Претрага
20 items
-
Faktori uticaja na izbor optimalnog sistema odbrane od podzemnih voda kod površinskih kopova
Dragoljub Bajić, Dušan Polomčić (2015)Dragoljub Bajić, Dušan Polomčić. "Faktori uticaja na izbor optimalnog sistema odbrane od podzemnih voda kod površinskih kopova" in VII Međunarodna konferencija Ugalj 2015, Zlatibor 14-17. oktobar 2015., Beograd : Jugoslovenski komitet za površinsku eksploataciju (2015)
-
Fragmentation Size Prediction of Blasted Material Using a Specialized Software for Drilling and Blasting
Stefan Milanović, Nikola Simić, Lazar Kričak, Milanka Negovanović, Nikola Đokić, Miljan Gomilanović (2024)Design and optimizing the drilling and blasting parameters, should fill the requirements for the capacity, fragmentation size, and technical characteristics of loading and transport equipment, and enable a safe work at the open pit. Besides mentioned, it also achieves the minimal impact on the environment of the open pit and decreases the negative effects on the environment, especially in the blast vibration and flyrock. To obtain the best possible blasting effects and consider all the factors, a specialized software is ...Stefan Milanović, Nikola Simić, Lazar Kričak, Milanka Negovanović, Nikola Đokić, Miljan Gomilanović. "Fragmentation Size Prediction of Blasted Material Using a Specialized Software for Drilling and Blasting" in The 55th International October Conference on Mining and Metallurgy, Mining and Metallurgy Institute Bor (2024). https://doi.org/10.5937/IOC24077M
-
The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers
One of the most important prerequisites for the successful operation of the open-cast lignite mine is to carry out all the auxiliary works timely with the necessary quality. The most important and most commonly used auxiliary machines are bulldozers. Engaging time of bulldozers use is in direct relation with the coefficients of the time and capacity utilization of the continuous system for the excavation of coal and tailings, which indicates their importance. More than 100 bulldozers have been hired ...... 04:30:52 The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers Dragan Ignjatović, Predrag Jovančić, Stevan Đenadić, Ivan Janković, Ivica Ristović Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] The optimization of auxiliary ...
... available at: www.dr.rgf.bg.ac.rs 7% International Symposium MINING AND ENVIRONMENTAL PROTECTION 25 - 28 September 2019, Vrdnik, Serbia THE OPTIMIZATION OF AUXILIARY MACHINERY IN OPEN-CAST LIGNITE MINES: A CASE STUDY OF BULLDOZERS Dragan Ignjatović!, Predrag Jovančić!, Stevan Đenadić!, Ivan Janković ...
... defines the optimal bulldozer replacement period within the life cycle of that machihe. Keywords: Open-cast coal mine, auxiliary works, bulldozers, optimization, availabilifty. 1. INTRODUCTION Dozers are most common auxiliary machines at open-cast coal mines, both by type and the scope of tasks these ...Dragan Ignjatović, Predrag Jovančić, Stevan Đenadić, Ivan Janković, Ivica Ristović. "The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers" in 7th International Symposium Mining and Environmental Protection, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2019)
-
Novi model za postizanje optimalne proizvodnje na naftnom polju Amal
Elnori Elmabrouk Ali Elhaddad (2015-04-16)Doktorskom disertacijom analizirani su i proučavani problemi proizvodnje nafte iprimenjene metode za njihovo rešavanje na naftnom polju Amal. Ukratko jeprikazana proizvodnje nafte u Libiji, njene karakteristike i rezerve, da bi se videoznačaj ovog naftnog polja.Utvrđeno je da su na naftnom polju Amal ključni problemi koji prate procesproizvodnje taloženje parafina, pojava slojnog peska, neefikasan rad gasliftsistema, neefikasna desalinizacija nafte i ekološki problemi. Proizvodniproblemi, pojedinačno i više njih zajedno, na nekim bušotinama uzrokovali susmanjenje proizvodnje nafte od 40 do 75%. Zbog ...... reflected in the solving of a number of practical problems in oil production optimization process and the modeling of a new and more efficient oil exploitation technology. Key words: oil, production, optimization, Amal, Libya. Scientific field: Mining engineering ...
... Filtration and External Cake Build-up, Delft University of Technology, 159. Fariborz R., Ehsan K., Hanieh R. (2010) Oil Field Optimization Based on Gas Lift Optimization, 20th European Symposium on Computer Aided Process Engineering – ESCAPE20. Feiyue W., Hong L. (2012) Study on the divided-wall ...
... L., Sui W., Wen H. (2012) Optimization of proppant size for frac pack completion using a new equipment, Journal of Petroleum Science and Engineering, Volumes 96–97, 1-9. Gutierrez F., Hallquist A., Shippen M., Rashid K., (2007). “A new approach to gas lift optimization using an integrated asset ...Elnori Elmabrouk Ali Elhaddad. "Novi model za postizanje optimalne proizvodnje na naftnom polju Amal" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-04-16)
-
Estimating hydraulic parameters for the complex hydrodynamic models
Hydrodynamic models have usually been calibrated manually, by trial-and-error, with different values of hydraulic parameters and hydraulic characteristics of boundary conditions. This method of calibration and estimation of hydraulic parameters requires an extensive knowledge and experience of experts, but whether the resulting solution includes an optimal set of parameters still remains an open question. An optimization method founded upon the Gauss-Marquardt-Levenberg algorithm, along with PEST software based on that algorithm, introduces automation of model calibration with regularization, which substantially ...Dušan Polomčić, Dragoljub Bajić, Jelena Ratković, Bojan Hajdin. "Estimating hydraulic parameters for the complex hydrodynamic models" in Mining and Metallurgy Engineering Bor, Centre for Evaluation in Education and Science (CEON/CEES) (2018). https://doi.org/10.5937/mmeb1704029P
-
Overwiew of In-Pit Crushing & Conveying Technology in Open Pit Mines
The conditions under which contemporary surface mining operations is carried out obviously becoming increasingly complex. In such complex conditions, the optimization of haulage systems as the technological phase with the largest share in the total operating costs, is very important from the aspect of achieving profitability of the mining project. In a large number of cases, the application of traditional haulage systems with trucks (as the most dominant type of haulage in open pit mines) does not lead to ...Ali Nasirinezhad, Dejan Stevanović, Dragan Ignjatović, Petar Marković. "Overwiew of In-Pit Crushing & Conveying Technology in Open Pit Mines" in 8th International Conference MIining And Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021)
-
Gas-lift wells optimization at the oil field "K"
Dušan Danilović, Marija Ilić, Miroslav Crnogorac, Lola Tomić. "Gas-lift wells optimization at the oil field "K"" in Podzemni radovi, University of Belgrade - Faculty of Mining and Geology (2022). https://doi.org/10.5937/podrad2241031D
-
Mitigating hydrate formation in onshore gas wells: A case study on optimization techniques and prevention
Gas wells, particularly those situated onshore, play a vital role in the global energy sector by supplying a significant portion of natural gas. However, operational challenges, notably gas hydrate formation, pose substantial issues, leading to complications such as flowline blockages and unexpected well shutdowns. Gas hydrates, crystalline structures resembling ice, ...Gas Well, Gas Hydrate Formation, Well Modeling, Well Performance Optimization, Choke Position Adjustments, Methanol InjectionMilica Ješić, Bojan Martinović, Stefan Stančić, Miroslav Crnogorac, Dušan Danilović. "Mitigating hydrate formation in onshore gas wells: A case study on optimization techniques and prevention" in Underground Mining Engineering, Beograd : Rudarsko-geološki fakultet (2023)
-
Komparativna analiza završnih kontura površinskog kopa Drmno
Definisanje optimalne završne konture površinskog kopa od suštinskog je značaja za ostvarivanje strateških ciljeva u razvoju rudarskih projekata. Savremeni programski paketi i metode za optimizaciju granica kopa, zasnivaju se na pronalasku završne konture koja obezbeđuje maksimalan profit. U slučaju površinskih kopova uglja, kod kojih osim profita postoji i čitav niz dodatnih kriterijuma i strateških ciljeva, princip optimizacije granica prema profitu, najčešće nije u potpunosti primenjiv. Iz rog razloga za uspešno definisanje granica površinskih kopova, neophodno je sagledati čitavu lepezu ...Dejan Stevanović, Dragan Ignjatović, Tomislav Šubaranović, Mirjana Banković, Petar Marković. "Komparativna analiza završnih kontura površinskog kopa Drmno" in XV Međunarodna konferencija OMC 2022, Zlatibor, 12-15. oktobar 2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Метода променљивих околина за решавање проблема p-центра са поузданом мрежом
У овом раду је разматран проблем p-центра са поузданом мрежом (енгл. Reliable p-center facility location problem - RpCFLP). Решавање проблема подразумева иницијално успостављање p ресурса и алокације корисника, као и накнадну реалокацију корисника у складу са новонасталим сценаријима који садрже информације о онеспособљеним ресурсима и осталим измењеним улазним подацима. За решавање посматраног проблема предложена је метахеуристика заснована на итеративној варијанти основне методе променљивих околина (енгл. Iterated basic variable neighborhood search - IBVNS). Резултати тестирања предложене метахеуристике указују на њену ...Јована Рађеновић, Стефан Мишковић, Оливера Станчић. "Метода променљивих околина за решавање проблема p-центра са поузданом мрежом" in 50. Међународни симпозијум о операционим истраживањима SYM-OP-IS, Тара, Србија, 18-21.9.2023, Београд : Медија центар „Одбрана” (2023)
-
Optimization and Analysis of Drilling and Blasting Parameters Using O-Pitblast Software
The development of modern technologies has enabled the application of specialized softwares in the field of mining through various segments and processes, including in works related to drilling and blasting. The application of specialized software for drilling and blasting with the use of modern technologies such as photogrammetry enabled more accurate data from the field for later processing. By processing data and creating a 3D model of the terrain for drilling and blasting works, it can obtain precise data, ...Stefan Milanović, Nikola Simić, Lazar Kričak, Milanka Negovanović, Nikola Đokić. "Optimization and Analysis of Drilling and Blasting Parameters Using O-Pitblast Software" in Podzemni radovi, Beograd : Rudarsko-geološki fakultet (2024)
-
Probabilistic analysis of anisotropic rock slope with reinforcement measures
During the construction of E75 highway through Grdelica gorge in Serbia, a major failure occurred in the zone of reinforced rock slope. Excavation was performed in highly anisotropic Paleozoic schist rock formation. The reinforcement consisted of the two rows of micropile wall with pre-stressed anchors. Forces in anchors were monitored with load cells while benchmarks were installed for superficial displacement measurements. The aim of the study is to investigate possible causes of instability considering different probability distributions of the ...Zoran Berisavljević, Dušan Berisavljević, Miloš Marjanović, Svetlana Melentijević. "Probabilistic analysis of anisotropic rock slope with reinforcement measures" in Geomechanics and Engineering (2023). https://doi.org/10.12989/gae.2023.34.3.285
-
Optimizacija faznog razvoja Površinskog kopa Ciganuša – Škorac u cilju definisanja dugoročne dinamike eksploatcije
Definisanje dugoročne dinamike razvoja rudarskih radova koja je u potpunosti usaglašena sa strateškim ciljevima Investitora, veoma je zahtevan zadatak, koji vrlo često podrazumeva veliki broj ograničenja. Adekvatno definisana dinamika razvoja rudarskih radova treba da obezbedi dugoročne zahteve u pogledu kapaciteta, kvaliteta i raspodele resursa neophodnih za ispunjavanje strateških ciljeva, koji se po pravilu svode na ostvarenje maksimalnog profita. Uspešno definisanje dinamike eksploatacije (posebno kod metaličnih ležišta) u najvećoj meri zavisi od optimizacije faznog razvoja površinskog kopa, odnosno od pravilnog ...Dejan Stevanović, Petar Marković, Mirjana Banković, Milan Živković. "Optimizacija faznog razvoja Površinskog kopa Ciganuša – Škorac u cilju definisanja dugoročne dinamike eksploatcije" in XV Međunarodna konferencija OMC 2022, Zlatibor, 12-15. oktobar 2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Mine ventilation system planning using genetic algorithms
The most common problem in contemporary mining practice related to the planning and analysis of ventilation systems is the optimization of partially regulated air distribution in mine ventilation networks. This paper presents a two step optimization procedure for partly regulated air distribution in mine ventilation networks. The first step is the determination of air distribution in all branches using the well known Hardy-Cross method. In the second step the distribution and parameters of air flow regulators with minimum engaged ...coal, lignite, and peat; ventilation systems; coal mining; underground mining; ventilation; mathematical models; design; air flow; optimization; calculation methodsNikola Lilić, Ranka Stanković, Ivan Obradović. "Mine ventilation system planning using genetic algorithms" in 6. international symposium on mine planning and equipment selection, Ostrava (Czech Republic), 3-6 Sep 1997, A.A. Balkema, Rotterdam (Netherlands) (1997)
-
Development of the Cost-Based Model for Monitoring the Lifetime of the Earth Moving Machines
This paper presents the model for the identification of reference points on the lifetime curve of engineering systems. This curve commonly represents the increase and decline of failure in relation to time. A direct correlation between failure rate and costs is assumed in this paper, therefore, statistical and empirical analysis of costs provided reference points. This approach is used for positioning stages of the engineering system’s lifetime with a minimal number of failures and costs, regardless of whether these ...Electrical and Electronic Engineering,Industrial and Manufacturing Engineering, Control and Optimization, Mechanical Engineering, Computer Science (miscellaneous), Control and Systems EngineeringUgljesa Bugarić, Milos Tanasijević, Stevan Djenadić, Dragan Ignjatović, Ivan Janković. "Development of the Cost-Based Model for Monitoring the Lifetime of the Earth Moving Machines" in Machines, MDPI AG (2022). https://doi.org/10.3390/machines10110995
-
Развој хибридног модела за оптиматизацију завршне контуре одлагалишта у површинској експлоатацији лежишта минералних сировина
Aлександар Додеровић (2024)Површинска експлоатација минералних сировина захтијева претходно откопавање значајних( милионских) количина јаловине, које је неопходно транспортовати до локације на којој ће сеона трајно одложити. Традиционални приступ избора локације и дизајна одлагалишта се карактерише парцијалним приступом, заснованом на анализи неколико водећих критеријума као и на личном искуству инжењера, често занемарујући синергетски ефекат осталих утицајних фактора Технолошке операције које се односе на манипулацију јаловином, међу којима предњачи транспорт, генеришу највећи дио трошкова у површинској експлоатацији. Такође, цјелокупан процес експлоатације додатно је ограничен ...оптимизације завршне контуре одлагалишта, хибридни модел, површинска експлоатација, генетски алгоритамAлександар Додеровић. Развој хибридног модела за оптиматизацију завршне контуре одлагалишта у површинској експлоатацији лежишта минералних сировина, Београд : [А. Додеровић], 2024
-
Optimizacija i planiranje površinskih kopova stohastičkim modelima
Dejan R. Stevanović (2015-05-29)Savremeno rudarstvo izloženo je stalnom trendu pogoršanja uslova poslovanja.Mogućnost ostvarenja ekonomskih i drugih ciljeva rudarskog projektakompromitovana je stalnim pogoršanjem kvaliteta ležišta na kojima se vršieksploatacija, kao i značajnoj dozi neizvesnosti povezane sa geološkim,ekonomskim i tehničkim parametrima proizvodnje. U ovako kompleksnimuslovima poslovanja, matematički modeli sposobni da odgovore značajnimizazovima, odnosno ponude optimalna rešenja kojima se garantuje maksimalnoispunjenje projektovanih ciljeva, nameću se kao neophodnost.Trenutni, konvencionalni pristup optimizaciji i planiranju površinskih kopovazasniva se na algoritmima, razvijenim sredinom prošlog veka čije je opšteobeležje deterministički ...površinski kop, planiranje, optimizacija, stohastički modeli, kontrola kvaliteta uglja, neizvesnost.... modelima;Open pit mine optimization and planning with stochastic models Dejan R. Stevanović Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Optimizacija i planiranje površinskih kopova stohastičkim modelima;Open pit mine optimization and planning with stochastic ...
... hybrid type. It has stochastic (Monte Carlo method) and deterministic component and treats the problem of optimization of open pit boundaries. Keywords: open pit mine, planning, optimization, stochastic models, coal quality control, uncertainty. Scientific field: Mining Engineering ...
... and Niemann-Delius, C. 2008. Perspective of Meta heuristic optimization methods in open pit production planning. Mineral Resources Management, Vol. 24 (4), str. 143-155. Sattarvand, J., 2009, Long-Term Open-Pit Planning by Ant Colony Optimization, doktorska disertacija, The Faculty of Georesources and ...Dejan R. Stevanović. "Optimizacija i planiranje površinskih kopova stohastičkim modelima" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-05-29)
-
Побољшање ефикасности одлучивања у рударству применом линеарних оптимизационих модела
Трајче Бошевски (2021)Одлучивање и управљање у рударству је захтеван и сложен задатак изложен ризицима. Конвенционални-искуствени приступи доношења одлука, у пракси често показују слабост која се огледа у недовољној поузданости и прецизности. Предмет истраживања докторске дисертације, под називом „Побољшање ефикасности одлучивања у рударству применом линеарних оптимизационих модела“ је да, сагледавањем научних метода линеарног програмирања, приступи формирању локацијских модела који би били засновани на анализи и прилагођавању постојећих и увођењу нових претпоставки за случајеве као што је експлоатација и потрошња кречњака. У дисертацији ...Трајче Бошевски. Побољшање ефикасности одлучивања у рударству применом линеарних оптимизационих модела, [Т. Бошевски], 2021
-
An Underground Mine Ore Pass System Optimization via Fuzzy 0–1 Linear Programming with Novel Torricelli–Simpson Ranking Function
rudna sipka, optimizacija, fazi linearno programiranje, trouglasti graf, Toričelijeva tačka, funkcija rangiranjaDževdet Halilović, Miloš Gligorić, Zoran Gligorić, Dragan Pamučar. "An Underground Mine Ore Pass System Optimization via Fuzzy 0–1 Linear Programming with Novel Torricelli–Simpson Ranking Function" in Mathematics (2023). https://doi.org/10.3390/math11132914
-
Strategic Environmental Assessment in the Application of Preventive Protection for Wind Farm Noise—Case Study: Maestrale Ring Wind Farm
Determining the spatial position of wind turbines is the initial and most important phase in the development of a wind farm project. In this sensitive phase, all potential problems that may arise in the later stages of project development should be prevented by means of spatial and urban planning instruments. This makes it possible to achieve maximum use of the potential of wind in a particular space and, thus, fulfil the technical and economic requirements of the project while ...Energija,energetski inženjering i elektroenergetska tehnologija,obnovljivi izvori energije, održivost i životna sredina,električni i elektronski inženjering,kontrola i optimizacija,inženjeringBoško D. Josimović, Aleksandar Cvjetić, Božidar Manić. "Strategic Environmental Assessment in the Application of Preventive Protection for Wind Farm Noise—Case Study: Maestrale Ring Wind Farm" in Energies, MDPI AG (2021). https://doi.org/10.3390/en14196174