Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine

Објеката

Тип
Рад у часопису
Верзија рада
објављена верзија
Језик
енглески
Креатор
Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović
Извор
Energies
Издавач
MDPI AG
Датум издавања
2019
Сажетак
Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the coefficient of time use of the machine. This approach is not good enough because it does not go into the structure of the availability itself and requires a high level of IT support in system monitoring. In this sense, this paper will use the fuzzy theory and the corresponding analytic hierarchy process (AHP) multi-criteria analysis to present a conceptual and mathematical model for the assessment of availability based on expert judgment. The model will be shown in the case study (on the example) of bulldozers working in the open-pit lignite mine.
том
12
Број
21
doi
10.3390/en12214044
issn
1996-1073
Subject
raspoloživost, fazi teorija, AHP višekriterijumska analiza, eksperska ocena, buldozer
availability, fuzzy theory, AHP multi-criteria analysis, expert judgment, bulldozer
Шира категорија рада
M20
Ужа категорија рада
М22
Права
Отворени приступ
Лиценца
Creative Commons – Attribution 4.0 International
Формат
.pdf
Медија
energies-12-04044.pdf

Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović. "Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine" in Energies, MDPI AG (2019). https://doi.org/10.3390/en12214044

This item was submitted on 7. децембар 2021. by [anonymous user] using the form “Рад у часопису” on the site “Радови”: https://dr.rgf.bg.ac.rs/s/repo

Click here to view the collected data.