Претрага
225 items
-
INVENTS: A Hybrid Mine Ventilation Planning and Design System
Ventilation system analysis is a complex process based on the calculation and analysis of numerous parameters. These problems can be successfully solved by the SimVent numerical package, but a full understanding and use of the obtained results require the involvement of an experienced specialist in the ventilation field. The solution was found in the creation of a hybrid system INVENTS, whose knowledge base represents a formalization of the expert knowledge in the mine ventilation field. In this paper we ...... 2023-10-14 03:23:37 INVENTS: A Hybrid Mine Ventilation Planning and Design System Lilić Nikola, Stanković Ranka, Obradović Ivan Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] INVENTS: A Hybrid Mine Ventilation Planning and Design System | Lilić Nikola, Stanković ...
... for deposit exploitation. System planing is an introduction to the mine design process. In the planning process key relations are defined that have to be taken into account in the mine design phase. The initial step in the mine ventilation planing and design process is the establishment of a basic ...
... "An Integrated Environment Simulation System for Mine Ventilation Management", XXIII International Symposium APCOM, Montreal, 327-334, Vol.II. [9] Ramani,R.V., Prasad,K.V.K. and Swaminathan,M., "Implementation of KBS for Mine Ventilation Planning and Design", XXII International Symposium APCOM , ...Lilić Nikola, Stanković Ranka, Obradović Ivan. "INVENTS: A Hybrid Mine Ventilation Planning and Design System" in Proceedings of International Scientific Conference of FME Session 4: Automation Control and Applied Informatics , Hong Kong : iConcept Press (2013)
-
Environmental Noise Impact Assessment for Large-Scale Surface Mining Operations in Serbia
Noise emissions are a significant environmental impact caused by the mining industry in all technological phases of surface mining, mineral processing, and waste disposal. This paper presents the role of noise impact assessment and control in large-scale surface mining operations. Mine planning develops the model of mining operations, ore excavation, and waste dumping scheduling and processing rates, including spatial distribution of mining activities. Such a level of mine planning requires an environmental impact assessment study. This can be achieved ...Uros Pantelic, Petar Lilic, Aleksandar Cvjetic, Nikola Lilic. "Environmental Noise Impact Assessment for Large-Scale Surface Mining Operations in Serbia" in Sustainability, MDPI AG (2023). https://doi.org/10.3390/su15031798
-
Improving efficiency of thermal power plants through mine coal quality planning and control
Главни циљ контроле квалитета угља у рудницима лигнита је снабдевање термоелектрана угљем чији квалитет мора да се креће унутар одређених квалитативних ограничења. Карактеристике угља могу да утичу на ефикасност, поузданост и расположивост како котла тако и јединица за контролу емисије. У овом раду аутори су презентовали интегрисану симулацију рударског процеса као нови приступ у истраживању променљивости калоричне вредности угља приликом експлоатације комплексног лежишта лигнита. Резултати таквог приступа омогућавају драгоцен увид у перформансе континуалног рударског система у смислу контроле променљивости ...Mirjana Banković, Dejan Stevanović, Milica Pešić, Aleksandra Tomašević, Ljiljana Kolonja. "Improving efficiency of thermal power plants through mine coal quality planning and control" in Thermal Science, Vinča Institute of Nuclear Sciences (2018). https://doi.org/10.2298/TSCI170605209B
-
Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning
The process of creating a geological block model as the basis for a further detailed design and planning of mining operations is a very responsible task. Errors made during this initial process are transferred to all other phases of the mining project. Certainly, one of the most important decisions for the modelling process is the choice of the appropriate size of the blocks that form the model itself. The determination of the optimal block size is not a simple ...dimenzije minibloka, višekriterijumska analiza, AHP, modeliranje ležišta, planiranje na površinskim kopovimaPetar Marković, Dejan Stevanović, Milica Pešić Georgiadis, Mirjana Banković. "Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning" in Underground Mining Engineering, Univerzitet u Beogradu, Rudarsko-geološki fakultet (2021)
-
Hidrodinamički proračun zaštite površinskog kopa Drmno od podzemnih voda u periodu 2018-2022. godina
Površinski kop lignita Drmno nalazi se u blizini velikih reka (Dunav i Mlava), zbog čega eksploatacija otkrivke i lignita u velikoj meri zavisi od sistema zaštite od podzemnih voda. Ukoliko je sistem zaštite od podzemnih voda dobro isplaniran, a njegov kapacitet dobro proračunat, onda će se eksploatacija obavljati u suvoj sredini, što podrazumeva sigurnu proizvodnju otkrivke i lignita. U današnje vreme uz primenu adekvatnih softvera olakšano je kvalitetno planiranje i proračunavanje sistema za zaštitu površinskih kopova od podzemnih voda. ...Dušan Polomčić, Tomislav Šubaranović, Zoran Stojićević. "Hidrodinamički proračun zaštite površinskog kopa Drmno od podzemnih voda u periodu 2018-2022. godina" in Zbornik apstrakata sa 9. Međunarodne konferencije Ugalj, Zlatibor, 2019., Jugoslovenski komitet za površinsku eksploataciju (2019)
-
Effectiveness Analysis of Different Bucket-wheel Excavators
Coal production in open-pit lignite mines in the Republic of Serbia is performed with continuous work systems. In addition to coal production, the same systems are used for the exploitation of large quantities of overburden. According to the reliability concept, continuous systems are in linear connection. If the failure occurs in one part of the system, that will produce a downtime of the entire system. The initial and most important factor of continuous systems is the bucket-wheel excavator. It ...Stevan Đenadić, Predrag Jovančić, Dragan Ignjatović, Miloš Tanasijević, Filip Miletić. "Effectiveness Analysis of Different Bucket-wheel Excavators" in 8th International Conference Mining and Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021)
-
Optimizacija i planiranje površinskih kopova stohastičkim modelima
Dejan R. Stevanović (2015-05-29)Savremeno rudarstvo izloženo je stalnom trendu pogoršanja uslova poslovanja.Mogućnost ostvarenja ekonomskih i drugih ciljeva rudarskog projektakompromitovana je stalnim pogoršanjem kvaliteta ležišta na kojima se vršieksploatacija, kao i značajnoj dozi neizvesnosti povezane sa geološkim,ekonomskim i tehničkim parametrima proizvodnje. U ovako kompleksnimuslovima poslovanja, matematički modeli sposobni da odgovore značajnimizazovima, odnosno ponude optimalna rešenja kojima se garantuje maksimalnoispunjenje projektovanih ciljeva, nameću se kao neophodnost.Trenutni, konvencionalni pristup optimizaciji i planiranju površinskih kopovazasniva se na algoritmima, razvijenim sredinom prošlog veka čije je opšteobeležje deterministički ...površinski kop, planiranje, optimizacija, stohastički modeli, kontrola kvaliteta uglja, neizvesnost.... modelima;Open pit mine optimization and planning with stochastic models Dejan R. Stevanović Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Optimizacija i planiranje površinskih kopova stohastičkim modelima;Open pit mine optimization and planning with stochastic ...
... 2008, Long-term open pit mine production planning: a review of models and algorithms, International Journal of Mining, Reclamation and Environment, Vol. 22, No. 1, str. 3-35 Pana, M. T, Carlson, T.R, 1966, A Description of Computer Technique Used in Mine Planning of the Utah Mine of Kennecott Copper Corp ...
... the Institute of Mining and Metallurgy, Section A), Vol. 103, str.21-26. Dimitrakopoulos R., 2011, Strategic mine planning under uncertainty, stochastic optimization for strategic mine planning: a decade of developments, Journal of Mining Science, Vol. 47, str. 138-150 Dimitrakopoulos R., Griffin W ...Dejan R. Stevanović. "Optimizacija i planiranje površinskih kopova stohastičkim modelima" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-05-29)
-
Development of an integrated model for open-pit-mine discontinuous haulage system optimization
Miodrag Čelebić, Dragoljub Bajić, Sanja Bajić, Mirjana Banković, Duško Torbica, Aleksej Milošević , Dejan Stevanović (2024)Miodrag Čelebić, Dragoljub Bajić, Sanja Bajić, Mirjana Banković, Duško Torbica, Aleksej Milošević , Dejan Stevanović . "Development of an integrated model for open-pit-mine discontinuous haulage system optimization" in Sustainability, MDPI (2024). https://doi.org/10.3390/su16083156
-
Approach to operational mine planning: Case study Tamnava West
... 03:38:23 Approach to operational mine planning: Case study Tamnava West Dejan Stevanović, Mirjana Banković, Milica Pešić Georgiadis, Ranka Stanković Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Approach to operational mine planning: Case study Tamnava West | Dejan ...
... software for integrated geology and mine planning solutions. It is comprehensive tool specialized for coal and other stratified deposits, such as phosphate, zinc, bauxite, iron ore, and platinum. Minex covers almost every part of geological modeling and mine planning process. It provides a fast ...
... Successful operational mine planning is almost impossible without use of modern software packages. In this paper, Minex was the software tool used for geological modeling and operational planning of coal production. The advantages of proper operational planning are presented on the example ...Dejan Stevanović, Mirjana Banković, Milica Pešić Georgiadis, Ranka Stanković. "Approach to operational mine planning: Case study Tamnava West" in Tehnika, Beograd : Savez inženjera i tehničara Srbije (2014). https://doi.org/10.5937/tehnika1406952S
-
Faktori uticaja na izbor optimalnog sistema odbrane od podzemnih voda kod površinskih kopova
Dragoljub Bajić, Dušan Polomčić (2015)Dragoljub Bajić, Dušan Polomčić. "Faktori uticaja na izbor optimalnog sistema odbrane od podzemnih voda kod površinskih kopova" in VII Međunarodna konferencija Ugalj 2015, Zlatibor 14-17. oktobar 2015., Beograd : Jugoslovenski komitet za površinsku eksploataciju (2015)
-
Strategic Environmental Assessment and the precautionary principle in the spatial planning of wind farms – European experience in Serbia
Spatial determination planning is at an initial and very sensitive step in the development of wind farms. On one hand, it is important to maximize the potential of wind in a particular area, and on the other hand, it is important to achieve environmental protection (including the human population and natural heritage) in the same space at the same time. With this in mind, it is important to balance all the requirements that are relevant for reaching the optimal ...Boško Josimović, Aleksandar Cvjetić, Danilo Furundžić. "Strategic Environmental Assessment and the precautionary principle in the spatial planning of wind farms – European experience in Serbia" in Renewable and Sustainable Energy Reviews, Elsevier BV (2021). https://doi.org/10.1016/j.rser.2020.110459
-
Application of stochastic models for mine planning and coal quality control
... stochastic models for mine planning and coal quality control Dejan Stevanović, Božo Kolonja, Ranka Stanković, Dinko Knežević, Mirjana Banković Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Application of stochastic models for mine planning and coal quality control ...
... during the planning period. Mine planning is divided into four categories: long-term, medium-term, short-term, and operational planning [10]. The primary objective of long-term mine planning is to develop mining sequences which will define the economic limit of the mine. The medium-term planning is concerned ...
... referring to the dispersion of the grades during operational mine planning or stocking process, since the dispersion characteris- tics of the original data are maintained. Coal quality control at the mine planning phase Mine planning is based on reliable estimates of coal grades of future mining ...Dejan Stevanović, Božo Kolonja, Ranka Stanković, Dinko Knežević, Mirjana Banković. "Application of stochastic models for mine planning and coal quality control" in Thermal Science, Belgrade : Vinča Institute of Nuclear Sciences (2014). https://doi.org/10.2298/TSCI130201031S
-
Integrated energy planning approach for accelerating energy transition of households
The success of energy transition planning depends on several influential and variable factors that need to be considered and tracked in modeling to support policymakers. Expert-based energy models are mainly developed following the assumptions of experts and, in most cases, a limited number of stakeholders. This top-down modeling approach will provide satisfactory results in centrally managed energy sectors (electricity generation and distribution, district heating, etc.), where further decisions could be projected relatively precisely. However, the same approach will not ...Energetsko planiranje, Integrisano energetsko modeliranje, Energetska tranzicija, Domaćinstva, Individualno grejanje, LEAPBoban Pavlović, Marija Živković, Dejan Ivezić. "Integrated energy planning approach for accelerating energy transition of households" in Energy Reports, Elsevier BV (2023). https://doi.org/10.1016/j.egyr.2023.11.016
-
Rudničke vode olovo-cinkovih ležišta u rudnom polju „Blagodat“ u jugoistočnoj Srbiji
Nebojša Atanacković, Veselin Dragišić, Vladimir Živanović, Ivana Cvejić, Saša Stojadinović, Ivana Jocić (2022)Rudno polje Blagodat sa više ležišta i pojava olovo-cinkovih ruda nalazi se u krajnjem jugoistočnom delu Srbije, blizu granica sa Bugarskom i Severnom Makedonijom. Eksploatacija ovog resursa vrši se podzemno u okviru rudnika Grot, ranije Blagodat. Prilivi podzemnih (rudničkih) voda u jamske radove rudnika Grot su visoki i iznose oko 130 l/s (septembar 2019), što ga trenutno svrstava u najovodnjenije rudnike sa podzemnom eksploatacijom u Srbiji. Nezavisno od njih, iz obližnjeg potkopa P-1 u ležištu Kula, ističe još 25 ...Nebojša Atanacković, Veselin Dragišić, Vladimir Živanović, Ivana Cvejić, Saša Stojadinović, Ivana Jocić. "Rudničke vode olovo-cinkovih ležišta u rudnom polju „Blagodat“ u jugoistočnoj Srbiji" in Zbornik radova XVI srpskog Simpozijum o hidrogeologiji sa međunarodnim učešćem, Univerzitet u Beograd, Rudarsko-geološki fakultet (2022)
-
Sepiolite – a by-product of exploitation as a potential raw material in Serbian industry
This paper gives a brief overview of the sepiolite deposits, the basic properties, and the possibilities of using this mineral. Particular attention is paid to sepiolites from domestic production, especially the use of sepiolites suitable for the development of small businesses and technologies, with a focus on environmental protection. Aim of this paper is to point out importance of this mineral and to draw attention to the use of domestic raw materials. With appropriate mechanical and chemical pretreatments, sepiolite is ...Radmila Gaćina, Katarina Urošević, Jelena Zakonović. "Sepiolite – a by-product of exploitation as a potential raw material in Serbian industry" in Underground mining engineering , Belgrade : University of Belgrade - Faculty of Mining and Geology (2019). https://doi.org/10.5937/podrad1935081G
-
Ventex: an expert system for mine ventilation systems analysis
roblems relating to mine ventilation systems analysis are usually of a very complex nature. They involve the estimation of numerous interdependent parameters pertaining to the network status, ventilation status, ventilation system stability, air current losses, climate conditions, gas state, fire risk and dangerous dust pollution risk. The solution to these problems relies, to a great extent, on numerical methods. With the development of computer technology these methods were incorporated as numerical routes in software packages, such as the mine ...Nikola Lilić, Ranka Stanković, Ivan Obradović. "Ventex: an expert system for mine ventilation systems analysis" in Mining Technology, United Kingdom (1997)
-
Strategic Environmental Assessment in the Application of Preventive Protection for Wind Farm Noise—Case Study: Maestrale Ring Wind Farm
Determining the spatial position of wind turbines is the initial and most important phase in the development of a wind farm project. In this sensitive phase, all potential problems that may arise in the later stages of project development should be prevented by means of spatial and urban planning instruments. This makes it possible to achieve maximum use of the potential of wind in a particular space and, thus, fulfil the technical and economic requirements of the project while ...Energija,energetski inženjering i elektroenergetska tehnologija,obnovljivi izvori energije, održivost i životna sredina,električni i elektronski inženjering,kontrola i optimizacija,inženjering... the earliest phase of wind farm planning and, thus, fully apply the concept of pre- ventive environmental protection [12]. In other words, due to the specifics of planning wind farm projects, it is both possible and desirable to have a combined technical and planning approach in SEA, i.e., the application ...
... not usual for most planning documents, since they have more gen- eral planning solutions and a lack of technical details about their projects, preventing the quantification of results through different software models. Due to the knowledge of certain technical details in planning wind farms, it is ...
... is essential, even at the earliest planning and development stage of a wind farm project, for the requirements that are important for optimal spatial solutions to be balanced. In this process, strategic environmental assessment (SEA) is a support to the planning process and an invaluable instrument ...Boško D. Josimović, Aleksandar Cvjetić, Božidar Manić. "Strategic Environmental Assessment in the Application of Preventive Protection for Wind Farm Noise—Case Study: Maestrale Ring Wind Farm" in Energies, MDPI AG (2021). https://doi.org/10.3390/en14196174
-
Процјена хазарда и ризика од клизишта за различите нивое просторног планирања у Републици Српској, БиХ
Цвјетко С. Сандић (2022)Територија Републике Српске је у посљедних десетак година веома угрожена активирањем нових и реактивирањем старих клизишта. Она својим дјеловањем наносе огромне материјалне штете, па и људске жртве, те је неопходно озбиљније третирање и дјеловање у борби са овим природним хазардом. Чест проблем јесте одговорност, тј. надлежност институција из ове области и недостатак у законској регулативи која готово никако или само површно обрађује област хазарда и ризика од клизишта. Усљед непостојања праксе и усвојених методологија које су у примјени у свијету, циљ ...Цвјетко С. Сандић. Процјена хазарда и ризика од клизишта за различите нивое просторног планирања у Републици Српској, БиХ, Београд : [Ц. Сандић], 2022
-
A Knowledge-Based Approach to Mine Ventilation Planning in Yugoslav Mining Practice
Ventilation system analysis is a complex process based on the calculation and analysis of numerous parameters. These problems can be successfully solved by the SimVent numerical package, but a full understanding and use of the obtained results require the involvement of an experienced specialist in the ventilation field. The solution was found in the creation of a hybrid system INVENTS, whose knowledge base represents a formalization of the expert knowledge in the mine ventilation field. In this paper, we ...... Knowledge-Based Approach to Mine Ventilation Planning in Yugoslav Mining Practice Nikola Lilić, Ivan Obradović, Ranka Stanković Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] A Knowledge-Based Approach to Mine Ventilation Planning in Yugoslav Mining Practice ...
... software that are at the disposition of mine engineers. Software packages for mine ventilation simulation are now playing a key role in the process of mine ventilation planning and design.7–10 In this paper, we propose a six-step approach to the solution of mine ventilation design problem, the design ...
... 295–302. 6. N. Lilic, R. Stanković and I. Obradović, Mine ventilation system planning using ge- netic algorithms, Proc. 6th Int. Symp. Mine Planning and Equipment Selection, 1997. 7. N. Lilić and I. Obradović, Computer-aided analysis of mine ventilation for emergency plans, 1st Regional APCOM SYMP ...Nikola Lilić, Ivan Obradović, Ranka Stanković. "A Knowledge-Based Approach to Mine Ventilation Planning in Yugoslav Mining Practice" in Mineral Resources Engineering 11 no. 4, Imperial College Press (2002): 361-382. https://doi.org/10.1142/S0950609802001014
-
Long-term planning methodology for improving wood biomass utilization
The insufficiently developed forest management system is often followed by undeveloped forest resources supply chain and insufficient institutional support. These cause inefficient usage of fuel-wood as well as huge amounts of unused forest residues. In order to achieve optimal and long-term sustainable utilisation of biomass, an original methodology based on the interaction of mathematical optimization and backcasting approach has been developed. Mathematical optimization is used for both generation and consideration of techno-economic parameters of the forest biomass supply chain. ...Vladimir Vukašinović, Dušan Gordić, Marija Živković, Davor Koncalović, Dubravka Živković. "Long-term planning methodology for improving wood biomass utilization" in Energy, Elsevier BV (2019). https://doi.org/10.1016/j.energy.2019.03.105