Geotechnical conditions of “Debelo brdo” tunnel construction on the highway E-80: Nis-Merdare-Pristina (“Peace Highway”)

Објеката

Тип
Рад у зборнику
Верзија рада
објављена
Језик
енглески
Креатор
Dragoslav Rakić, Irena Basarić Ikodinović, Radojica Lapčević, Dragan Lukić
Извор
Proceedings of the XVIII ECSMGE 2024 geotechnical engineering challenges to meet current and emerging needs of society, Lisbon, 26-30 August 2024
Уредник
Nuno Guerra, Manuel Matos Fernandes, Cristiana Ferreira, Alexandre Pinto, Pedro Seco e Pinto
Издавач
CRC Press
Датум издавања
2024
Сажетак
The construction of the highway E-80 has begun in Serbia, which will represent the traffic hub of the Western Balkans and will be part of the main regional transport network of Southeast Europe. Its total length through Serbia is 77 km, and one part of the route is designed through a typical plain terrain, while a larger part of the route passes through hilly terrain. The construction of the tunnel “Debelo brdo” is planned partly in an open cut excavation with a length of 240 m, and partly with an underground excavation with a length of 190 m. The geotechnical conditions of tunnel construction in open cut excavation, and especially the geotechnical conditions of tunnel excavation, will be presented in the paper.
почетак странице
1901
крај странице
1904
број страница
4
doi
10.1201/9781003431749-356
isbn
978-1-032-54816-6
Subject
„Debelo brdo“ tunnel, temporary slopes, open cut excavation, tunnel excavation, piles
Шира категорија рада
М30
Ужа категорија рада
М33
Права
Отворени приступ
Лиценца
All rights reserved
Формат
.pdf

Dragoslav Rakić, Irena Basarić Ikodinović, Radojica Lapčević, Dragan Lukić. "Geotechnical conditions of “Debelo brdo” tunnel construction on the highway E-80: Nis-Merdare-Pristina (“Peace Highway”)" in Proceedings of the XVIII ECSMGE 2024 geotechnical engineering challenges to meet current and emerging needs of society, Lisbon, 26-30 August 2024, CRC Press (2024). https://doi.org/10.1201/9781003431749-356

This item was submitted on 7. септембар 2024. by [anonymous user] using the form “Рад у зборнику радова” on the site “Радови”: https://dr.rgf.bg.ac.rs/s/repo

Click here to view the collected data.