Претрага
95 items
-
Definition of criteria and alternatives for choosing the optimal mining method deposits when applying multi: Criteria optimization, Belgrade, June 2024
Sanja Bajić, Dragoljub Bajić, Branko Gluščević, Radmila Gaćina, Josip Išek. "Definition of criteria and alternatives for choosing the optimal mining method deposits when applying multi: Criteria optimization, Belgrade, June 2024" in Podzemni radovi, Beograd, jun 2024, Centre for Evaluation in Education and Science (CEON/CEES) (2024). https://doi.org/10.5937/podrad2444071B
-
Model for estimation of stress field in the earth's crust
Slavko Torbica, Veljko Lapčević (2016)Slavko Torbica, Veljko Lapčević. "Model for estimation of stress field in the earth's crust" in Podzemni radovi (2016). https://doi.org/10.5937/podrad1628009T
-
Geotechnical conditions of “Debelo brdo” tunnel construction on the highway E-80: Nis-Merdare-Pristina (“Peace Highway”)
The construction of the highway E-80 has begun in Serbia, which will represent the traffic hub of the Western Balkans and will be part of the main regional transport network of Southeast Europe. Its total length through Serbia is 77 km, and one part of the route is designed through a typical plain terrain, while a larger part of the route passes through hilly terrain. The construction of the tunnel “Debelo brdo” is planned partly in an open cut ...Dragoslav Rakić, Irena Basarić Ikodinović, Radojica Lapčević, Dragan Lukić. "Geotechnical conditions of “Debelo brdo” tunnel construction on the highway E-80: Nis-Merdare-Pristina (“Peace Highway”)" in Proceedings of the XVIII ECSMGE 2024 geotechnical engineering challenges to meet current and emerging needs of society, Lisbon, 26-30 August 2024, CRC Press (2024). https://doi.org/10.1201/9781003431749-356
-
Rock excavation methods in urban areas
Stefan Milanović, Lazar Kričak, Milanka Negovanović, Nikola Simić, Jovan Marković, Nikola Đokić (2023)Povećan obim građevinskih radova, koji podrazumevaju izgradnju novih stambenih i poslovnih objekata, hotela, garaža, tržnih centara i slično, sve je češći u urbanim sredinama. Ovakvi radovi sve više dolaze u kontakt sa različitom vrstom problema prilikom izgradnje, kao jedan od tih problema izdvajamo pojavu čvrste stenske mase prilikom otkopavanja na lokacijama izgradnje budućih objekata predviđenih građevinskim projektom. Prilikom izgradnje objekata tj. dela objekta koji podrazumeva podzemne prostorije nekog objekta, potrebno je vršiti iskop materijala na lokaciji, međutim taj materijal ...Stefan Milanović, Lazar Kričak, Milanka Negovanović, Nikola Simić, Jovan Marković, Nikola Đokić. "Rock excavation methods in urban areas" in Podzemni radovi, Beograd : Rudarsko-geološki fakultet (2023). https://doi.org/10.5937/podrad2342047m
-
Approach to operational mine planning: Case study Tamnava West
... regarding current excavation (real time excavation). For that purpose, discretization of model needs to be further conducted, to the level of excavator’s cuts. The reason for this is excavation technology of bucket wheel excavator (BWE) which is based on individually excavation of one cut. In ...
... clay sub-seam h2 – height of clay sub-seam x – part of clay sub-seam (%) Capacity of BWE is usually greatly affected by selective excavation (excavation controlled by coal quality). For successful production plan both criteria (quality and capacity) must be met. Using flexible structure ...
... Abstract: In contemporary mining industry is very difficult to achieve production targets and profit without investing effort in detailed excavation planning. It is especially true for deposits with complex geological structure and production technology, as is the case for many coal mines in ...Dejan Stevanović, Mirjana Banković, Milica Pešić Georgiadis, Ranka Stanković. "Approach to operational mine planning: Case study Tamnava West" in Tehnika, Beograd : Savez inženjera i tehničara Srbije (2014). https://doi.org/10.5937/tehnika1406952S
-
The importance of geotechnical data for deep excavation in urban centres
Rakić Dragoslav, Čaki Laslo (2012)Rakić Dragoslav, Čaki Laslo. "The importance of geotechnical data for deep excavation in urban centres" in Drugi međunarodni naučni skup Stanje i pravci razvoja građevinarstva - GTZ 2012 i Drugo savjetovanje GEO-EXPO 2012 : zbornik radova = 2nd international scientifinc meeting State and Trends of civil enginnering GTZ 2012 and 2nd Conference GEO-EXPO 20, Tuzla, BIH:Rudarsko-geološko-građevinski fakultet (2012): 541-548
-
Lost production costs of the overburden excavation system caused by rubber belt failure
Bugarić Uglješa, Tanasijević Miloš, Polovina Dragan, Ignjatović Dragan, Jovančić Predrag. "Lost production costs of the overburden excavation system caused by rubber belt failure" in Journal of Maintenance and Reliability 14 no. 4, :Polish Maintenance Society (2012): 333-341
-
Forecasting the Behaviour of the Rock Mass Before Taking Up the Excavation on a Deeper Layers of the Ore Body Borska Reka
Zlatanović Dragan, Milisavljević Vladimir, Milenko Ljubojev, Dragan Ignjatović, Zoran Stojanović (2015)Zlatanović Dragan, Milisavljević Vladimir, Milenko Ljubojev, Dragan Ignjatović, Zoran Stojanović. "Forecasting the Behaviour of the Rock Mass Before Taking Up the Excavation on a Deeper Layers of the Ore Body Borska Reka" in Mining and Metalurgy Engineering Bor no. 2, Bor:Mining and Metallurgy Institute, Bor (2015): 29-52. https://doi.org/10.5937/MMEB1502029Z
-
Geotehnički uslovi izgradnje tunela „Debelo brdo“ na autoputu E-80 Niš - Pločnik
Tunel „Debelo brdo“ nazvan je po najizraženijem relјefnom obliku na ovoj drugoj deonici autoputa E-80 Niš – Pločnik. Osnovnu geološku građu na lokaciji tunela čini Mio-Plioceni kompleks heterogenog litološkog sastava. Izgradnja tunela je predviđena delom u otvorenom iskopu dužine 240 m, a delom sa podzemnim iskopom dužine 190 m. U zoni tunela, padina je okarakterisana kao uslovno stabilna, pa bi neadekvatna zasecanja mogla da izazovu klizanja terena. Iz tih razloga, u okviru rada posebno su prikazani geotehnički uslovi izgradnje ...... Mio-Pliocene complex of heterogeneous lithological composition. The construction of the tunnel is partly planned in an open excavation 240 m long, and partly with an underground excavation 190 m long. In the tunnel zone, the slope is characterized as conditionally stable, so inadequate cuts could cause sliding ...
... presents separately the geotechnical conditions for the construction of the tunnel in open excavation (temporary excavation securing by installing piles is provided), and the geotechnical conditions for tunnel excavation with a partially modified model in relation to the proposed design solution. Keywords: ...Dragoslav Rakić, Radojica Lapčević, Irena Basarić Ikodinović, Dragan Lukić. "Geotehnički uslovi izgradnje tunela „Debelo brdo“ na autoputu E-80 Niš - Pločnik" in Četvrti Srpski kongres o putevima, 2-3. jun 2022., Beograd : Srpsko društvo za puteve Via Vita (2022)
-
Field Zoning According to the Possibility of Applying Mechanized Excavation With a Longwall Below the Town of Gacko
Dragana Savić, Jelena Majstorović (2021)Mogućnost povećanja korišćenja resursa čvrstog energetskog goriva u procesu rešavanja energetske krize koja je sve prisutnija u širem regionu, jeste pravi izazov rudarske nauke. Podzemna eksploatacija uglja je složen proizvodni proces koji objedinjuje više tehnoloških postupaka u jedinstvenu celinu: izradu podzemnih prostorija, otkopavanje, transport i izvoz, ventilaciju proizvodnog sistema, odvodnjavanje, servisiranje objekata i sistema, zaštitu i sigurnost rada. Jedan od osnovnih problema koji prati podzemnu eksploataciju uglja jeste stabilnost podzemnih prostorija i deformacije na površini terena, jer su podzemne ...mehanizovano otkopavanje, mehanizovano široko čelo, zoniranje terena, modeliranje, stabilnost, sleganje, stabilnost kosinaDragana Savić, Jelena Majstorović. "Field Zoning According to the Possibility of Applying Mechanized Excavation With a Longwall Below the Town of Gacko" in 10 th International Conference Coal 2021 Zlatibor, 13-16 October 2021, Jugoslovenski komitet za površinsku eksploataciju (2021)
-
Application of VIКOR method in the selection of an optimal splution of excavation “Borska Reka” ore deposit
Sanja Bajić, Dragoljub Bajić, Branko Glušćević, Radmila Gaćina. "Application of VIКOR method in the selection of an optimal splution of excavation “Borska Reka” ore deposit" in 9th International Conference Mining and Environmental protection MEP, 24 – 27 May 2023, Sokobanja, Serbia , Belgrade : University of Belgrade-Faculty of mining and geology (2023)
-
Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One
In order to solve serious traffic congestion in Belgrade, a number of studies regarding the Belgrade Metro construction have been carried out since 1973. However, only in 2019, the routes of the future metro lines 1 and 2 were de-fined as a part of the General Metro Construction Project. The lines are de-signed to intersect at the location of Sava Square, where an interchange met-ro station will be built. It represents a complex geotechnical structure consist-ing of three different ...Nemanja Stanic, Dragoslav Rakic, Josip Isek, Slavoljub Simic. "Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One" in Lecture Notes in Civil Engineering, Springer Nature Singapore (2024). https://doi.org/10.1007/978-981-97-8221-5_11
-
Geomechnical research for the new bucket wheel excavator testing at Open pit “Filijala”
Since 1976 cement marl excavation at open-pit mine „Filijala” is carried out by continuous exploitation technology using bucket wheel excavator SH 400 manufactured by Orenstein und Koppel (O & K) company. Due to the bucket wheel excavator time-worn and high operating cost it was necessary to replace it with new one. In order to test the new bucket wheel excavator and prove its capacity a testing zone was defined as test block for excavation, in which the bucket wheel ...Vladimir Čebašek, Nebojša Gojković, Veljko Rupar, Miodrag Pribićević. "Geomechnical research for the new bucket wheel excavator testing at Open pit “Filijala”" in Рударски гласник, Рударски институт - Београд (2020). https://doi.org/10.25075/BM.2020.07
-
Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of “Podbracan”
... the pre-project and project stage of mining, as well as during the construction of mining facilities and excavation of mineral resources. Speci�c features of the project concerning excavation of the remaining reserves of bauxite in the deposit of "Podbracan", and in this way the forthcoming mining ...
... chambers; the opening, development and excavation concept After the haulage drift reaches the ore body, bench drift EH is constructed along the �oor part of ore body to the exit into the open pit, and to the oppo- site side till the deposit excavation limit. Bench drifts have multiple purposes: ...
... purposes: preparation for the construction of exca- vation drifts and for the ore excavation, supplying fresh air, and as emergency exit from the pit. The adopted altitude difference between excavation levels is 10m, the same as the height of the benches at open pit, for the purpose of using the benches ...Aleksandar Milutinović, Aleksandar Ganić, Thamer Rayes Diyab, Rade Tokalić, Meri Ganić. "Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of “Podbracan”" in Revista Escola de Minas, School of Mines Magazine, Sao paulo, Brasil : SciELO (2015)
-
Experimental determination of best performing cut in Lece underground mine
Slavko Torbica, Miodrag Duranović, Nenad Gramić, Veljko Lapčević, Miloš Čolović. "Experimental determination of best performing cut in Lece underground mine" in Podzemni radovi (2020). https://doi.org/10.5937/podrad1935049T
-
Definisanje parametara čvrstoće na smicanje kod izvođenja kosina u ispucalom stenskom masivu
Zoran M. Berisavljević (2016-04-01)Definisanje parametara čvrstoće na smicanje ispucalih stenskih masa predstavlja jedanod najzahtevnijih zadataka mehanike stena. Geotehnička istraživanja su uglavnomograničena na rezultate laboratorijskih ispitivanja malih makroskopski homogenihuzoraka, sa kojih se vrši ekstrapolacija rezultata na terensku razmeru. Ispitivanja semogu vršiti in situ, ali su i ona ograničena veličinom korišćene aparature imikrolokacijom na kojoj se vrše ispitivanja. Pored toga, moguće je vršiti različitaispitivanja na fizičkim modelima, koja su veoma složena i skupa. Ekstrapolacijapodataka sa malog uzorka na terensku razmeru daje mnogo bolje rezultate ...naponsko stanje, ispucalost, heterogenost, čvrstoća na smicanje, geološki indeksčvrstoće, Hoek-Brownov materijal, kompozitni uzorci, dezintegracija, povratna analizaZoran M. Berisavljević. "Definisanje parametara čvrstoće na smicanje kod izvođenja kosina u ispucalom stenskom masivu" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2016-04-01)
-
Reducing environmental impact caused by mining activities in limestone mines
Radmila Gaćina, Bojan Dimitrijević (2022)Mining and its related activities have always resulted in changes in the environment and these changes can vary from one area to another. As a result of mining, several types of changes can be distinguished: destruction of land and existing vegetation, changes in terrain topography, modification in air quality, changes in surface and groundwater quality, as well as change geotechnical conditions of the rock. Environmental impact of mining have been a public concern. There is widespread global interest in mining ...Radmila Gaćina, Bojan Dimitrijević. "Reducing environmental impact caused by mining activities in limestone mines" in Underground mining engineering , Belgrade : University of Belgrade - Faculty of Mining and Geology (2022)
-
Multiple-Criteria Decision-Making in Mine Development Planning
Sanja Bajić (2023)The Borska Reka ore deposit is an experimental location where developed methodologies have been applied. It is the largest ore body within the Bor mining complex, which has been the subject of numerous studies and analyses for more than three decades. The paper focuses on the application of FAHP and the VIKOR method to address ranking of alternatives and select the optimal mining method by means of fuzzy multicriteria optimization.Sanja Bajić. "Multiple-Criteria Decision-Making in Mine Development Planning" in Proceedings of the 5th International Underground Excavations Symposium, 5-6-7 June 2023, Istanbul, Topkapi : Dinç Ofset Mat. Rek. San. ve Tic. Ltd. Şti. (2023)
-
Environmental Noise Impact Assessment for Large-Scale Surface Mining Operations in Serbia
Noise emissions are a significant environmental impact caused by the mining industry in all technological phases of surface mining, mineral processing, and waste disposal. This paper presents the role of noise impact assessment and control in large-scale surface mining operations. Mine planning develops the model of mining operations, ore excavation, and waste dumping scheduling and processing rates, including spatial distribution of mining activities. Such a level of mine planning requires an environmental impact assessment study. This can be achieved ...Uros Pantelic, Petar Lilic, Aleksandar Cvjetic, Nikola Lilic. "Environmental Noise Impact Assessment for Large-Scale Surface Mining Operations in Serbia" in Sustainability, MDPI AG (2023). https://doi.org/10.3390/su15031798
-
Status and tendencies under development and application of underground coal gasification-UCG
Podzemna gasifikacija uglja u Svetu poslednjih decenija doživljava znatnu ekspanziju u istraživanju i razvoju zbog uveliko iskorišćenih ležišta uglja i loših ekoloških efekata (pri sagorevanju u TE) na životnu okolinu. Srbija ima znatne rezerve uglja, a kada bi se za PGU koristile samo vanbilansne rezerve i otkopni ostaci bilansnih, jasno je kakvi bi bili ekonomski (a i energetski i ekološki) efekti. U radu su sagledane aktivnosti u Svetu na tom planu, pa smatramo da ima smisla i potrebe za primenu ove ...David Petrović, Lazar Kričak, Stefan Milanović, Jovan Marković, Nikola Simić. "Status and tendencies under development and application of underground coal gasification-UCG" in International Conference “Energy and Ecology Industry EEI2018”, Beograd : Akademija inženjerskih nauka Srbije (AINS) (2018)