina Čokorilo Ilić, Dušan Polomčić, Dragoljub Bajić, Jelena Ratković (2017)The Visočica River rises in Bulgaria, on the Berovo Mountain. Its course in Bulgaria is 16.7 km long. It enters Serbia near the village of Donji Krivodol. Up to the village of Pakleštica, or the beginning of Lake Zavoj, its right-bank tributaries are the Krivodolštica, the Vodenička, the Rosomačka and the Dojkinačka. There are no left-bank tributaries. Among the tributaries, water levels and discharges are gauged only on the Dojkinačka River. The Vodenička had also been gauged but only ...... протицаја разматраних профила The most upstream gauging station on the Visočica is at Izatovac, which covers a catchment area of 156 km 2 . The average discharge of the Visočica at this station is 1.05 m3 /s. The most downstream station is at Pakleštica and it covers a catchment area about three ...
... However, three of them have been decommissioned: at Pakleštica, Visočka Ržana and Izatovac. The only remaining station is at Braćevci. For their own needs, Pirot HPP activated the station at Pakleštica in 1990 and at Visočka Ržana in 2011. Based on available data, the paper presents a preliminary ...
... There are no left-bank tributaries. Water levels and discharges of the Visočica are currently monitored at only one official gauging station, at Braćevci. This station В. Ристић Вакањац и сар.: Карактер. Воденичке... Пиротски зборник 42 (2017) 1-24 8 has been in service since ...Vesna Ristić Vakanjac, Marina Čokorilo Ilić, Dušan Polomčić, Dragoljub Bajić, Jelena Ratković. "Hydrographic and hydrological characterization of the Vodenička and Rosomačka rivers" in Pirotski zbornik, Pirot : Narodna biblioteka Pirot (2017). https://doi.org/10.5937/pirotzbor1742001R
-
Preliminary impact assessment of No2 emission from a heating plant on air pollution: case of Zemun, Serbia
The aim of this paper is to provide a preliminary evaluation of the impact caused by NO2 emissions from a heating plant on the local air quality. To model the spatial distribution of NO2 emissions from the heating plant, the AERMOD model was employed. The evaluation was conducted by analyzing and contrasting the simulated NO2 concentration from the heating plant with the overall NO2 concentration recorded at the nearest monitoring station over the entire heating season. The study focused ...Boban Pavlović, Uroš Pantelić, Marija Živković, Dejan Ivezić. "Preliminary impact assessment of No2 emission from a heating plant on air pollution: case of Zemun, Serbia" in Environmental Engineering and Management Journal (2023). https://doi.org/10.30638/eemj.2023.086
-
The Impact Assessment of NO2 Emission from District Heating Plant on Local Air Quality, the Case of Zemun, Belgrade
The Belgrade district heating system relies on fossil fuels in heat production, where natural gas has the largest share of around 95% and fuel oil with around 4.4%. The Zemun heating plant is completely fueled with fuel oil. Currently, it is the largest plant that is not fueled with natural gas. The objective of this paper is to assess the impact of NO2 from the Zemun heating plant on local air quality by analyzing and comparing the concentration of ...NO2, Zagađenje vazduha, Kvalitet vazduh na lokalnom nivou, Model disperzije, AERMOD, Daljinsko grejanje, BeogradBoban Pavlović, Uroš Pantelić, Marija Živković, Dejan Ivezić. "The Impact Assessment of NO2 Emission from District Heating Plant on Local Air Quality, the Case of Zemun, Belgrade" in Conference on Sustainable Development of Energy, Water and Environment Systems, Dubrovnik, 10.10.-15.10.2021., University of Zagreb, Zagreb, Croatia; Instituto Superior Técnico, Lisbon, Portugal (2021)
-
Prilog poznavanju režima i bilansa voda reke Resave
Sliv Resave zauzima područje između reke Velike Morave i obronaka Kučajsko-beljaničkih planina. Sliv i režim ove reke kontroliše se dvema hidrološkim stanicama: Manastir Manasija (slivno područje u iznosu od 388 km2) i Svilajnac (681 km2). Za potrebe analize režima voda reke Resave i uticaja padavina na formiranje oticaja sa njenog sliva preuzeti su podaci o padavinama sa meteorološke stanice Crni Vrh (1037 m nm) koji odslikava režim gornjeg dela sliva ove reke, i meteorološke stanice Smederevska ...Marina Mitrašinović, Vesna Ristić Vakanjac, Saša Milanović, Ljiljana Vasić, Dušan Polomčić. "Prilog poznavanju režima i bilansa voda reke Resave" in Zbornik radova XVI Srpski hidrogeološki simpozijum sa međunarodnim učešćem, Zlatibor, 2022., Univerzitet u Beogradu, Rudarsko-geološki fakultet (2022)
-
Overwiew of In-Pit Crushing & Conveying Technology in Open Pit Mines
The conditions under which contemporary surface mining operations is carried out obviously becoming increasingly complex. In such complex conditions, the optimization of haulage systems as the technological phase with the largest share in the total operating costs, is very important from the aspect of achieving profitability of the mining project. In a large number of cases, the application of traditional haulage systems with trucks (as the most dominant type of haulage in open pit mines) does not lead to ...Ali Nasirinezhad, Dejan Stevanović, Dragan Ignjatović, Petar Marković. "Overwiew of In-Pit Crushing & Conveying Technology in Open Pit Mines" in 8th International Conference MIining And Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021)
-
Results of Recent Monitoring Activities on Landslide Umka, Belgrade, Serbia—IPL 181
Biljana Abolmasov, Uroš Đurić, Jovan Popović, Marko Pejić, Mileva Samardžić Petrović, Nenad Brodić (2021)... (2017). Fig. 1 Locations of Umka landslide area, GNSS stations, AGROS network stations, Belgrade Main meteorological station, and Beljin Sava river water level (hydrological) station Results of Recent Monitoring Activities on Landslide … 227 UAV Imaging and Mapping Using of small Unmanned Aerial ...
... one time due to the technical reasons, but the concept remained the same. The main change occurred due to the relocation of the Umka object point station (GNSS1), 25 m to Southwest—from one house to neighboring house in 2014 (Fig. 1). This change caused loss of more than 9 months of permanent monitoring ...
... processing. Forward image overlap was at least 90% and overlap between flight path rows was around 60%. UAV was flying at height of 80 m above take-off station achieving average pixel size of 2.2 cm. Seven flights were performed in order to cover the entire landslide area (Fig. 3). “Zero” high resolution ...Biljana Abolmasov, Uroš Đurić, Jovan Popović, Marko Pejić, Mileva Samardžić Petrović, Nenad Brodić. "Results of Recent Monitoring Activities on Landslide Umka, Belgrade, Serbia—IPL 181" in Understanding and Reducing Landslide Disaster Risk. WLF 2020. ICL Contribution to Landslide Disaster Risk Reduction, Springer, Cham (2021). https://doi.org/10.1007/978-3-030-60196-6_14
-
Failure Estimation of the Majdanpek Open Pit East Face Based on Inverse Velocity Model
The Majdanpek open pit mine south district is currently active mining prospect of copper ore exploitation in eastern Serbia. Its depth is approaching the termination depth and occurrences of large-scale instabilities and global instability of the final pit slope is possible. These can generate catastrophic mass movement inside an area that encloses a regional road route and the Pek River bed which is channelled along the outer contour of the pit. The displacements that were noted in early 2023, in the ...Miloš Marjanović, Stefan Milanović, Nikola Simić, Lazar Kričak. "Failure Estimation of the Majdanpek Open Pit East Face Based on Inverse Velocity Model" in Regional Symposium on Landslides in the Adriatic-Balkan Region, Belgrade, 15-18th May 2024, University of Belgrade, Faculty of Mining and Geology (2024). https://doi.org/10.18485/resylab.2024.6.ch46
-
Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of “Podbracan”
... terms of mine surveying may be carried out by using total station of common accuracy, that setting out of direction angles and zenith distances may be carried out with only one position of scope (it is required that the total station be previously tested and recti�ed), and that while carrying ...
... in form of errors in setting out direction angles and error in setting out lengths of traverse legs. The environment enables the use of total station when setting out the designed mine chambers, i.e. of the mine traverse. When carrying out the a priori accuracy assessment, the standard deviation ...
... probability of 95% in this case, is . Setting out of the designed mine chambers within the vertical plane shall also be carried out by using total station and it is to be carried out at the same time as setting out within the horizontal plane. While making the a priori accuracy assessment, the standard ...Aleksandar Milutinović, Aleksandar Ganić, Thamer Rayes Diyab, Rade Tokalić, Meri Ganić. "Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of “Podbracan”" in Revista Escola de Minas, School of Mines Magazine, Sao paulo, Brasil : SciELO (2015)
-
Influence of geological substrate on runoff formation, a case study: small river catchments in southeastern Serbia of similar size and with comparable pluviographic regimes
Vesna Ristić Vakanjac, Veljko Marinović, Nikola Milovanović, Marina Čokorilo Ilić, Boris Vakanjac, Jugoslav Nikolić, Saša Bakrač (2022)We are witnessing climate change that is happening both, globally and, at the regionally - or local level. As a result of expected climate change in Southeast Europe, in the first place are the distributions of precipitation within the year (frequent extreme events are present) and then the increase in temperature, which already has a significant impact on evapotranspiration and runoff formed in a particular catchment area. In addition to climatic factors, the geological structure, i.e. the hydrogeological characteristics ...Vesna Ristić Vakanjac, Veljko Marinović, Nikola Milovanović, Marina Čokorilo Ilić, Boris Vakanjac, Jugoslav Nikolić, Saša Bakrač. "Influence of geological substrate on runoff formation, a case study: small river catchments in southeastern Serbia of similar size and with comparable pluviographic regimes" in XXII International Congress of the Carpathian Balkan Geological Association (CBGA), Sofia : Bulgarian Academy of Sciences (2022)
-
Spatial and temporal variability of precipitation in Serbia for the period 1961-2020
Boško Milanović, Phillip Schuster, Milan Radovanović, Vesna Ristić Vakanjac, Shristoph Schneider (2017)У овом раду анализиране су месечне, сезонске и годишње суме падавина у Србији за период 1961–2010. Географска ширина, дужина и надморска висина 421 падавинске станице и карактеристике терена у њиховом блиском окружењу (нагиб и аспект терена у радијусу од 10 км око станице) коришћене су за развој регресионог модела на основу којег је прорачуната просторна расподела падавина. Приказан је просторни распоред годишњих, јунских (максималне вредности за скоро све станице) и фебруарских (минималне вредности за скоро све станице) падавина. Годишње ...Boško Milanović, Phillip Schuster, Milan Radovanović, Vesna Ristić Vakanjac, Shristoph Schneider. "Spatial and temporal variability of precipitation in Serbia for the period 1961-2020" in Theoretical and Applied Climatology (2017). https://doi.org/10.1007/s0070-017-2118-5
-
Permanent GNSS monitoring of landslide Umka
Mileva Samardžić Petrović, Jovan Popović, Uroš Đurić, Biljana Abolmasov, Marko Pejić, Miloš Marjanović (2020)Клизиште Умка је једно од највећих насељених активних клизишта у Србији. Активност клизишта Умка се прати већ више од 85 година, различитим геотехничким и геодетским техникама. Од 2010. године, активност kлизишта се континуирано прати у реалном времену аутоматизованим перманентним системом за праћење базираним на Глобалним навигационим сателитским системима (ГНСС). Поред тога, од 2018. године активност клизишта се додатно прати кинематичким ГНСС одређивањем положаја скупа карактеристичних тачака као и применом UAV фотограметрије. Главни циљ овог рада је приказ резултата опажања три ...... geodetic procedures were applied during last 10 years: 1. Automated permanent monitoring of the position change for a single permanent GNSS station in the landslide area in relation to the three-surrounding stable GNSS permanent stations of the national GNSS service, AGROS; 2. Monitoring of ...
... with experimental standard deviation σE = 3 mm, σN = 4 mm, σh = 11 mm, for all three epochs. The real- time kinematic solutions from the base station S4 were intended to assure that postprocesed kinematic solution exists. After obtaining the coordinates for each landslide point in an individual ...
... important role in designing of the technology for landslide activity monitoring and results interpretation. The usage of the single permanent GNSS station provides information on landslide activity at any time moment and defines the spacing between the measuring epochs for the other procedures. GNSS ...Mileva Samardžić Petrović, Jovan Popović, Uroš Đurić, Biljana Abolmasov, Marko Pejić, Miloš Marjanović. "Permanent GNSS monitoring of landslide Umka" in International Conference on Contemporary Theory and Practice in Construction XIV Stepgrad, University of Banja Luka, Faculty of Architecture, Civil Engineering and Geodesy (2020). https://doi.org/10.7251/STP2014091S